2014 POWER PLANT DYNAMIC BUSINESS MODEL. COMPANY’S PRODUCT 2 Innovation power plant for processing of rice husk PILOT PROJECT STARTED In stanitsa Khlomskaya.

Slides:



Advertisements
Similar presentations
LLC «Krasnodar silicon dioxide» About us 2 Purpose: production of power plants that are: based on eco-friendly and low-waste technologies work at.
Advertisements

Energy efficient technology and equipment implementation in plumbing and heating installations УКРІНТЕРМ 2011.
Chapter 11 - Income Taxes Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany Presentation.
Chapter 9 Pricing Construction Equipment. Objectives Upon completion of this chapter, you will be able to: –Identify the three main equipment categories.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
2012 Brick plant construction with annual capacity of 60 million pieces in Buj municipal district of the Kostroma region.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Why Wind?.
RENEWABLE ENERGY TECHNOLOGIES. About us TechnoАlliance Limited liability company 1.
Investment project of Ferghana plant of chemical fiber Olim F. Maksudov Director General.
RUSSIAN POWER. IN ANTICIPATION OF NEW PACES LONDON, INNOVATIONS IN THE RUSSIAN ELECTRIC POWER INDUSTRY. HOW TO ATTRACT INVESTMENTS? Pavel.
Furniture shield production in Sharja municipal district of the Kostroma region.
JSC “OGK-6” 2009 Financial Results (IFRS) April, 2010.
An investment project Creation of a demonstration object of energy effective office building.
Entrepreneurship Overview of Cash flow Entrepreneurship Agenda Business Plan Presentation Financials –Cash Flow –Notes on Forecasting (REVENUE) and Developing.
Creating a Successful Financial Plan
Energy Economics A synthetic methane plant from coal is to be constructed at a cost of $4 billion dollars. It requires 14,000 tons/day of coal (10,000.
LONG TERM ELECTRICAL SUPPLY PLAN STAFF RESPONSE TO QUESTIONS, ISSUES, AND RECOMMENDATIONS MADE IN NOVEMBER 2004 Presentation to the Gainesville City Commission.
Investment project of ONIKS Joint Stock Company Mr. Abubakir Uskenbaev Deputy Director General.
As a Book-Keeper it is important that you can identify and categorise items of business income and expenditure Income (business receipts) – can either.
OCR Level 3 Cambridge Technicals in Business Unit 4: Business Accounting Capital and Revenue.
 Statistics Canada keeps track of the Canadian Economy  They prepare Canada’s National Income Accounts: accounts showing the levels of total income and.
Pro Forma Income Statement Projected or “future” financial statements. The idea is to write down a sequence of financial statements that represent expectations.
INVESTMENT PROPOSALS for financing of PERSPEKTIVA, LLC the Russian Federation, Chelyabinsk.
Several problems in implementation of the investment programs in power industry Speaker: A.Y.Kopsov, Member of the “Nice Club”, Doctor of Technical Science,
Demand-Side Management Models & Practices in California Innovating for Sustainable Results: Integrated Approaches for Energy, Climate, and the Environment.
Kostroma, 2014 Investment proposal on creation of wood processing enterprise for pollution-free fuel (pellets) production in Sharya municipal district.
Solid Waste Association of North America City of Brandon’s “Presentation on Methane Gas Utilization” May 14, 2009 – Winnipeg.
Financial evaluation 9 March Financial Feasibility Assess the ability of the utility or developer to meet the financial obligations associated with.
Weyerhaeuser CHP Project NWPPC CHP Roundtable June 24, 2003.
Presentation by Anatoly Chubais Chief Executive Officer RAO «UES of Russia» October 2001Moscow.
Construction of greenhouse complex to grow tomatoes and cucumbers in Boguchar town, Voronezh region. Annual capacity by 3 operation year: 2 474,8 t of.
2012 Investment project of OSB production in Buj of Kostroma region.
Infrastructure and capacity development of the State Enterprise “Sea Trade Port of “Yuzhny”
Understanding Business Cash Flow. About the SBDC Eighteen Centers in Pennsylvania More than 1,000 Centers Nationwide The SBDC network.
Manitoba Association of Regional Recyclers “Presentation on Methane Gas Recovery” Tom Keep Community Development Coordinator – Environment November 7,
MESHCHOVSK FISH FARM, OOO INVESTMENT PROJECT FOR CISCO FISH GROWING 7, Gertsena Street, Meshchovsk Town, Kaluga Region,
Equipment Rating & Economic Evaluation. Course outline  Equipment rating  Economic evaluation of a flowsheet Engineering economic review Cost factors.
Generation Costs. Fuel InputProcess (Generating station) Electrical Energy output Cost of Electrical energy = Cost of fuel + processing cost.
Current Situation ENERGY SUPPLY: Dramatically increasing prices since years Naturally limited oil, gas and coal supplies constantly increasing energy consumption.
GOVERNMENT OF THE KINGDOM OF LESOTHO Water and Sewerage Company (WASCO) Greater Maseru Water Supply Feasibility Study & Preliminary Design Results of Financial.
E.ON Russia Production management September 2013 Deputy General Director on production Igor Popov.
«MALAYA SOSNOVKA» INDUSTRIAL INNOVATIONS PARK. - is situated in the centre of Russia on the border between Europe and Asia; - the territory is 88.5 thousand.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
1. Initiator and goals of the project Initiator of the project – the Investment Promotion Agency of Novosibirsk region – a specialized organization for.
INVESTMENT PROJECT Building regional garbage facilities.
CENTER OF ENERGY SAVING AND INNOVATIVE TECHNOLOGIES 89, Taganskaya street, office 8, Ekaterinburg, Russia Tel/fax +7 (343) ,
Kostroma, 2014 Investment proposal on creation of wood processing enterprise in Manturovo municipal district of Kostroma Region.
1 Construction of the waste incineration plant with the mini-CHP in Izhevsk 2015 Preliminary presentation.
Tavis Karnes.
Process Economics Factors that affect profitability
OGK-2 Group 9M 2016 IFRS Results
OGK-2 Group FY2016 IFRS Results
Investment proposal on creation of wood processing enterprise in Manturovo municipal district of Kostroma Region Kostroma, 2014.
SUMMARY Of project of deep processing of rice with production capacity 2700 tons / year * *resume has familiarization and approximated character, preserving.
Manajemen Industri Instructor: Rama Oktavian
PRIORITY NATIONAL PROJECT
OGK-2 Group 9M 2017 IFRS Results
Results of the European Chemical Industry 2015
Welcome to Kostroma region!
Financial Appraisal of Project
Welcome to Kostroma region!
Analysis of the Financial System and the Economy
OGK-2 Group 2018FY IFRS Results
TGC-1 9М 2018 IFRS Results 9 November, 2018.
OGK-2 Group 9 months 2018 IFRS Results
OGK-2 Group 6 months 2018 IFRS Results
OGK-2 Group 3 months 2018 IFRS Results
Presentation transcript:

2014 POWER PLANT DYNAMIC BUSINESS MODEL

COMPANY’S PRODUCT 2 Innovation power plant for processing of rice husk PILOT PROJECT STARTED In stanitsa Khlomskaya of Krasnodar Region of Russian Federation parameters of one plant with a capacity of 1 MW: -processing of rice husk [10 thousand tons per year] -electric energy [1 MV per hour] -heat energy [870 kcal per hour] -oxido-carbon powder [5,6 tons per day]

3 Power Plant 1 МW Husk loading bunker Four-chamber gas generator Air-cooled transit Cooling unit Vortex Catcher Heat exchanger Scrubbers Cleaning filters Generator EQUIPMENTPERSONNEL Chief 1 pers. Power engineer 1 pers. Technical engineer2 pers. Packer 2 pers. Stockman2 pers. Guard1 pers.

4 Implementation Options Power plant capacity Area МWМW CAPEX*Construction period Payback period* m2m2 million $year ,75 6,75 10,13 12,15 15,13 18,23 20,85 21,86 1 1,2 1,4 1,5 3,8 3,5 3,4 3,2 3,1 3 2,9 year * - indicative data based on Russian prices These figures do not include additional financial savings of rice-producing enterprises such as rice husk disposal costs, ecological payments

Dynamic Business Model for 1 Power Plant (1 МW)* 3 Payback period less than 4 years CAPEX 3,75 million INVESTMENTS Current costs 0,375 million per year REVENUE Selling of oxido-carbon powder 0,9 million $ per year Selling of energy 0,9 million $ per year 5 * - indicative data based on Russian prices

6 CAPEX for 1 power plant (1 МW )* Capital expenditures for one power plant are 3,75 million $ In the case of increasing the capacity of the power plant in 2 times capital costs are increased in 1,8 times. Capital expenditures include: - Construction work (building, roads, sewerage, etc.) - The purchase of equipment and its installation - Commissioning works - Startup * - indicative data based on Russian prices All milestones of work from order to startup produced in complex, "turnkey".

7 Current costs for 1 power plant (1 МW)* Current costs for one power plant are approximately 10% of CAPEX or 0,375 million $ per year Current costs include: - Wage fund - Land rent, taxes, etc. - Expendable materials (spare parts, accessory equipment, working clothes, etc.) - Lubricants * - indicative data based on Russian prices No costs for:  fuel for power plant (rice husk is a waste of production)  utility costs (self-sufficient in heat and electricity)

8 Product sale from 1 power plant (1 MW)* Production of electric energy per year: кW*h * - indicative data based on Russian prices Electric and heat energy Production of heat energy per year: кCal*h Oxido-carbon powder Production of oxido-carbon powder per year: tons Item Quantity Rate Value Electric energy Heat energy Oxido-carbon powder кW*h кCal*h tons 0,0775 $/кW*h 0,0525 $/кCal*h 450 $/ton $ $ $ TOTAL: $ Annual volume

9 Implementation period for 1 power plant (1 МW) All milestones of work "turnkey". 3 months Design estimate documentation Construction Engineering for complete equipment with components Installation of equipment Сommissioning 3 months1 months2 months3 monthsLaunch

10 Schedule of financial flows* COSTS Time, year Money million $ 1 year 3 4 Capital expenses Current costs Revenue Profit 2 year3 year4 year5 year6 year Payback period PROFIT * - indicative data based on Russian prices ,75 0,375 1,8

12 CEO: Oleg O. Yefisko Address: office 26, 4a Plehanova st., Moscow, , Russia Tеl.: +7 (495) CONTACT INFORMATION

Thank You For Your Attention