June 2012 Investment project of Kostroma region ferrosilicon plant construction and high- quality ferrosilicon production.

Slides:



Advertisements
Similar presentations
UB Good investment conditions. The Municipality of Ub Western Serbia area of km2 close proximity of Belgrade Around 34,000 inhabitants (2002 census)
Advertisements

Studi Kelayakan (Feasibility Study) Dr. Sukardi Departemen Teknologi Industri Pertanian Fakultas Teknologi Pertanian IPB.
Using of cash flow for the financial stability and causes for changes in the amount of financial means, for the short-term planning of incomes and expenses,
2014 POWER PLANT DYNAMIC BUSINESS MODEL. COMPANY’S PRODUCT 2 Innovation power plant for processing of rice husk PILOT PROJECT STARTED In stanitsa Khlomskaya.
© Kazim Okutan – December 2014, Antalya
IRAQ MINING /9/ INTRODUCTION The state company for Mining Industries and Aquatic Insulation has performed, as a basic part of its work,
2012 Investment project of cement plant construction in Soligalich municipal district of the Kostroma region.
COST SHEET Samir K Mahajan. COMPONENTS OF TOTAL COST  Prime cost or Direct cost : It is the aggregate of direct material cost, direct labour cost and.
2012 Brick plant construction with annual capacity of 60 million pieces in Buj municipal district of the Kostroma region.
2012 Investment project of integrated house- building factory construction in Chyukhloma municipal district.
1 Understanding Project Cost Elements Lecture No. 22 Chapter 9 Fundamentals of Engineering Economics Copyright © 2008.
INVESTMENT POTENTIAL of the Kemerovo Region KazanSummit 2015 Evgeny Vostrikov, Head of the Kemerovo Region State Public Institution «Investment Raising.
1 City of Astana City of Astana is located in the North Kazakhstan. As of January 1, 2012 the area is 0.7 thousand square kilometers, the region's population.
Kuliah Ekonomi Teknik JTK FT UGM Total product cost  Total product cost: costs for operating the plant and selling the products.  Total product.
Smelting reduction technology of Alloyed steels «Taraz process-II» - II» Author: Doctor of Technical Sciences, Professor Tleugabylov S. Contacts: Almaty.
RUSSIAN POWER. IN ANTICIPATION OF NEW PACES LONDON, INNOVATIONS IN THE RUSSIAN ELECTRIC POWER INDUSTRY. HOW TO ATTRACT INVESTMENTS? Pavel.
Furniture shield production in Sharja municipal district of the Kostroma region.
INFORMATION ABOUT THE INVESTMENT PROJECT “The production engineering of the reducer gear drive high pressure fuel pump for complete set of JSC “KAMAZ”
Building the future together! Review of the salaries and compensations in the building industry Presentation * The usage right to this methodology belongs.
2012 Investment project of wasteless timber processing production in Vokhma municipal district.
Presentation by Anatoly Chubais Chief Executive Officer RAO «UES of Russia» to the 18th World Energy Congress (round table) Buenos Aires.
2000 Financial Results in accordance with International Accounting Standards.
Dairy farm on 1200 head of cattle creation. Project targets are: - to enter the meat and dairy cattle breeding market of the Kostroma region and beyond;
IuliiaGoloborodko. CHAPTER 1. THEORETICAL BASIS OF COST REDUCTION ENTERPRISE CHAPTER 2. BUSINESS ANALYSIS OF DNIPROPETROVSK ASPHALT AND CONCRETE PLANT.
1 Atyrau Region The region is located in the west of the country. As of January 1, 2012, the area is thousand square kilometers, the region's population.
Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.
The open chain of conceptual Boutiques TM IMOGEN-HOME Business Project
1 Pavlodar Region The region is located in the north of the country. As of January 1, 2012, the area is thousand square kilometers, the region's.
Several problems in implementation of the investment programs in power industry Speaker: A.Y.Kopsov, Member of the “Nice Club”, Doctor of Technical Science,
Area 37,2 thousand sq. km 0,2 % of RF area Bordering 6 RF regions: Republic of Chuvashia Republic of Mordovia Republic of Tatarstan Penza Region Samara.
Student of EE-09m Group Kharchenko I.O. ALFRED NOBEL UNIVERSITY, DNIPROPETROVSK DEPARTMENT OF THE ECONOMICS OF ENTERPRICE AND INTERNATIONAL BUSINESS.
Short-term economic statistics in the Russian Federation Federal State Statistics Service Igor Uliyanov OECD Short-term Economic Statistics Working Party.
Kostroma, 2014 Investment proposal on creation of wood processing enterprise for pollution-free fuel (pellets) production in Sharya municipal district.
Convert Gas Pneumatic Controls to Instrument Air Lessons Learned from Natural Gas STAR Partners EPA’s Natural Gas STAR Program, Pioneer Natural Resources.
KHERSON OIL REFINING PLANT Reconstruction. Modernization. Development. KORP.
2012 Investment project of OSB production in Buj of Kostroma region.
Chapter Seventeen The American Economy The Economic System ~~~~~ Making Business Decisions.
SELIGDAR MINING AND CHEMICAL COMPLEX PROJECT GOAL The project goal is creating on the basis of the Seligdar apatite deposit of a contemporary mining.
MESHCHOVSK FISH FARM, OOO INVESTMENT PROJECT FOR CISCO FISH GROWING 7, Gertsena Street, Meshchovsk Town, Kaluga Region,
PRODUCTION OF BROILER HATCHING EGGS INVESTMENT PROJECT Incor, OOO Meshchovsk District.
COST SHEET Samir K Mahajan. COMPONENTS OF TOTAL COST  Prime cost or Direct cost : It is the aggregate of direct material cost, direct labour cost and.
1 CONFIDENTIAL Project information Contact Organization of production of steel welded pipes with diameter Ø 273 – 630 мм Project profitability for the.
10 Measures of Operating Capacity © 2012 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for.
1 «BM SAKHALIN» OJSC Sakhalin oblast Complex woodworking operation in the Sakhalin oblast CONSTANTINE EDUARDOVICH BEZNOSYUK General Director at “BM SAKHALIN”
«MALAYA SOSNOVKA» INDUSTRIAL INNOVATIONS PARK. - is situated in the centre of Russia on the border between Europe and Asia; - the territory is 88.5 thousand.
Strategy of economic and social development of St. Petersburg until 2030 Committee for Economic Policy and Strategic Planning of St. Petersburg
2013 Investment project on plywood production in Antropovo municipal district of Kostroma region.
Investment opportunities of Kostroma Region Moscow,
JSC «Metal structures plant of Toytepa». is the largest plant specialized in manufacturing of metal construction structures in Central Asia.
«FINANCIER» Brief presentation of the investment project.
INVESTMENT PROJECT Building regional garbage facilities.
GTL technology: innovation vital for Russia Institute for Financial Studies (Moscow)
Kostroma, 2014 Investment proposal on creation of wood processing enterprise in Manturovo municipal district of Kostroma Region.
Tyumen Region  .
of the consolidated financial statements
Feasibility Study for Thermoforming Production Plant
Investment proposal on creation of wood processing enterprise in Manturovo municipal district of Kostroma Region Kostroma, 2014.
Capital Budgeting 2 2.
Management company of a special economic zone
KVARTS QVARTZ.
Ways of enterprise profitability improving
PRIORITY NATIONAL PROJECT
Republican Unitary Enterprise “Belarusian Nuclear Power Plant”
Results of the European Chemical Industry 2015
10 Measures of Operating Capacity.
Welcome to Kostroma region!
Financial Appraisal of Project
Welcome to Kostroma region!
JSC «TASHGIPROGOR».
Presentation transcript:

June 2012 Investment project of Kostroma region ferrosilicon plant construction and high- quality ferrosilicon production

Ferrosilicon is an alloy of iron with silicon. Silicon increases the hardness of steel, tear resistance, the limits of fluidity and elasticity, increases the resistance to oxidation, reduces energy losses. Ferrosilicon, produced at the enterprise using high-quality quartz sand and charcoal, has minimum of impurities such as sulfur, phosphorus that is necessary in the high-quality steel production. % Ferrosilicon production in Ferrosilicon is produced at the following Russian plants: – “Serovsky plant of ferroalloys” OJSC; – “Tchelyabinsky electrometallurgical plant” OJSC; – “Kuznetskie ferroalloys” OJSC; – “Bratsky plant of ferroalloys” LLC; – “Novolipetsky metallurgical plant” OJSC. 1. Characteristics of ferrosilicon production sector

Яковлево Нагатино Вяхирево СтруковоЕкимово Галичское озеро Васильевское Вострилово Сальково Абабково Горки Апушкино Челсма Починок Nagatinskoe deposit of molding sands is situated 12 km to the West from Galich (Kostroma region). Useful layer capacity is from 1,1 to 29,7 m. Overburden is represented by morainic loam and clay glacial sands with the capacity from 4,0 to 16,0 m. License for the right of bowels use belongs to “Nagatinskie industrial sands” LLC. 2. Location of the Nagatinskoe deposit of molding sands

Production capacity of the main product – ferrosilicon FS75 – tons per year. Plant’s main workshops Technical structure of the main equipment Preparatory workshop Acceptance and preparation of charge materials Briquette-making workshop Preparation of mixture and briquetting Metallurgical workshopReceipt of liquid ferrosilicon Filling of ferrosiliconFilling workshop GranulationCrushing and packaging Energy workshopElectricity production Bunker and metering devices complex Equipment for grinding of charcoal Briquetting materials mixer Briquetting equipment Thermal electric furnaces RKZ-6,3 Filling machines Equipment for grinding and sorting of ferrosilicon Packaging equipment Conveyor system Hoisting-and-transport equipment Gas-power station equipment 3. Plant’s plan. Production capacity

№Stage Period IIIIIIIVIIIIIIIVIIIIIIIV 1 Project development. Technical regulation development. Project and construction working plan development 2 Working project development including construction documentation for non- standard equipment development 3 Industrial site reconstruction and building. Equipment manufacturing. RMC. Personnel formation. Starting-up and adjustment works 4 Plant functioning in permanent mode of operation 4. Stages of project realization

Investment volume, million RUR st half of 2014 Buildings and constructions Equipment and RMC Project Total Total project value – million RUR NPV – 128,7 million RUR IRR – 9,2% Payback period – 5,9 years 5. Investment volume

PositionAmount Сaverage salary (thousand roubles per month) Payments Management Administration515 Monthly, during the whole project period Guarding1015 Monthly, during the whole project period Specialists2025 Monthly, during the whole project period Management1050 Monthly, during the whole project period Production Production workers13025 Monthly, during the whole project period Workers, employees, engineers, not engaged in production 2025 Monthly, during the whole project period Marketing Marketing specialists535 Monthly, during the whole project period The number of new working places – 200 * Amount of constantly working personnel and salary is defined below. It is expected a growth of wages co-ordinated with the rate of inflation. Serious attention will be paid to the labour protection and fire safety. 6. Personnel plan

Indicator Value, million RUR Total revenue Sold products costs280,45560,9 Gross profit519, Profit tax103,95207,8 Net profit415,6831,2 Cumulative net profit415,61 246, ,23 740, ,6 Factors of investment project realization success: There is no ferrosilicon plant in European Russia (with the exception of ferrosilicon production workshop for own needs with capacity of tons at Novolipetsky metallurgical plant); The presence of large ferrosilicon consumers: Tcherepovetsky metallurgical plant, metallurgical plant «Electrostal’», «Tulachermet», Starooskolsky plant, Izhorskie plants, Volgogradsky metallurgical plant; Own raw materials (quartz sand), restorer, charcoal, own power energy provides low prime cost; High quality of ferrosilicon defined by presence in its structure of charcoal with low content of harmful impurities (sulfur and phosphorus). 7. Major financial and economic indicators. Factors of investment project realization success