Kirby & Richmond. D C A B KIRBY 3 Lanes each way Center continuous turning lane Utilities Run along the West side Green space on the side between street.

Slides:



Advertisements
Similar presentations
West County Transit Enhancement Plan Monday, May 16, 2011 Hercules City Hall WCCTAC member agencies City of El Cerrito City of Hercules City of Pinole.
Advertisements

West County Transit Enhancement Plan Tuesday, May 24, 2011 El Cerrito City Hall WCCTAC member agencies City of El Cerrito City of Hercules City of Pinole.
12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Kalamazoo Concept #1 Two plazas at intersection of 52 nd and Kalamazoo fronted with curved.
Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
Washington Street Redesign Andrew Brunn, Kamila Misiak, Sarah Thomas The Long Term Solution.
Example of an Appropriate Development Concept for the Hine Junior High School Site This concept is an example of how the site could be developed for the.
GreenPlan Downtown Design and Greenberg Development Services Report.
JIM MINER REALTOR®. CRITERIA USED  3-7 ACRES  43,560 SQ FT IN ACRE  GREAT LOCATION  CHEAP PRICE  MEETS CITY ORDINANCE  ANY ZONE  GENERALLY ON A.
By Megan Hultz & Jade Reisland Shopping Centers Group of retail and other commercial establishments that are planned, developed, owned, and managed as.
Traffic Signals, Signs and Pavement Markings  are used for traffic control to provide a smooth, orderly flow of traffic Remember: Obey all signs and signals.
8800 Richmond Highway Redevelopment working together to redevelop and clean up the environment.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Reston Master Plan Thoughts on transportation. Focus is important Without the proper transportation groundwork other plans will fall through.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
South Coast Rail Project February 28, 2014 Stoughton Town Hall.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Jamesburg VPS Generating a Shared Vision for the Future JAMESBURG, NJ Public Meeting Visual Preference Survey.
Contact: Beth Morris
We start at Stars and Stripes Park Hefner Lake, South by ball diamonds– here we have a group gathering, instructions, distribute maps. Head.
1 Think Big – Build Small Presented to White Flint Sector Plan Advisory Committee Nov, 2007 Presented by Natalie Goldberg.
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
March 8, 2005 Pedestrian Connections  Some key arterial segments are missing sidewalks (Meridian, 1 st and 15 th Ave).  ¼ of the residential areas have.
Building Healthy Communities “ Healthy Places and Healthy People Go Together” Kate Whitehead, BS Tim Scandale, BS Selina Rooney, RCDC Funded through a.
CitywallCitygate St James Boulevard Newcastle Upon Tyne NE1 4JH Tel: +44 (191) By Road There is a pay and display parking facility to the front.
Transportation Tuesday TRANSPORTATION TUESDAY Stopping & Parking You should never park or stop your vehicle on busy traffic lanes or in no waiting and.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Stop Sign This is a traffic sign. This means to stop. It helps us be safe when driving.
The Shoppes at Fox Run Subject Site Analysis: What is the Competition? By: Five person team.
R ECENT T RANSIT O RIENTED D EVELOPMENT IN S AINT P AUL F INANCED BY THE P RIVATE M ARKET.
Student(s) Drop Off and Pick Up Our goal is to make the school community safer.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Neighborhood Commercial on 5601 North Pine Hills Road Small Scale Land Use Amendment Application for.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Roosevelt Open Spaces & the community experience Bryce Anderson.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
Webster’s El Camino Real. Private Parking Lots El Camino Real in Webster is a four-lane thoroughfare with center median and curb-and-gutter construction.
Kirby Drive Enhancement Project at IH-59 FiftyNine Design Nikki Conley Michael Cox Michael Milton.
America Walks Assessing the Path of Travel: Considerations and Effects on Older Adults and Persons with Cognitive Disabilities.
Dennis Schroeder ED 142 9/14/06 Construction Systems.
 Rice Street Traffic Study Proposal Presentation to the Saint Paul CIB Committee March 31, 2015.
Residential – part B RAILROAD SITUATIONS What must you do at all railroad crossings? Slow down and check both ways. However, you must stop when the.
Bowman Visits Carrington LinkND Community Impressions June 1 st & 2 nd.
Safety Signs. Traffic Light Ahead Slow down and prepare to stop.
West County Transit Enhancement Plan Monday, May 23, 2011 Richmond City Hall WCCTAC member agencies City of El Cerrito City of Hercules City of Pinole.
SPEED TABLES FOR CORONADO ROAD BETWEEN 7 TH STREET AND 10 TH STREEET.
University of Kentucky College of Agriculture Landscape Architecture Franklin-Simpson County Potential Neighborhood Development Strategies 158 acres Close.
 Every sign’s shape and color have special meaning  Regulatory Signs: Signs that set limits, or give commands.  Example: stop sign, Yield, One Way,
Block 37 Zoning & Design Guideline Evaluation May 15, 2014.
Ayers/Saint/Gross Architects and Planners DAVIDSON CONCORD FRAMEWORK PLAN CONCEPTS.
Harrisburg Overpass Construction Update July 7, 2015.
Directions to 2nd Street Gate
City of Stoughton Comprehensive Plan Update
Will’s Trace Subdivision
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
District 3 Complete Streets Projects
Nolanville Main Street Sidewalk & Bicycle Connectivity
PEDESTRIAN + CROSSWALK = STOP!
A Vision For Camberwell – Improving Streets and Public Spaces In SE5
University Line Houston, Texas Arch 5604 Spring 2008 Andrew Tyler
Changes to Pace Master Campus Plan 1. Pod A Tear down Randall House, build new Lower School building in its place. Add new parking in front. 2.
Signs Test.
ROOSEVELT CITY GENERAL PLAN 2010
M-1.
Directions 道案内の基本表現 をマスターしましょう。.
Fulton Transit The Fulton Street catchment area for the transit system comprises a remarkable seven stations of the subway and PATH. These are centered.
With funding provided by the Appalachian Regional Commission
Alex Henry FDOT District Seven Safety Office
Presentation transcript:

Kirby & Richmond

D C A B

KIRBY 3 Lanes each way Center continuous turning lane Utilities Run along the West side Green space on the side between street & pedestrian Access to I-59 to the south.

RICHMOND 3 Lanes each way eventually merges to 2 further east Center lane is filled with median, typically green in nature. “slows” traffic Utilities run along the north side Plans to include a METRO light rail Greenway Plaza to the west

A A Site A – NW corner Retail/Service - Citgo gas station and convenience store Roberts Carpet and Fine Floors Business - Remax Notes Hard Bus Stop Electric Poles on both sides Green on the East side Street side buildings, little additional parking

B B Site B – NE corner Retail/Service - Super Cuts PRO Beauty Supply Envision Nails Office Depot Food - Sushi King TCBY Yildizlar Middle Eastern Cuisine Little Pappasitos Notes Heavy in retail Large parking lot Barrier fence Busy Good location for GW Plaza Bench for bus stop along R

C C Site C – SE corner Retail/Service - Ninfas Business - Baylor Family Medical Notes Ninfas busy at lunch Not as good of a location as B Soft bus stop along Kirby, hard stop on Richmond Green side along Kirby

D D Site D – SW corner UNDER DEVELOPMENT Retail area with large corner parking lot

Strengths Excellent Zone for Lunch Use of Trees as a buffer Nice walking paths Lots of variety, food and use Manages current traffic load well

Weaknesses Lack of residential Lunch only crowd Construction Zone Fence between papa’s and the center, unable to walk through the site Crossing the street is never consistent (6 lanes to cross)

Opportunities More parking More retail Corner signage (for retail) Medians on Kirby to match Richmond New shopping center to be something complementary Provide safe pedestrian crossing

Threats Light Rail Competition for parking How to get out Becoming a higher traffic area Business being threatened by light rails