1 AC TRANSIT Hydrogen Infrastructure Sacramento February 1, 2007 Mallory Nestor-Brush.

Slides:



Advertisements
Similar presentations
Emergency Preparedness and Response
Advertisements

Fired And Unfired Pressure Vessels
Valley City State University | Facilities Services
Tulane University - Office of Environmental Health & Safety (OEHS) FIRE SAFETY – RESIDENTIAL FACILITIES For all staff members in Housing and Residence.
Status of Hydrogen Station and Fleet Demonstration at Penn State Joel R. Anstrom, Ph.D. February 2007 Director of Hybrid and Hydrogen Vehicle Research.
Utility Management Providence Health System - Oregon Environment of Care.
April 23, 2015Committee for Sustainability Building Systems and Energy Use Drexel University April 24, 2008.
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
High-Rise Hotels New Codes General Fire Safety Information Ted Erb Fire Prevention Officer Bellevue Fire Department April
Fire Safety The “Fire Triangle” identifies the three components of any fire: –Fuel paper, wood, flammable gas, energized electrical equipment, etc...
The Life Safety Surveyor Facility Tour
Texas Department of Insurance State Fire Marshall’s Office Sixth Report on State University Fire Safety January 2002.
Hydrogen Workshop for Fleet Operators. Module 3, “Vehicle Operations and Maintenance Facilities”
Gasoline is made from fossil fuels …mostly oil Fossil Fuels Oil pumped from the ground.
Means of Egress and Fire Protection. 2 Objectives Understand Alarms and Warning Devices Know the location of Exits and Exit Routes Understand the RACE.
FIRE PREVENTION AND SAFETY PRACTICES Health Science.
Prevent False Alarms Eugene A. Cable, P.E., M.S.F.P.E. Life Safety Consultants NEHES Honorary Member 412 Horse Heaven Road Averill Park, New York
Cost effective hydrogen transport and emissions reduction Amanda Lyne Green Fleet Scotland 2015.
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
Hydrogen Workshop for Fleet Operators. Module 8, “Hydrogen Lifecycle Costs, Training & Useful Information”
Public Transit Department Bus and Fuel Procurement Strategy AzTA/ADOT Transit Conference April 2013.
Patrick Thornton, SNS/FPE June 9, 2008
The Board of Governors of Exhibition Place June 2008 ENERGY ACTION PLAN.
Bellringer. Alternative Energy -To achieve a future where energy use is sustainable, we must make the most of the energy sources we already have and develop.
Michigan’s Hydrogen Rules Department of Environmental Quality.
Hydrogen Fueling Station Development: Perspective from an Equipment OEM Energy Exchange Phoenix, AZ 8/12/15.
Alternative Fuel Readiness Plan for San Mateo County Overview of AFRP Presented to RMCP Meeting January 21, 2015.
HCATT OVERVIEW Thomas L. Quinn Hawaii Center for Advanced Transportation Technologies 531 Cooke Street, Honolulu, HI
SARTA FUEL CELL BUS AND FUELING PROJECT. SARTA Key Facts Transport 2.7 million passengers in employees $18 million budget Operates express routes.
Leadership Asheville Gary Jackson City Manager Public Leadership and Delivering Better Service to Citizens for Less Money.
A New Regional Vision ASPA Conference April 2010 Steve Heminger, MTC Executive Director.
Fire Prevention for Construction. Four classes of fires  A, B, C, and D 1a.
Bridge Toll Increase for Transit Senate Select Committee June 3, 2002.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
AC Transit Hydrogen Energy Station / Oakland Fire Department Project AC Transit Hydrogen Energy Station / Oakland Fire Department Project You want to do.
Permitting Hydrogen and Fuel Cell Installations in Canada An Update Pierre Gauthier, H2E North America Air Liquide Sept nd International Conference.
11/08/01 1 SunLine’s Fuel Cell Bus Demonstration Program Presented to the California Transportation Commission June 03.
The Emerging Fuel Cell Electric Vehicle Market Catherine Dunwoody Executive Director.
Renewable EnergySection 2 Section 2: Alternative Energy and Conservation Preview Bellringer Objectives Alternative Energy Tidal Power Ocean Thermal Energy.
Chapter 5-Fire Safety Developing Effect Ways to Prevent and Deal With Fires in Your Home.
1 High-Speed Rail Evaluation October 12, 2007 Planning Committee.
Presented at 2006 Fuel Cell Seminar Honolulu, HI November 15, 2006 Thomas L. Quinn Hawaii Center for Advanced Transportation Technologies 531 Cooke Street,
© 2011 Pearson Education, Inc. AP Environmental Science Mr. Grant Lesson 103 Ocean Energy Sources & Hydrogen.
The Chicago Transit Authority Sustainability Initiatives.
SCHATZ ENERGY RESEARCH CENTER Comparative Performance of Electrolysis Cell Stacks at the HSU Hydrogen Fueling Station Meg Harper Schatz Energy Research.
Maine State Fire Marshals Office1 Laws and Codes Relating to Existing Apartment occupancies in the State of Maine Mark Stevens CFI-II, CFPS, CFPE Inspections.
Hydrogen Fuel And its place in our future. Some Chemistry 2 H 2 + O 2 2 H 2 O kJ.
Status of Hydrogen Station and Fleet Demonstration at Penn State Joel R. Anstrom, Ph.D. Director of Hybrid and Hydrogen Vehicle Research Center at the.
Southeast Financial Center
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
Safety of premises P. K. Frandsen SM 18 LHC Magnet test review 21 JUN 2005.
1 National Hydrogen Association March 2007 Conference Hydrogen Transportation Systems in New York State.
U.S. Department of Transportation Changes to Accommodate H2 as an Alternative Fuel in Commercial Vehicles Quon Kwan & William Chernicoff U.S. Department.
Hot Work Permit Osan AB Fire Emergency Services.
Fuel Cell Bus Evaluation Results NHA Hydrogen Conference 2008 April 1, 2008 Leslie Eudy, NREL Kevin Chandler, Battelle.
Family Law Center 1115 Congress
Infrastructure & Safety
Proposed Changes to the 2009 International Building & Fire Codes
What Library Staff Should Know About Fire Safety
Fire Alarm Systems for Emergency Operations of Elevators
Hydrogen Vehicle Readiness on the Central Coast
Flammable and Combustible Liquids
Fire Safety for MSO, Residents, Medical Students and Nursing Students
Juvenile Justice Center 1200 Congress
Because Technology Never Stops
Fire Safety for MSO, Residents, Medical Students and Nursing Students
Firefighting equipment
Criminal Justice Center 1201 Franklin
Risk Management Student Powerpoint
Presentation transcript:

1 AC TRANSIT Hydrogen Infrastructure Sacramento February 1, 2007 Mallory Nestor-Brush

2 68 Million Impressions

3 TODAY AC TRANSIT HYROAD PROGRAM RICHMOND STATION OAKLAND ENERGY STATION MAINTENANCE BAYS EMERYVILLE STATION (PLANNED)

4 AC Transit Regional Role One of 14 transit operators »San Francisco MUNI »BART (Capitol Corridor) »AC Transit »VTA »Samtrans »Caltrain »Golden Gate »County Connection »ACE »Wheels, Tri Delta, Vallejo, WestCAT

5 Service Area Serving 1.5 million people in 13 cities 64 million passengers 696 buses 2,302 employees $250 million budget 105 lines (27 transbay)

6 Three new 40’ fuel cell buses Nine Hyundai Tuscon fuel cell vehicles Electrolyzer hydrogen energy station Steam reformer based hydrogen energy station & educational learning center Two fuel cell bus maintenance bays Overview of AC Transit’s Hydrogen Fuel Cell Bus Program

7 Hydrogen Fuel Cell Bus

8 3 – 40' FC Hybrid Buses 18% Sustained Grades 65 mph max. speed Noiseless Plus one bus for SunLine Transit

9 DOE Light-Duty Demonstration 9 Hyundai Tuscon Fuel Cell SUVs Operated by AC Transit Road Supervisors

10 28 Partners – $21 Million

11 RICHMOND STATION

12 Richmond Hydrogen Station First CaFCP Satellite Station Onsite Water Electrolysis: 24 kg/day; $10+/kg In Service Since October 2002 Partnership with CaFCP and Hydrogenics

13

14 30' ISE/UTC Prototype FC Bus September 2003 – October ,000 Miles in Oakland, Berkeley, Richmond, and El Cerrito 7.5 mpg equivalent (2x Diesel Bus) 83% Availability

15 CITY OF RICHMOND PERMITTING PROCESS 10/19/01 Zoning Land Use Application and Environmental Info Form 2/22/02 City of Richmond approves Negative Declaration 5/13/02 Design Review Application 6/06/02 City of Richmond Planning Commission approves Conditional Use Permit (CUP) 8/21/02 All permits secured for construction and Fire Marshall authorizes use of Dynetek tanks for ground storage 10/30/02 Grand Opening

16 CITY OF RICHMOND CONDITIONAL USE PERMITS (CUP) The approved fueling station is for research and development purposes only and shall not be converted to commercial use except through the process of amending this CUP. Safety relief devices shall be arranged to discharge upward and unobstructed to the open air in such a manner as to prevent any impingement of escaping gas upon the container.

17 OAKLAND ENERGY STATION

18 Oakland Energy Station Scheduled startup – NOV 2005 Onsite Natural Gas Reformer 150 kg/day; ~$4 to $5/kg Stationary Fuel Cell – Facility Power Maintenance Center for Buses

19 CITY OF OAKLAND PERMITTING PROCESS 01/03 Met with Fire Marshall for Overview of HyRoad Program 01/04 Nexant/ACT met with City of Oakland Fire Marshall 02/05 Submitted plans and request for environmental review to the City of Oakland 03/04 Met with City of Oakland Design and Development Committee (DDC) with two options for stations (liquid or gas) 03/04 Entered into partnership with Chevron for construction, operations and maintenance of energy station 04/05 Notice of Exemption – minor alternative to existing facilities 06/05 Construction Start 11/05 Construction Complete

20 Hydrogen Energy Station – Oakland, CA

21 Dispensers – 15 min. fuel 5,000 psi; Digital Communications fill Compression and storage room – psi Reforming room – 2 trains; 150 kg/day Vehicle maintenance bay – two 40’ buses

22 Hydrogen Energy Station – Oakland, CA

23 Hydrogen Energy Station – Oakland, CA

24 Hydrogen Energy Station – Oakland, CA

25 Hydrogen Energy Station – Oakland Alarm Indications Strobe and siren: indicates fire condition, fire department notified > pull station activated or, > smoke detector activated or, > two or more flame detectors activated or, > both vent stack flame arrestors high temperature indication. Red light: indicates hazardous condition exists, evacuation from area is required Yellow light: indicates problem is or has occurred, latching Green light: indicates normal operation

26 HyRoad Learning Center Adjacent to the hydrogen fueling station For visitors, especially schoolkids Includes working FC exhibit Includes labs, exercises, and fun activities Will be staffed by local docents

27 MAINTENANCE BAYS BAY 4-SEMINARY DIVISION

28

29 Maintenance Bay 4

30 Maintenance Bay 4 Safety Features Buses depressurized to 600 psig before entering bay Hydrogen leak and fire detection (thermal) systems Ignition-free space heating system Anti-static, non-skid, grounded floor covering If H 2 leak detected (20% LEL): garage doors automatically roll up, ventilation fans turn on, heating system shuts off, magnetic doors release If H 2 leak detected (40% LEL) or fire detected: fire department automatically notified, all electrical power to Bay 4 disconnected (except vent fan and emergency equipment), alarm sounds and building evacuated

31 EMERYVILLE STATION (PLANNED)

32 Emeryville Energy Station Scheduled startup – 2007 Solar-powered Pressurized Electrolyzer 20 to 24 kg/day $750K DOE Grant/ $165K Matching Grant

33