Richmond/San Rafael Bridge HIGH CAPACITY MICROPILE CONSTRUCTION AGRA Foundations, Inc.

Slides:



Advertisements
Similar presentations
Cofferdam.
Advertisements

July Training Outline Part 1 Cost-per –SF and Detailed Estimate Pay Item Detailed Estimate Segments Bridge Level Data Segment Level Data Supports.
1 Prepared for: International Society for Micropiles (ISM) 2009 International Workshop on Micropiles London, England May 13 th, 2009 A DECADE OF LOAD HOLD.
The Geology and Geological History of Vancouver Island Steven Earle, PhD Department of Geology Malaspina University-College Nanaimo, British Columbia,
By: Adil Godiwalla, P.E. Houston Airport System
By James Scarisbrick, Tom Watkinson & James Yip. Introduction Taipei 101 is a 509.2m tall skyscraper situated in the northern region of Taiwan, in the.
Geology for Engineers The San Andreas Fault: The Geological and Civil Engineering Implications.
Part 1.1 Petroleum Geology. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand the basic.
- The interaction of the world’s tallest building with the geology of the Basin the city is built in By Matthew Timmis and Mark Banham.
Drilled Shaft Construction Issues in Caving Ground and Rock Sockets
GEOL 1307 Physical Geology Exercise #6 Sedimentary Rocks.
TEK 5.11B Draw conclusions about “what happened before ”using data such as from tree-growth rings and sedimentary rock sequences.
RELATIVE TIME: When the age of rock is compared to the ages of other rocks or events in geological time. Can determine which layers are older than others.
Earthquakes in San Francisco, California - Structural Engineering Solutions -
2012 AAPL ANNUAL MEETING SPONSORS PLATINUM GOLD SILVER SAN FRANCISCO SEMINAR GOLF A wholly owned subsidiary of ExxonMobil BRONZE.
Foundation Systems.
Tectonic and Structural Landforms
Subsurface Conditions Mission Bay San Francisco, California Presented by Hadi J. Yap, PhD, PE, GE DTX Project Meeting San Francisco County Transportation.
GEOTECHNICAL PROPERTIES (CE1203)
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
Damage Illustrations. Potential Bridge Damage Bridge Component / DamagePossible Cause Approach Slab or Pavement  Raised, lowered, cracked, or buckled.
Chapter 18 Foundations.
FOFFF.
California Rock Stories
1. California Rock Stories Linking tectonics to rock formation 2. Geologic History of California: Part II Ellen Metzger BAESI – July 2012 Source of photos:
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER.
Continental Growth. Most continents used to be smaller. Through tectonic processes, rock has been added to continents.
Harry Williams, Geomorphology1 Soils on Slopes – Summary: A soil on a slope has strength because of inherent frictional properties, cohesion and normal.
TEK 5.11B Draw conclusions about “what happened before” using data such as from tree-growth rings and sedimentary rock sequences.
Catalyst: Objectives Homework
Lecture 28 Earth’s Interiors. Erosion. Earthquakes Structure of the Earth’s Types of Erosion Chapter 14.6 
Gerord Neil Jr Joel Villalobos Period 4 Arch. Design.
No Cell Phones, Please. Thank You.. Division of Layne Christensen Company Specialty Foundation Construction Jet Grouting Drilled Micropiles Vibratory.
Outline of the Execution Manual for Seismic Retrofitting of Existing Pile Foundations with High Capacity Micropiles Masashi ITANI Takeshi OSHITA Seiichi.
News systems-can-cut-your-carbon-footprint-and-your- commute/
News systems-can-cut-your-carbon-footprint-and-your- commute/
California Rock Stories Linking tectonics to rock formation Ellen Metzger BAESI – October 8, 2011.
Relative Time: Ages of events are placed in order of occurrence. No exact date is identified.  Ex. WWI and WWII  Ex. I am the second child in my family.
San Francisco-Oakland Bay Bridge West Approach Seismic Retrofit Project.
Foundation Loads Dead Load Live Load Wind Load
Metamorphic Rocks Change is Good.
1 Caltrans District 4 - ABAG Workshop - INFRASTRUCTURE INTERDEPENDENCIES January 31, 2012 California Department of Transportation (Caltrans) www. dot.ca.gov.
Caltrans Bridge Construction Forum 2007
Typical Bridge Components
Vulnerable Structural Elements
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
Development and Application of High Strength FRP Pipes as Grouted- Reinforcing Members in Slope and Tunnel KSCE Annual Conference and Civil Expo 2004 Daewon.
Section Engineers Meeting March 6, 2014 Lexington, KY.
CONDON-JOHNSON & ASSOCIATES, INC. ______________________________ CONTRACTORS AND ENGINEERS Perris Valley Line Commuter Rail Extension.
IWM 2004 Tokyo, Japan Micropile Foundations Johnson City Medical Center Johnson City, Tennessee John R. Wolosick, P.E. Hayward Baker Inc. Atlanta, Georgia.
Introduction to Geotechnical Engineering
Required Drawings and Info for Formwork or Scaffold Design
FOOTING AND FOUNDATION
Richmond/San Rafael Bridge HIGH CAPACITY MICROPILE CONSTRUCTION
John R. Wolosick, P.E. Hayward Baker Inc. Atlanta, Georgia
Chapter 5: Substructure
No Cell Phones, Please. Thank You..
Label from oldest to youngest
Sedimentary Rocks Let’s break It down….
Topics on Micropiles in Japan
Pre-loaded micropiles at Credit Valley Hospital – …..Revisited
GEOLOGIC MAPS.
Pier Foundations Piers Suspended floor Ground beam Next slide.
SCIENCE GRADE SEVEN – EARTH MATTERS
11.3 –Mountain Formation.
Mountain construction and destruction
Plate Tectonics.
Presentation transcript:

Richmond/San Rafael Bridge HIGH CAPACITY MICROPILE CONSTRUCTION AGRA Foundations, Inc.

Completed in 1956, the 5.5 mile long bridge sits between two fault lines in the San Francisco Bay. The bridge connects the cities of Richmond and San Rafael as part of Interstate 580. Richmond/San Rafael Bridge Photograph courtesy of California Department Transportation

Site Location Richmond/San Rafael Bridge San Francisco HAYWARD FAULT SAN ANDREAS FAULT

Project Hierarchy Date bid: August 08, 1999 Owner: California Department of Transportation General Contractor: A Joint Venture of Tutor Saliba/Koch/Tidewater Prime Subcontractor: AGRA Foundations, Inc.

AGRA’s Scope of Work `` 66” Dia. CIDH Piles 150” Dia. CIDH Piles Substructure Micropiles Superstructure Micropiles

Substructure Micropiles Pile Data Micropiles This table represents 31 pier locations with 476 production piles and 5 performance piles. Load range from 290 kips to 1140 kips

Substructure Micropile Note Spirals at base of pile and rings at Micropile top (inside the bell) Typical CRIP

Prerequisites to Micropiles Work Platforms

Micropile Installation Templates Hinge Locations Templates were constructed to accurately locate the micropiles

Micropile Installation Templates Completed Templates and Conductor Casing Templates in place on Bridge Template Connector

Micropile Installation Conductor Casing Rubber Seat Bell Coring Grooving Pipe placed from bottom of bell and socketted into bedrock (not shown) Foundation Bell Steel Bell Casing Pipe Reinforcement 14” Dia. Cored Hole with Groves Seal Bed Rock Bedrock Socket Mud line Permanent Steel Casing 12” Dia.

Geological Description The Franciscan Formation is a heterogeneous unit of sedimentary and volcanic rock deposited in an offshore, deep-marine trough at the base of the continental slope. The formation consists of massive graywacke sandstone, dark shale, minor chert and limestone, altered volcanic rock, and various metamorphic rocks. All of the rock is intruded by serpentine. The Franciscan Formation is believed to be as thick as 50,000 feet and typically found as fault-bound blocks accreted onto the western shoreline of California by plate movement.

Bed Rock Topographic Contours

Log of Test Bore Working Drawing Load Capacity Calculations

Micropile Testing

Load Test Result Summary

Construction Methods

Visit us at or contact AGRA by at