Fort Bend Flood Management Association Flood Risk Reduction Symposium October 3rd, 2014 (Part-A) Brazos River at San Felipe - USGS Gage Fort Bend County.

Slides:



Advertisements
Similar presentations
Flood Risk Analysis – the USACE Approach
Advertisements

BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
Questions concerning the Halloween Flood in Onion Creek Presentation by David R. Maidment Center for Research in Water Resources University of Texas at.
US Army Corps of Engineers BUILDING STRONG ® Public Law 84-99, Rehabilitation and Inspection Program Mike deMasi Chief Emergency Management, PL Program.
CPRA Board Meeting, Baton Rouge, LA May 15, 2013 Coastal Protection and Restoration Authority.
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
Benefits of a Flood Warning Network to Findlay, Ohio Brian C. Hurt, P.E. – Former City Engineer Findlay, Ohio.
US Army Corps of Engineers BUILDING STRONG ® Methods for Determining Maximum Flood Elevations Landward of Failed Levees: An Example from the Great Missouri.
Terrain for the Lower Colorado River Flood Damage Evaluation Project Erin Atkinson, Halff Associates, Inc. Rick Diaz, Lower Colorado River Authority Symposium.
Preparing for the Rainy Season SFWMD Operations & Actions.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
Central Valley Flood Protection Board Meeting – September 27,
1 FEMA Flood Insurance Rate Map Update FEMA Public Meeting October 22, 2009.
Mid-Barataria Diversion - Status Update committed to our coast Andrew Beall Project Manager Governor’s Advisory Commission Meeting December 5, 2012.
Illinois Drainage Water Management Demonstration Project Don Pitts Agricultural Engineer State Water Quality Specialist Champaign, IL NRCS USDA.
Welcome Rob Rash CEO/Chief Engineer St
Compensatory Mitigation in Coastal Louisiana Keith Lovell, Administrator Office of Coastal Management Department of Natural Resources 10/03/121.
Ch  Know what design frequency means  Know how to delineate a drainage area on a topographic map 2.
Hydraulic Screening and Analysis Needed for USACE Review
DAVE REED HYDROLOGIST IN CHARGE NOAA/NWS LOWER MISSISSIPPI RIVER FORECAST CENTER Datums and Stages - Importance to the NOAA/NWS Hydrologic Services Program.
Kansas City Industrial Council Hydrology and Hydraulics
CE 515 Railroad Engineering Drainage Source: AREMA Ch. 5, J. Rose Lectures, Ch. 19 “Transportation exists to conquer space and time -”
Tropical Storm Allison & its impact on Harris County
One Corps Serving The Army and the Nation Tulsa District The Tulsa District Corps of Engineers and Its Cooperative Partners.
Comprehensive Basinwide Protection Recommendations 13 Primary Principals: 1.Serve as framework moving forward 2.Establish acceptable levels of protection.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
Professional Engineering Services For Restoration Project John Mitnik, P.E. Engineering & Construction Bureau Chief Operations, Maintenance & Construction.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
Three Rivers Levee Improvement Authority (TRLIA) Briefer: Mary Jane Griego, TRLIA Board Member Three Rivers Levee Improvement Authority March, 2007.
BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
Central Valley Flood Protection Board Meeting – December 20,
October 3, 2014 Fort Bend County, TX FBFMA – 5 th Annual Symposium on Flood Risk Reduction Fort Bend County Levees: Preparing for Emergency Actions.
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
Corps of Engineers Levee Safety Program Levee Safety Program Manager
Ventura County Levee Systems Levee Certification Compliance Efforts Presentation to the Ventura County Watershed Protection District Board of Supervisors.
One Team: Relevant, Ready, Responsive, Reliable 1 MRGO Closure Status Next Steps & Status USACE & State negotiate and sign MOA Plans & Specifications for.
Comprehensive Flood Hazard Management Plan PUBLIC MEETINGS April 5-7, 2010 Rochester, Montesano, and Chehalis.
September 4, 2012 California Department of Water Resources Central Valley Floodplain Evaluation and Delineation (CVFED) Program Presented for the FMA 2-D.
US Army Corps of Engineers BUILDING STRONG ® Little Calumet River Forest Ave Levee System Periodic Inspection No.1 Yuki Galisanao, PE, PG Team Lead, Geotechnical.
US Army Corps of Engineers BUILDING STRONG ® Little Calumet River Marshalltown Levee System Routine Inspection Yuki Galisanao, PE, PG Team Lead, Geotechnical.
Timeline Impaired for turbidity on Minnesota’s list of impaired waters (2004) MPCA must complete a study to determine the total maximum daily load (TMDL)
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
Condition Assessment Of The Hurricane Protection System Larry B. Ardoin, P.E. DIRECTOR, HURRICANE PROTECTION OPERATIONS.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
Melinda Terry, Executive Director CA Central Valley Flood Control Association 1.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Presented to: Central Valley Flood Protection Board August 23, 2013 Sacramento Area Levee Accreditation Key Results from Encroachment Analysis.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Boise River, Idaho: Many Agencies Working Towards One Version of the Truth Ellen Berggren, USACE Walla Walla District Idaho Silver Jackets USACE Flood.
National Weather Service Des Moines, IA National Weather Service Des Moines, IA Iowa Spring Flood Outlook March 5, 2010 Jeff Zogg, Senior Hydrologist.
US Army Corps of Engineers BUILDING STRONG ® Lisa Mangione Regulatory Division Los Angeles District January 14, 2016 USACE Regulatory Program Emergency.
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
One Corps Serving the Armed Forces and the Nation By Eddie Brooks, P.E. Chief, Watershed Management Division Mississippi Valley Division Oct 30-31, 2007.
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
Suwannee-Satilla Drainage Basin: Flood Control Issues and Requested Action Suwannee-Satilla Regional Water Planning Council Douglas, GA December 8, 2010.
US Army Corps of Engineers BUILDING STRONG ® Name of Levee Segment Presenter Name Presenter Title Duty Location Date of Presentation.
NATIONAL WEATHER SERVICE JACKSON, MS NEW ORLEANS/BATON ROUGE, LA Pearl River Basin Watershed Town Hall March 17, 2015
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
OREGON IDAHO WYOMING COLORADO NEVADA NEW MEXICO TEXAS UTAH ARIZONA CALIFORNIA Rene Vermeeren, P.E., D.WRE Chief, Hydrology and Hydraulics Branch Los Angeles.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
Taum Sauk Dam Failure Missouri, 2005
Construction Management & Inspection
Hydrology.
Agency Logos. Hazard Mitigation Grant Program Summer 2018 California Wildfires and High Winds DR-4382.
Department for Local Government State Flood Control Match Program
Sacramento Environmental Commission January 2019.
Presentation transcript:

Fort Bend Flood Management Association Flood Risk Reduction Symposium October 3rd, 2014 (Part-A) Brazos River at San Felipe - USGS Gage Fort Bend County Levee Inspections Using USACE “RIP” Standards Fort Bend County Drainage District

BRAZOS RIVER FACTS: 1,280 Miles Long 45,575 Square Mile Drainage Area 19 Reservoirs 4,000,000+ Acre-Feet of Flood Control Storage

Lower Brazos River Watershed USGS Flood Gages: Historical Lower Brazos River Watershed USGS Flood Gages: Waco – Established 1899 Richmond – Established 1922 Hempstead – Established 1939 Highbank – Established 1966 Rosharon – Established 1967 Bryan – Established 1994 Fort Bend County Drainage District

Approximately 108 River Miles between Hempstead & Richmond gages. Contributing watershed increases by approximately 800,000 acres. FBCLID No. 20 and Pecan Grove MUD levees are located upstream of Richmond gage. Significant development occurring in northwest Fort Bend County. Previous Brazos River Flooding in Simonton / Valley Lodge Area Dec. 1991 vs Oct. 1994 Peak Elevations (Dec. 91) (Oct. 94) Hempstead: 160.90 159.48 Interstate 10: 113.40 115.50 F.M. 1093: 107.00 107.70 F.M. 1489: 101.40 102.30 Richmond: 77.63 77.10

USGS Brazos River at San Felipe Gage Located on the FM 1458 bridge near Stephen F. Austin State Park. This is the approximate mid-point between the Hempstead and Richmond gages. Installed by USGS field crews in September 2013. 13 field measurements have been taken to date in order to establish a rating curve. Peak flow to date occurred on Nov. 4, 2013 with a measured flowrate of 41,700 cfs. Funded to date by FBCDD, Gulf Coast Water Authority and USGS matching funds.

USGS Brazos River at San Felipe Gage The National Weather Service is planning to establish the San Felipe gage as a River Forecast site and create a website. They will provide 5-day forecasts based on available hydrologic, rainfall, and weather forecast data similar to the current data provided at other Brazos River gages. We are currently evaluating Fort Bend County historic data to establish flood warning stages and associated impacts. We are also working with Austin and Waller County officials to incorporate their potential flood impacts into the River Forecast website.

USGS Brazos River at San Felipe Gage USGS Link: http://waterdata.usgs.gov/tx/nwis/uv?site_no=08111850 www.fortbendcountytx.gov/riverlevels

Fort Bend County Drainage District Levee Inspections using U.S. Army Corps of Engineers “Rehabilitation & Inspection Program” (RIP) Standards 7 Major Categories Initial Eligibility General Items for all Flood Reduction Systems Levee Embankments Floodwalls Interior Drainage System Pump Stations Flood Damage Reduction Channels Each of these major categories is made up of specific inspection components called “Rated Items”. There are a total of 75 “Rated Items” evaluated during our inspections. Grades of “Acceptable”, “Minimally Acceptable” or “Unacceptable” are assigned to each of the 75 items. Fort Bend County Drainage District

Initial Eligibility (12 Rated Items) & General Items for Flood Damage Reduction Segments (3 Rated Items) These items are evaluated before the field inspections through a meeting with the District representatives. (Board Members, Engineer, Operator, Attorney) Updated contact lists, review history including dates of original construction and significant improvements, discuss jurisdictions (MUD’s, city limits, ETJ) Confirmation that the levee design meets current standards. (FEMA 44 CFR 65.10, FBCDCM Sec. 7.0) Evaluate emergency operation procedures and flood preparedness. Fort Bend County Drainage District

Levee Embankments – (15 Rated Items) Grass / Sod Encroachments Unwanted Vegetation Growth Slope Stability Erosion / Bank Caving Settlement Depressions / Rutting Cracking Animal Control Toe Drainage Systems Fort Bend County Drainage District

Floodwalls – (9 Rated Items) Tilting Sliding Settlement Foundations Joints Concrete Surfaces Encroachments Unwanted Vegetation Growth Toe Drainage Systems Fort Bend County Drainage District

Interior Drainage System – (15 Rated Items) Culverts / Discharge Pipes Sluice / Slide / Flap Gates Concrete Surfaces Tilting/Sliding/Settlement or Undermining of Outfall Structures Joints Interior Flood Storage Areas Outfall Channels Trash Racks Fort Bend County Drainage District

Pump Stations – (21 Rated Items) Maintenance, Training & Inspection Records Pumps Generators Primary and Backup Power Sources Fuel System Intake and Discharge Pipes Sluice / Slide / Flap Gates Plant Buildings Communication System Trash Racks Fort Bend County Drainage District

2. Overall Project Rating Fort Bend County Drainage District “Interim Policy for Determining Eligibility Status of Flood Risk Management Projects for the Rehabilitation Program Pursuant to Public Law (P.L.) 84-99” U.S. Army Corps of Engineers – March 21, 2014 Section 6.f.3 identifies 20 of the total 75 “Rated Items” that are specifically focused on to determine “Eligibility” for rehabilitation assistance. The levee system is eligible for rehabilitation assistance as long as they do not receive an “Unacceptable” rating on any of these 20 items. Two Separate Ratings are Issued: Eligibility Rating (Eligible or Ineligible) 2. Overall Project Rating (Acceptable, Minimally Acceptable or Unacceptable) Fort Bend County Drainage District

Fort Bend County Drainage District Levee Inspections using U.S. Army Corps of Engineers “Rehabilitation & Inspection Program (RIP) Standards Inspections to Date: FBCLID No. 17 (Telfair) First Colony LID No. 2 FBCLID No. 7 (New Territory) FBCLID No. 20 Preliminary findings are issued to the District with final report issued 6 months later. Attempting to cover as many LID representatives as possible. USACE inspects Fort Bend County levees separately for their official RIP assessment.