Public Service Company of New Mexico

Slides:



Advertisements
Similar presentations
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
Advertisements

LRS Report to PCC Wally Gibson, NWPCC Planning Coordination Committee Albuquerque, NM March 6-7, 2008.
BAL-002-WECC-1 Contingency Reserves
Northern Tier Transmission Group SPG Report to TEPPC June 17, 2010 Denver To ensure efficient, effective, coordinated use & expansion of the members transmission.
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
Transmission Planning in the West pocket guide This reference guide is intended to assist individuals new to transmission planning in the Western Interconnection.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
 Jeremy Turner, Executive Director Phoenix, Arizona May 21, 2010.
Montana Energy Summit Transmission Planning Process April 22, 2008.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
WELCOME PUC Rule 3627 Stakeholder Participation. Who we are: Xcel Energy Staff Introductions Public Service Company of Colorado.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
Reno, NV June 26,  Agenda 1. Regulatory Filings Update 2. Integrated Resource Plan Update ◦ SB 123- NVision 3. Generator Interconnection Updates.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
Topics to Cover Interconnection Process Overview
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
ISO Grid Planning Presentation to CREPC October 1, 2002
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Large Generator Interconnection Procedures Reform 2 nd Stakeholder Meeting May 5, 2009.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Standards Review Subcommittee Update August 17, 2010.
2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006.
Puerto Rico Electric Power
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Generator Interconnection Studies & Agreements Charles Hendrix.
Transition Plan Network Operations Model Change Requests 5/26/2010.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
SPP.org 1. Regional and Inter-Regional Planning Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
Summary Overview: Maryland Straw Man Interconnection Rule Prepared by Brad Johnson* January 11, 2007 ACN Energy Ventures *National.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Study Plan Development & Approach May 5, 2010 Conference Call & Webinar “To ensure efficient, effective, coordinated use & expansion of the members’
LNBA Subgroup: Avoided Transmission Value
Reliability Assessment Committee Proposal TSS Meeting
Excelsior Energy’s Mesaba Energy Project
I-5 Corridor Reinforcement Project
Excelsior Energy’s Mesaba Energy Project
Reliability Assessment Committee Reliability Workshop Priorities
SunZia Project Description
Reliability Assessment Committee Reliability Workshop Priorities
Daniel J Marquis PNM Transmission Engineering
Presentation transcript:

Public Service Company of New Mexico Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM Agenda Introduction Agenda Additions Stakeholder Process PNM 10-Year Plan Development Regional Activities Summary of Current Interconnection Study Activity Order 1000 Stakeholder Process Status Other Items Next Meeting PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM Introduction Public Stakeholder Meetings Order 890 Objective to improve transparency Involvement of all affected stakeholders Coordinated with WECC processes Reliability – System performance evaluations, reliability standards and coordination. TEPPC – Planning Policy and Economic Evaluations Formalized Stakeholder Input through WestConnect STP Agreement OATT Appendix K defines each utility’s planning process. PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

PNM Bi-Annual Meetings March Meeting Study Plan Solicit Stakeholder Input to Plan November 10-Year Plan Review Solicit Stakeholder input on plan and follow-up to be included in next planning cycle Others as needed PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

PNM Study Plan Objectives Support Data Base Development for PNM and Regional Studies 2017 (2-yr), 2020 (5-yr), 2025 (10-yr) Maintain Reliability Define Transmission for Native, Network and Point-Point Customers Incorporate Plans Developed Through FERC Processes, NM IRP and Regional Planning Analysis PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM Study Scope Review transmission adequacy with network customer updates to designated network resources and load. Determine if new system improvements or adjustments to existing improvements are needed to serve expected obligations. Develop operational mitigations or system improvements to maintain system reliability and associated cost estimates and schedule. Incorporate assessments of economic congestion if applicable. PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM Methodology Powerflow Assessments All lines in service Single circuit or transformer contingencies Double circuit contingencies Breaker failure contingencies Short Circuit Analysis Stability Analysis Dynamic Stability Voltage Stability PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM Key Assumptions Load forecast Slow growth Effects of energy efficiency, demand response and load side distributed renewables Generation modeled In-Service Under Construction with expected ISD Wind resources Capacity for summer peak based on historical – low contribution Sensitivity cases for high wind periods Committed projects will be included as part of base case assumptions PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

Modeling Criteria for PNM Planning Area NERC/WECC Reliability Criteria (included with Study Plan) Line loading criteria Base Case and Post-contingency voltage criteria Minimum voltage stability margin Minimum/Maximum transient voltage and frequency Violations of performance criteria is basis for most system improvements. PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

Final 10 Year Plan Facilities Facilities defined in this planning cycle for Native and Network Customer Load Growth and Point to Point Transmission Service Committed projects from other studies: Previous Planning Cycle Transmission associated with an approved IRP Studies performed pursuant to NM IRP rule. Transmission for Generator Interconnections with notice to proceed Studies per FERC requirements New Point-Point Requests with notice to proceed PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM Project Additions for 2017 Completed Rio Puerco-Progress 115 kV Line (2014) Under Construction Richmond Switching Station (2016) Rio Puerco 345 kV Station Additions (2015) Rio Puerco-Progress 115 kV Line (2015) Rio Puerco SVC (2015) Yah-Ta-Hey 345/115 kV Transformer Addition (2016) PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

2017 Base Case Northern New Mexico Rio Puerco Expansion and SVC (ISD 2015) Completed Project Planned Project Yah-Ta-Hey Transformer (ISD 2016) Richmond Station (ISD 2016) PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

2017 Base Case Southern New Mexico Alamogordo Replacement Capacitor Installation (ISD 2015) Completed Project Planned Project PNM Open Transmission Planning Meeting March 5, 2015 Albuquerque, NM

Planned Project Modeled for 2020 2017 Projects plus: Alamogordo Voltage Support Phase 2 PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM 2020 Base Case Additions Southern New Mexico Alamogordo Replacement Capacitor Installation (ISD 2015) Alamogordo Voltage Support Phase 2 (ISD 2018 +) Completed Project Planned Project PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

Planned Projects Modeled for 2025 PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

AGING INFASTRUCTURE PROJECTS Spare 345/115 kV Transformer Spare 345 kV Line Reactor Equipment will be energized to support system but can be relocated if needed. PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

Additional Information See November, 2014 meeting presentation for additional project details. https://www.oasis.oati.com/PNM/PNMdocs/Open_Planning_MTG_11-06-14_Presentation.pdf 2014 Rio Puerco and Jicarilla follow-up: Requested WECC approval to update Path 48 Definition and Rating in January – in 60 day review period. Received WECC approval for required modifications to WECC RAS PNM-1 in January. PNM Open Transmission Planning Meeting March 5, 2015 Albuquerque, NM

PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM Timeline February 19 - Draft Study Plan distributed to stakeholders March 1 - Network Customer ten-year projected network load and network resources are due to PNM March 5 - Stakeholder Meeting to discuss study plan. March 30 - Finalize detailed Study Plan and Base Cases March thru July – Complete analysis, develop improvements including descriptions, one-line and cost estimates November 5, 2015 - Stakeholder meeting to review transmission plan and follow-up for next study cycle PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

Stakeholder Discussion Loads and Resources required from Stakeholders. Study Plan Discussion Comments/suggestions by March 19, 2015 PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

PNM Open Transmission Planning Meeting March 5, 2015 Albuquerque, NM Regional Projects High-Plains Express Phase II Completed – no Stakeholder activity in 2014. SunZia Received EIS Record of Decision on January Targeting a 2020 in-service date Tres Amigas Some limited activity to complete preparation for next phase of studies. Lucky Corridor Project modified to single 345 kV line from Gladstone area to Ojo switching station. Completed WECC Project Coordination Review Group report. Southline Project Completing WECC rating process in March Centennial West Clean Line Project Development agreement with Western Area Power Administration Western Spirit Clean Line Project Stakeholder relationships established with Tribal entities, PNM, and private landowners Initiating WECC Project Coordination Review Process PNM Open Transmission Planning Meeting March 5, 2015 Albuquerque, NM 21

PNM Open Transmission Planning Meeting March 5, 2015 Albuquerque, NM Map of Transmission HPX SunZia HPX SunZia Tres Amigas Lucky Corridor Southline Centennial West Alt Western Spirit PNM Open Transmission Planning Meeting March 5, 2015 Albuquerque, NM 22

Interconnection Cluster Activity Summary Fourth Definitive Cluster closed February 16, 2014 Three requests – 415 MW Initial System Impact Studies completed Some restudies required and a Facilities Study process started Fifth Definitive Cluster closed November 13, 2014 Three requests – 148 MW Starting System Impact Studies Fifth Preliminary Cluster open through March 15, 2015 PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM Order 1000 Initiated an abbreviated 2015 Order 1000 Planning Cycle New Planning Management Committee and various subcommittee formed. PMC is currently holding two meetings a month. Planning Subcommittee will be holding regular meetings to work through planning analysis. Cost Allocation Subcommittee expected to start meetings in March. Most non-jurisdictional transmission owners have not signed the new PPA. Awaiting FERC ruling on compliance filing. Targeting completion of a 2024 peak summer base case in March. New planning consultant hired through RFP process and on-board. Energy Strategies PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM

PNM Open Transmission Planning Meeting March 6, 2014 Albuquerque, NM 2015 Order 1000 Schedule PNM Open Transmission Planning Meeting March 6, 2014 Albuquerque, NM

Questions or Comments Don Maez Donald.Maez@PNM.com 505-241-4577 PNM Public Transmission Planning Meeting March 5, 2015 Albuquerque, NM