DOC ID © Chevron 2005 Implementation of NeSSI CPAC – November 8, 2007 John Dempster, Rick Junge, Sandra Krauthamer, Mark Lee, Stacey Miller, Don Nettles.

Slides:



Advertisements
Similar presentations
Colonial Pipeline Company Buster Brown January 26, 2005
Advertisements

NeSSI – Enabling TCO Optimization 29 January 2008 – IFPAC2008, Baltimore MD NeSSI* – An Enabling Platform for the Reduction in TCO** of Process Analytical.
Process Gas Chromatography Siemens Process Chromatographs CPAC-NeSSI Report.pptSlide 1; November 8, 2007 Criteria for Design and Specification Discussion.
Process Analyzer Sampling with Astute System IFPAC 2008 – Baltimore January 29,2008.
Deployment in ExxonMobil Operating plants and research sites Purchase in small quantities Can accept some risk by maintaining existing sample system as.
Complete, Modular, Ready Today 1 History of ISA SP76 NeSSI Current Standards ANSI/ISA (2002) IEC ( )
CPAC – Fall Meeting: NeSSi Session 11/8/07
Fuel Source Storage and Distribution In the Bay Area 03/21/2013 Public Fleet Supervisor’s Association.
Marketing NeSSI™ Globally What’s the Plan?. Issues There are periodic requests for NeSSI™ information from the “press” Should we provide directed mailings.
Texas Commission on Environmental Quality (TCEQ) Differential Absorbtion Lidar (DIAL) Project Summer 2007 Texas City, Texas.
PROPANE AUTOGAS INDUSTRY UPDATE BUSCON SEPTEMBER 11, 2012.
Retrofit Emission Controls for On-Road Diesel Engines OCA Air Quality Summit Fresno, CA October 27, 2005 Manufacturers of Emission Controls Association.
An Integrated Analytical Process GC and SHS Based on IS CAN Communication Circor Tech Patrick Lowery ABB Analytical Tracy Dye IFPAC 2008 Baltimore.
Clean School Bus USA and Ultra Low Sulfur Diesel Dale Aspy, EPA Region 4 February 10, 2006.
New Sampling/Sensor Initiative (NeSSI) CPAC: November 5, 2001 NeSSI (New Sampling/Sensor Initiative) Interface to the Process Jim Tatera, Rob Dubois, Peter.
APPLICATION OF SMART MODULAR SAMPLE SYSTEMS AT AN OLEFINS PLANT John B. Cumbus ExxonMobil Chemicals Baytown Olefins Plant.
NeSSI AND ANALYZERS NeSSI AND ANALYZERS ISSUES AND DISCUSSION REGARDING THE SAM CONCEPT FROM THE ANALYZER SUPPLIERS PERSPECTIVE.
I²C Bus Development An Implementation of the Generation 2 Bus Siemens Activities Silke Ebbing, March 2007.
Siemens Applied Automation Process Gas Chromatography Siemens Update.pptSlide 1; CPAC; May 11, 2006 NeSSI Update Siemens Activities CPAC; NeSSI: May 2006.
© 2006 Swagelok Company. Swagelok confidential. For internal use only. NeSSI Life Cycle Cost Model CPAC FALL 2006 SPONSORS MEETING NeSSI WORKSHOP Thursday,
CPAC-May’02; U.Bonne - New Sampling/Sensor Initiative (NeSSI-II) May’02 CPAC Draft of White Paper to U.S. Department of Energy,
ISAExpo October 2003: Houston, TX NeSSI - Examples of Some Recent Developments “the best way to predict the future is to create it”
Gerald Vos Parker Hannifin NeSSI Platform Developments.
Steve Doe Parker Hannifin Frank Ruiz Ruiz & Associates The Ever-Expanding Modular Toolkit.
QlikView in the Enterprise BI Stack. Sample Architecture – Metadata Integration This architecture shows the use of a custom metadata database as a data.
YOU HAVE HEARD ABOUT MANY ADVANCES IN HARDWARE, SENSORS AND CONTROLS THESE HIGHLIGHT THE NEED FOR IMPROVED SAMPLING TECHNOLOGIES.
MINIATURE MODULAR SAMPLE SYSTEMS – FROM CONCEPT TO REALITY David M. Simko, Swagelok Company Pittcon®2002 New Orleans, March 20, 2002.
The CT76 Solutions Package: Patrick Lowery, CPAC Fall Meeting
NeSSI Update An Implementation of the Generation 2 Bus Siemens Activities November 2006.
CPAC – Fall Meeting 2007 Michael Gaura Emerson Process Management.
LNG Liquefaction, Storage & Delivery Prefabricated & Manufactured M&R Facilities & Lateral Interconnects Complete Solutions for Natural Gas, LNG,Gas Storage,
Instrumentation Developments in Stream Switch Valve Technology Steve Doe, Parker Hannifin Corporation.
Air Emission Control Technology UWM Air Pollution Meteorology Class November 20, 2007 Frances A. Hardrick We Energies.
Sample System Specialists for Gas Analysis Information on Sample System Capabilities.
Empowering Business in Real Time. © Copyright 2010, OSIsoft,LLC. All rights Reserved. Portal Visualization: Using Microsoft SharePoint and OSIsoft’s PI.
ExxonMobil Progress with Generation II NeSSI Systems Dan Podkulski and Jeff Gunnell Testing of the modular sample system concept is complete at ExxonMobil:
THEMIS TIMPURGE- 1 UCB, JUNE 16, 2005 THEMIS INSTRUMENT NITROGEN PURGE.
Bielsko- Biala 18/09/2013 HOTEL QUBUS ST PLC Technology seminar.
ULSD Workshop November 20-21, 2002 Houston, TX Transition to 15 ppm ULSD.
MARATHON ASHLAND PIPE LINE ULSD TESTING Wesley Neff November 20,
CPAC May 2005 John Mosher – Honeywell Sensing & Control Sensor Actuator Manager (SAM) Controller Considerations And Specification Identification.
Fuel Hedge Program MTA Finance Committee April 2012.
Utilizing NeSSI™ for Analytical Applications Dave Veltkamp, CPAC New Sampling/Sensor Initiative (NeSSI™)
By: Matthew Fackrell.  Better fuel economy than normal gas motors. Up to 30% better.  More power for pulling purposes Which reduces costs on shipments.
Water. What is SmartMQn Water? SmartMQn Water is a packaged monitoring solution that uses sophisticated and easy to use preconfigured application software.
Intelligent NeSSI Sampling Systems – Feasible and Practical Rick Ales and Dave Simko Swagelok Company IFPAC 2006.
C. Colakova Sonja, Eng. of Environment C. Colakova Sonja, Eng. of Environment OKTA Refinery of crude oil Skopje Workshop on Clean Fuels and Vehicles in.
30th Space Wing Team Vandenberg - HAWKS 1 California Airborne Toxic Control Measures for Particulate Matter Emissions from Diesel-Fueled Engines John Gilliland.
1 NeSSI™– An Alternative Viewpoint Questions, notes and comments compiled by Rob Dubois Dow Chemical CPAC/NeSSI Workshop May 11, 2006.
Fuel Implementation Issues at the Regional Air Quality Workshop by Bob Leidich BP Products North America Inc. November 17, 2004 Rosemont, Illinois.
Industry Analytics Initiatives: Status & Plans IFPAC 2002 January 23, 2002 San Diego, CA IFPAC 2002 Industry Analytics Initiatives: Status & Plans Session.
ExxonMobil Progress with Generation II NeSSI Systems Dan Podkulski and Jeff Gunnell Testing of the modular sample system concept is complete at ExxonMobil:
It’s…….
Integrated Instrumentation Solutions
BDB RCS Injection Pump.
Small Engine Tool ID Part 1.
AGENDA: CPAC/NeSSI™ Workshop, 9 November, 2006
5/24/2017.
“How to Trust Your Process Analyzer"
Copyright Danielle Dubois
Session Chair: Rob Dubois, Dow Chemical Process Analytical R&D
Regional Seminar Series Southern California
Circor Synergies Quality Valve Products Excellent Design Engineering
LP fuel lines redesign on ISX15 engines Date- 6th Sep 2017
LP fuel lines redesign on ISX15 engines Date- 6th Sep 2017
LP fuel lines redesign on ISX15 engines Date- 4th Aug 2017
Engine Part ID Part 1.
Engine Part ID Part 2.
Engine Part ID Part 2.
LP fuel lines redesign on ISX12 engines Date- 6th Sep 2017
Presentation transcript:

DOC ID © Chevron 2005 Implementation of NeSSI CPAC – November 8, 2007 John Dempster, Rick Junge, Sandra Krauthamer, Mark Lee, Stacey Miller, Don Nettles

DOC ID © Chevron NeSSI Systems Richmond Refinery Liquid sample: Ultra Low Sulfur Diesel Supplier – CIRCOR  Pressure transducers installed [PLC program to monitor / autovalidation]  Combination of down mount and traditional system  Fabricated sample conditioning system enclosure System Integrator - TASC  Installed CIRCOR SCS enclosure to Shelter PLC for analyzer communication hiway and SCS monitoring

DOC ID © Chevron Richmond Refinery - ULSD PLC supporting SCS

DOC ID © Chevron Richmond Refinery - ULSD PLC HMI supporting SCS

DOC ID © Chevron Richmond Refinery - ULSD CIRCOR SCS

DOC ID © Chevron Richmond Refinery - ULSD CIRCOR SCS

DOC ID © Chevron Richmond Refinery - ULSD CIRCOR SCS

DOC ID © Chevron NeSSI Systems Richmond Refinery Liquid sample: Gasoline Hydrotreater Supplier – Parker  Down mount plate System Integrator - TASC  Installing in TASC designed and fabricated sample conditioning system and enclosure  PLC for analyzer communication hiway and SCS monitoring Scheduled Delivery Date: Dec ‘07

DOC ID © Chevron NeSSI Systems Richmond Refinery Vapor: Fuel Gas Drum analyzer system [3 systems] STATUS: Front end engineering phase complete

DOC ID © Chevron NeSSI Systems Pascagoula Refinery Liquid sample: Ultra Low Sulfur Diesel Supplier – Parker  Supplied down mount panel System Integrator - TASC  Installed Parker panel in sample conditioning system

DOC ID © Chevron Pascagoula ULSD Parker Panel

DOC ID © Chevron Pascagoula ULSD Parker Panel – Analyzer Flow

DOC ID © Chevron NeSSI Systems El Segundo Refinery Blender / Chevron Engineered / CIRCOR / AutoFlow (one off) / 1st generation / liquid [RVP azr] Total Sulfur GC / SAAI system integrator / CIRCOR / 1st generation / vapor sample DIB / SAAI system integrator / CIRCOR / 1.5 generation [smarts involved] / vapor sample FCCU / CEM / Chevron Engineered / CIRCOR / 1st generation / Stack Sample Nox & SO2

DOC ID © Chevron NeSSI Systems El Segundo Refinery – con’t  (2 systems) ULSD project / SAAI system integrator / CIRCOR / 1.5 generation [smarts involved] / liquid  (5 systems) Flare Gas / TASC / CIRCOR / 1.5 generation [smarts involved] / vapor  (3 systems) GC Applications / TASC / CIRCOR / 1.5 generation [smarts involved] / 2 vapor / 1 liquid  (2 systems) CEMS Applications / TASC / CIRCOR / 1.5 generation [smarts involved] / 2 vapor

DOC ID © Chevron El Segundo

DOC ID © Chevron El Segundo

DOC ID © Chevron El Segundo

DOC ID © Chevron El Segundo