A: 120 ft – Stabilize B: 130 ft – Stabilize C: 30 ft - Stabilize D: 50 ft - Open G: 50 ft - Stabilize I: 55 ft - Stabilize Figure 3: Plan View all dimensions.

Slides:



Advertisements
Similar presentations
Ecological Succession: (Important info in blue)
Advertisements

Sleepy Creek Watershed Association Riparian Planting Project Gale Foulds, Sleepy Creek Watershed Association Barbie Elliott, West Virginia Conservation.
Wetland restoration after a mega-storm Jyneen Thatcher, Wetland Scientist Washington Conservation District Paul Bockenstedt, Ecologist Stantec.
Pot in Pot Nursery Production
Riparian Zone Habitat Assessment Vegetation and More.
Soil-choked Riprap covered with Erosion Control Blanket (ECB), & planted with native trees & shrubs through the ECB.
Clearing hillside of Invasive Species. Willow Layer.
Taylor Creek Park Rehabilitation Project. Taylor Creek Park Rehabilitation In July 2012 a significant storm event caused significant damage in Taylor.
Landscape Pitfalls Myths, Mistakes, and Misconceptions.
Hickory Hills Lake Management Committee Erosion Control sub committee Tom BertramJane Blake.
THE BENT WILLOW POLE METHOD. BIOENGINEERING: The use of living plant materials to stabilize streambanks Most bioengineering gives Mother Nature a jump.
Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management Wolf Lake Aquatic Restoration Project.
Road Decommissioning Monitoring For every 10 miles of road decommissioned, one ¼ mile monitoring segment is established and monitored. Segments are monitored.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Planting Plant Material Maintenance. Transplanting Systems Bare Root Containers Ball and Burlap Tree Spade.
Erosion is the process by which the land surface is worn away by the action of wind, water, ice, or gravity - it is the process where soil particles are.
Design of Grass Swales Norman W. Garrick
Vegetation Establishment. Exposed soil occurs on all construction sites.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
Ms. Gripshover Landscaping Unit 16. » Identify the different methods of harvesting plant materials used by the nursery » trade. » Prepare for planting.
Freshwater Fishery Management Objective- Discuss the lake habitat to include basic fishery management techniques.
Establishing the Lawn Original PowerPoint Created by Howard Henderson Modified by the Georgia Agriculture Education Curriculum Office June 2002.
Minnehaha Creek – Reach 14 Streambank Improvement Project.
Proposed Novato Creek Bank Stabilization Guidelines Questa Engineering Corp.
PROJECT NO: HWY: STH 441/USH 10COUNTY: WINNEBAGOSHEET: E FILE NAME : _______________________________PLOT DATE : ___________________PLOT BY :
Riparian Zones “A Line of Defense Vital to Healthy Rivers & Streams” Coe Lake Outdoor Science Education Life Science Unit.
The sand filter has to be moved from this location. The embankment cross section used in the slope stability analysis did not include the sand filter.
What’s a “Basin”? A depression that holds water A bird bath What holds the water of Lake Michigan What contains the water of an ephemeral pond Does it.
Homeowner BMPs Aileen Driscoll Farid Jake Brinkman Jennifer Hughes.
Planting & Maintenance of Ornamental Plants By: Johnny M. Jessup Agriculture Teacher/FFA Advisor.
Modern Urbanized Stream Water Quality Improvement Technologies Creating a Net Zero Water Quality Impact Solution in the Natural Environment.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
Managing Shoreline Erosion Module 2:1. Erosion: A Natural Process  Proceeds very slowly  Important part of ecosystem function Courtesy of: Ed Klekowski.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
CENTRAL MUSCATATUCK WATERSHED. BMPs Cost-Shared by Central Muscatatuck Watershed Project.
Stormwater Runoff: 101 Natural groundcover absorbs, slows and filters rainwater; pavement and rooftops do not. Heavier and faster runoff leads to heavier.
Seasonal High Tunnel Systems for Crops Update on interim standard 798 Technical and Program guidance National bulletin: National Bulletin:
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
15 Feet : Minimum Width for Zone 1 Zone 1 Functions: Bank Stabilization Shading (water temperature control) Flood Protection Stream Inputs: Structural.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 5 ESTIMATING EARTHWORK.
Soil Erosion. Objective 1: Explain soil erosion.  What is soil erosion?  I. Soil erosion is the process by which soil is moved.  As soil is eroded,
Hydrosphere Notes Part 9-Land Use. What is land use? The way people use land.
Human Impacts Part 2- Watersheds. What’s a Watershed? An area of land that drains into a common body of water.
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share.
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
Vegetable Crop Production
October 26, 2016 Amanda Gumbert Extension Water Quality Specialist
Norman W. Garrick Design of Grass Swales.
Black Creek Streambank Stabilization Projects
“Sowing the seeds of love.” -Tears for Fears 38.00
Site Grading Site Grading Civil Engineering and Architecture
Hydrosphere Notes Part 9-Land Use.
Emigration Creek Restoration
Erosion • outline a cause of soil erosion in  NSW due to: – an agricultural process – urbanisation and identify a management strategy that prevents or.
Unit 4: Environmental Science
Prairie Restorations, Inc.
Soil Conservation.
5-3 How Do Communities and Ecosystems Respond to Changing Environmental Conditions? Concept 5-3 The structure and species composition of communities and.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY.
Articulating Concrete Mattresses
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Presentation transcript:

A: 120 ft – Stabilize B: 130 ft – Stabilize C: 30 ft - Stabilize D: 50 ft - Open G: 50 ft - Stabilize I: 55 ft - Stabilize Figure 3: Plan View all dimensions are approximate scale: approx.60 ft /in parking lot creek sidewalks campground road outlet N E: 80 ft - Open F: 50 ft - Stabilize H: 50 ft -Stabilize

~ 5 ft > 2:1 Two (2) ~3 ft x 3 ft x 6 ft (H x W x L) galvanized gabions, rotated minimum of 6 . Fill with 4 to 8 in stone. excavate gabion ~ 2 ft below bed cut slopes back to 3H:1V if possible (otherwise 2H:1V) finish slope to outward end of gabions set second gabion back ~ 9 in bed Figure 4: Typical Bank Cross-Section all dimensions are approximate plant slopes with native grass, shrubs and trees creek filter cloth placed under, on top of and behind gabions Staked erosion blanket to cover newly graded surface

Figure 5: Examples of Shrub Placement in or on Gabions creek bed slope Shrubs to be planted 2 per stack of 6-foot long gabions (see detail) Shrub Planting Detail (view from creek or bank) 2’ Ball-stock shrubs (w/ root ball included) Gabions

12-18 ft Native grasses and forbs intermixed among shrubs and trees (hatching not shown) Typical Vegetative Buffer – “Stabilize” shrub density: ~ 1 shrub per 3-5 sq. ft scale: approx. 25 ft /in trees shrubs ft Typical Vegetative Buffer – “Open” creek creek creek creek Figure 6: Vegetation Details refer to Figures 3 and 8 for location All dimensions are approximate. Shrub and tree placement shown is not exact - for figurative purposes only. Shrubs can be live stakes or balled stock (root ball included). See notes for more planting information. gabions Erosion mat over entire buffer NO gabions Erosion mat over entire buffer Plant native grasses and forbs only grasses & forbs

A B Figure 7: Plan View with Improvements see Figures 6 and 7 for details on sections A, B, C, D, and E scale: approx.60 ft /in parking lot creek sidewalks campground road outlet C F G trees shrubs D H I E

NOTES: 1.Bank planting & grading areas should be kept to a maximum12-foot width near sidewalks (Areas E and F). 2.Bank slopes shall be graded to 3H:1V where possible, otherwise 2H:1V. 3.If sediments from the creek bed are mechanically removed as part of regular park maintenance, ensure that 2 feet of bed cover remains next to the bottom of the gabions to keep them in place. 4.GABIONS: Nearest supplier of Macaferri gabions is CSI Geoturf – Contact: David Ringle. Phone: (231) W. Blue Star Drive, Traverse City, Michigan Technical support and CAD drawings (sometimes for free for public projects): Macaferri Gabions Ken Hughes/Tersea Lynch 2351 Versailles Rd., Ste. 302 Lexington, KY Telephone: See attached Macaferri specification sheet for gabions sizing and installation information. 5.See attached U.S. Army Corps of Engineers document SR-22, Gabions for Streambank Erosion Control for installation recommendations. 6.Cost provided for gabions is for galvanized gabions only (not PVC-coated). Cost includes shipping and enough wire for gabion assembly. Can also purchase “hog rings” for connection that can be easier to use/install- additional cost for 90 gabions ~ $ GRASSES: a)A suggested mesic (tolerant to dry and wet conditions) seed mix is attached. This seed mix has been provided by Borealis Seed Co., Marquette, MI. (906) b)Suggested application rate = 1 lb/3,000 sq.ft. Plant throughout vegetated area.

NOTES (continued): 8.SHRUBS: a)Suggested species of shrubs: red-osier dogwood (Cornus stolonifera)red-osier dogwood ninebark (Physocarpus opulifolius)ninebark upland willow (Salix humilis)upland willow pussy willow (Salix discolor)pussy willow b)*Shrubs planted on top of gabions should be balled stock for best establishment. Shrubs planted on bank can be balled stock or live stakes. Live stakes are less expensive, but balled stock establishes more quickly. Also live stakes look, initially less visually appealing. 9.TREES: a)Suggested species of trees: red maple (Acer rubrum)red maple quaking aspen (Populus tremuloides) white or paper birch (Betula papyrifera)white or paper birch 10.EROSION BLANKET & STAKES: a)Curlex HV (High Velocity) Straw/Coconut mat or similar is recommended. b)6” wire stakes are recommended for fastening to bank. See manufacturer instructions for proper installation. c)Erosion blanket to be installed and secured after seeding and fertilization. 11.Suppliers of Trees, Shrubs and Erosion Mat: a)Lake Superior Tree Farm, Chassell,MI, (Contact: David Crouch) b)Great Lakes Nursery, Watervliet, MI, , c)Cold Stream Nursery, Free Soil, MI, , d)Engels Nursery, Fennville, MI, , e)*Follow vegetation supplier instructions for planting, fertilization and care. 10.Fertilizer should be applied to bank area when planting vegetation. 3/10/10 fertilizer is recommended. Slow-release fertilizers are not recommended. Follow manufacturer application instructions closely.