Wetland Habitats: EMWMF Haul Road Remediation In 2005 a large haul road was constructed that resulted in loss of wetlands. To compensate for those losses,

Slides:



Advertisements
Similar presentations
Kevin L. Hoover Waters Edge Hydrology, Inc. – Wetland Conservation Approaches.
Advertisements

Action Effectiveness Monitoring in the Upper Columbia (Chapter 4) Karl M. Polivka, Pacific Northwest Research Station, USDA Forest Service.
Washington Department
Restore McComas Meadows /Meadow Creek Watershed Project # Restore McComas Meadows/ Meadow Creek Watershed Project # Nez Perce Tribe Fisheries.
CTUIR Grande Ronde Subbasin Restoration Project Project Confederated Tribes Umatilla Indian Reservation Presented by: Carl Scheeler, CTUIR Wildlife.
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
Riparian Zone Habitat Assessment Vegetation and More.
© Mark Godfrey Brian Richter, Director Global Freshwater Program © Insert Image Credit Environmental Flows for People and Nature.
Civil Engineering Michael C. Applegate HQ AFSOC/CEV WETLANDS CONSTRUCTION AS MITIGATION.
Vegetation Soil, Landscape Hydrology Process for Assessing Proper Functioning Condition Vegetation Items.
LENTIC CHECKLIST. NATURAL RIPARIAN RESOURCES LENTIC CHECKLIST HYDROLOGIC.
Birds as Indicators. Healthy water bodies for a healthy planet.
Natural Riparian Resources Vegetation Landscape/Soil Water.
Road Decommissioning Monitoring For every 10 miles of road decommissioned, one ¼ mile monitoring segment is established and monitored. Segments are monitored.
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
RIPARIAN TREE PLANTING City Stream Watch SAWMILL CREEK Phase II Rehabilitation Project.
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Bioassessment 1.0. Stream Visual Assessment Protocol 1. Turbidity 2. Plant growth 3. Channel Condition 4. Channel Flow Alteration 5. Percent Embeddedness.
April 22, 2003 IERM Overall Objectives 1.Quantify relationship between hydrologic and hydraulic attributes and effects on selected ecological performance.
1 Design and Restoration. 2 Appreciative Design From Fridley, 2006 Stakeholders (including Problem Owner) Stakeholder expectations (SE) Functional Requirements.
Hoover Dam – Colorado River. Reasons for Dams Flood Control 39,000 dams worldwide higher than 15 m (ICOLD, 1988)
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Impact of Western Juniper on Hillslope Hydrology: Steens Mountain, OR Eastern Oregon Agricultural Research Center Burns, OR Northwest Watershed Research.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Advantages of Monitoring Vegetation Restoration With the Carolina Vegetation Survey Protocol M. Forbes Boyle, Robert K. Peet, Thomas R. Wentworth, and.
Ecology.
24 Hour Freephone Water Pollution Hotline Risk Assessment Refinement Use field data to refine Article 5 risk assessment pressure thresholds.
Low Flow Analysis & Water Use Plan Science & Community Environmental Knowledge Fund Forum June 10, 2004 Barry Ortman Diversified Technical Services Dawson.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
{ Los Amigos de Valles Caldera – San Antonio Tributaries and Valle Seco Restoration By Steve Vrooman.
A combination of warm weather grasses, terrestrial and aquatic plants in and around the spring Stormwater Management Plan for College Springs Park Benjamin.
Conceptual Ecological Model of San Acacia Reach of Middle Rio Grande River – 2/13/07 1 st Draft Ibis Ecosystem Associates, Inc. Diversion & Regulation.
The WLP must be consistent with these objectives 1.maintaining or enhancing an economically valuable supply of commercial timber from the woodlot licence.
Lower South ForkClearwater River Lower South Fork Clearwater River Nez Perce Tribe DFRM Watershed Division Mark Johnson-Project Leader
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
The Grow-A-Tree Program Grade 6
Mission, Brender, and Yaksum Creeks Habitat Conditions Low flows and associated high temperatures affect distribution and abundance of native species.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
Envirothon 2009 Spook Creek Area Presented By: Jakob, Will, Jamie, Meghan, and Teresa Spook Creek Area Presented By: Jakob, Will, Jamie, Meghan, and Teresa.
Effects of Teak Plantations on Water Supply at KVTC HJ van Hensbergen for Dave Scott.
Fish Assemblages of the Wabash River Mark Pyron. Wabash River Fishes 1.Large river 2.High diversity 3.History of human impact 4.Fish assemblages respond.
Flowing water.  vitally important geologically, biologically, historically and culturally.  contain only 0.001% of the total amount of the worlds water.
 This will occur when streams receive more water than their channels can hold,  i.e. when stream discharge is greater than stream capacity.  Streams.
Nashville Zoo at Grassmere Stream and Water Quality Improvements Quality Improvements Littlejohn Engineering Associates, Inc. Civil & Environmental Consultants,
Additional Primary Headwater Habitat Stream Parameters.
ESTUARIES Where a freshwater stream meets the sea & the water level changes with the tides Also includes where a river or stream meets a large body of.
Affect the growth and behavior of living things.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
Hydropeaking and minimum flow : the French approach. P. Baran CIS ECOSTAT - HYDROMORPHOLGY WORKSHOP 12th and 13th June Brussels Pôle Ecohydraulique.
Nason Creek Salmon Habitat Conditions* Development, and road building have affected riparian (streamside) habitat, large woody debris and gravel recruitment.
Design and Implementation of Large Wood Structures at Twelvemile Creek Prince of Wales Island Tongass National Forest The Nature Conservancy TEAMS Enterprise.
-Aquifers -Springs -Ponds -Lakes -Creeks/Streams -Rivers -Wetlands Makes up < 3 % of water on earth.
Hydroelectric Power By: Danasha Harris, Haley King, Sarah Christopher, Peyton Mitchell, and Stephanie Williams.
Unit 7 – Water Systems Section 2- Wetlands.
Chelan County Lead Entity Presentation SRFB 2005 Salmon Habitat Grant Cycle.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
Response of Understory Vegetation following Western Juniper (Juniperus occidentalis) Cutting on Two Sites Breanna S Sabin FS 533.
In Practical Terms… It’s land that is regularly covered or soaked with water for part or all of the year and has a presence of wet- adapted species.
Impact of Western Juniper on Hillslope Hydrology: Steens Mountain, OR
Indices of Road Erosion Bear Valley Watershed, Idaho
Hydrological changes resulting from dam construction
The Gila River Restoration at Apache Grove
Conservation Reserve Program Acres in Iowa
Challenges Facing Riparian Ecosystems
WENDELL PARK STORMWATER IMPROVEMENTS
Faro Mine July 24th 2018 Overflight
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Hydrologic Engineering
The Water Cycle Aka Hydrologic Cycle.
Presentation transcript:

Wetland Habitats: EMWMF Haul Road Remediation In 2005 a large haul road was constructed that resulted in loss of wetlands. To compensate for those losses, new wetlands were created. Haul Road Remediation site

Wetland Habitats: EMWMF Haul Road Remediation An artificial channel was created to connect upper and lower Bear Creek, bypassing an old weir dam that had isolated the stream sections. The area behind the weir was filled to create a new wetland habitat. Artificial channel Old weir Remediated wetland

Wetland Habitats: EMWMF Haul Road Remediation Bear Creek A new stream section was designed to mimic existing Bear Creek.

Wetland Habitats: EMWMF Haul Road Remediation A new wetland was created by filling the old Bear Creek channel behind the weir.

Wetland Habitats: EMWMF Haul Road Remediation Vegetation established rapidly in the created wetland. July 2006 July 2007

Wetland Habitats: EMWMF Haul Road Remediation Monitoring in 2007 indicated rapid establish- ment of a diverse wetland plant community.

Wetland Habitats: EMWMF Haul Road Remediation Monitoring in 2008 indicated continued improve- ment in percent cover of remediated plots.

Wetland Habitats: EMWMF Haul Road Remediation Good survival and growth of planted tree and shrub sprigs continued in 2008.

Wetland Habitats: EMWMF Haul Road Remediation Site will continued to be monitored in the future. Hydrologic changes have resulted in some bypass of spring water to the wetland. Engineers will evaluate potential modifications to the existing flow paths to the wetland. Further management may be required to insure adequate hydrology and to control invasive plants.