Madison West SLI '06 New Team. Vehicle Mission Statement ● Successfully launch rocket to 5,280 feet. ● Capture multiple simultaneous images in the standard.

Slides:



Advertisements
Similar presentations
University of Florida Hybrid Rocket Team’s Mile High Club
Advertisements

UF Hybrid Rocket Teams Mile High Club Brought to you by Chris Leonard, Ty Morton, Sam Darr, and Josh Childs.
University of Florida PDR Presentation. Vehicle Design Diameter: 5.86 Length: 135 Static Stability Margin: 1.4 Total Weight: 23.6 lbs.
Preliminary Design Review. Rocket & Payload Schematic.
Northwestern University Space Technology and Rocketry Society (NUSTARS) NASA Student Launch Flight Readiness Review March 16, 2015.
University of Florida Rocket Team Third General Body Meeting October 10, 2013.
P RELIMINARY D ESIGN R EVIEW University of North Dakota Frozen Fury Rockety Team.
Critical Design Review ….. Royal Ordnance,Summerfield 17 th February 2001 National Rocketry Competition 2001 Open Rocketry Association Slide 1/14.
Critical Design Review NASA University Student Launch Initiative University of Nebraska–Lincoln
Launch Lug – helps to guide the rocket upward until it reaches enough velocity for the fins to engage. Parachute – assists in the safe recovery of the.
Illinois Space Society Tech Team USLI CDR Presentation.
Our Mission Statement  Launch a high-power rocket to an altitude of one mile carrying the Operation: Epic Beep payload package. At lift off, the rocket’s.
RezRiders. Mission statement Through the USLI program the Northwest Indian College Space Center’s RezRiders Team enhances its involvement in science,
Flight Readiness Review March Vehicle Criteria Testing and vehicle design Bulkheads: 9-Ply ½” birch plywood made by Public Missiles, Ltd or ¼ inch.
Alabama A&M University Rocket Program CDR Presentation 2011.
NASA SLI 2010 Mulberry Grove High School Flight Readiness Review Measurement of UVB Radiation Absorption by Cloth Material at Different Altitudes and Measurement.
Student Launch Project Critical Design Review February 28, 2014.
Flight Readiness Review. Intimidator 5: 5” diameter, 10’ length, 47 lbs  Motor: Aerotech L1300R 4556 N-Sec of impulse  Predicted altitude 5203’- RockSim.
Critical Design Review. Intimidator 5: 5” diameter, 10’ length, 45 lbs  Motor: Aerotech L1300R 4556 N-Sec of impulse  Predicted altitude RockSim.
The effect of gravitational stress on the diffusion of liquids. New team SLI 2012.
Flight Readiness Review Atomic Aggies. Final Launch Vehicle Dimensions Diameter 5.5” Overall length: inches Approximate Loaded Weight: lb.
Critical Design Review of “Mach Shock Reduction” Phase II January 2008 Statesville, NC.
Launch Vehicle  Launch Vehicle Summary  The length of the rocked is inches, and the mass is ounces.  We have a dual Deployment Recovery.
Illinois Space Society Tech Team USLI FRR Presentation.
CDR Clear Lake's Team Rocket 2929 Bay Area Blvd. Houston, TX
Rocket Based Deployable Data Network University of New Hampshire Rocket Cats Collin Huston, Brian Gray, Joe Paulo, Shane Hedlund, Sheldon McKinley, Fred.
Intercollegiate Rocket Engineering Competition Spring 2015 EML Ethics and Design Project Organization.
Rocket Based Deployable Data Network University of New Hampshire Rocket Cats Collin Huston, Brian Gray, Joe Paulo, Shane Hedlund, Sheldon McKinley, Fred.
Tropos-1 Hybrid rocket Project
Student Launch Project Flight Readiness Review April 21, 2014.
 Vehicle dimensions, materials, and justifications  Static stability margin  Plan for vehicle safety verification and testing  Baseline motor selection.
Windward Community College University of Hawaii
Safety ► The safety officer for the entire team is Maia Madrid. ► During launch we will follow NAR safety rules and regulations. ► We will follow standard.
Flight Readiness Review Team Hawaii. Vehicle Properties Diameter (in)6 inches Length (in)127 inches Gross Liftoff Weight (lb)50.25 lb Launch Lug/button.
The Rocket Men Project One Giant Leap. Final Launch Vehicle Dimensions Rocket Length in. Rocket Mass- 171 oz. Top Body Tube Length in. Bottom.
STUDENT LAUNCH PRELIMINARY DESIGN REVIEW PROJECT ADVANCE.
The Comparative Analysis of Airflow Around a Rocket.
FRR Presentation IF AT FIRST YOU DON’T SUCCEED, TRY AGAIN… AND AGAIN AND AGAIN AND AGAIN.
Flight Readiness Review Student Launch Initiative SCS Rocket Team Statesville Christian School April 2, 2008.
Bacteria Hunters Bacterial Concentrations Above and Below the Planetary Boundary Layer.
The Effect of Acceleration on the Crystallization of Sodium Acetate.
The Comparative Analysis of Airflow Around a Rocket.
University of Florida Rocket Team Critical Design Review Presentation.
Critical Design Review Presentation Jan. 20, 2011.
Critical Design Review- UCF Jeremy Young Anthony Liauppa Erica Terry, Emily Sachs Kristen Brightwell Gillian Smith 1.
Atomic Aggies CDR. Final Launch Vehicle Dimensions Diameter 5.5” Overall length: inches Approximate Loaded Weight: lb.
Bacteria Hunters Bacterial Concentrations Above and Below the Planetary Boundary Layer.
The Rocket Men Project One Giant Leap. Dimensions Rocket Length in. Rocket Mass- 171 oz. Top Body Tube Length in. Bottom Body Tube Length-
University Student Launch Initiative Preliminary Design Review University of Illinois at Urbana-Champaign Team Rocket.
NUSTA RS NASA Student Launch MAV Challenge 2016 Critical Design Review 15 Janurary2015 Northwestern University | 2145 Sheridan Road | Evanston, IL
January 14,  Length: inches  Diameter: 6 inches  Mass: oz. / lbs.  Span: 22 inches  Center of Gravity: inches 
FAMU PDR Presentation. Table of Contents Vehicle dimensions, materials, and justifications Static stability margin Plan for vehicle safety verification.
Critical Design Review Presentation Project Nova.
UKRA is affiliated to the British Model Flying AssociationBritish Model Flying Association Rocketry.
Flight Readiness Review UNIVERSITY OF SOUTH ALABAMA CONNER DENTON, JOHN FAULK, NGHIA HUYNH, KENT LINO, PHILLIP RUSCHMYER, & ANDREW TINDELL MENTOR : RICHARD.
UCF_USLI Preliminary Design Review David Cousin Freya Ford Md Arif Drew Dieckmann Stephen Hirst Mitra Mossaddad University of Central Florida.
Planetary Lander PDR Team Name
Project Aegis Preliminary Design Review Team Members:
Preliminary Design Review Presentation
College of Engineering
Critical Design Review Presentation
Sounding Rocket PDR Team Name
Sounding Rocket CDR Team Name
Final Readiness Review
Mars Rover CDR Team Name
Dual-Deploy Launch Checklist
Plantation High SL team 1
Model Rockets.
Presentation transcript:

Madison West SLI '06 New Team

Vehicle

Mission Statement ● Successfully launch rocket to 5,280 feet. ● Capture multiple simultaneous images in the standard and infrared spectrums. ● Directly compare synchronized images via photo editing software to determine foliage health and density. ● Compare the amount of detail vs. area covered for different altitudes

Mission Scheme

Design Evaluation The Yin-Yang Unstoppable Piercing Orbit Prime Our vehicle is 132 inches in length, 7.6 inches in width (diameter) and weights approximately 20 kilograms when fully loaded.

● Nosecone: LOC Precision, LOC PNC-7.51 Plastic nose cone. ● Body: The body tube will be made out of phenolic tubing reinforced with fibreglass sunk into a epoxy matrix. ● Fins: The fins are made of G10 fiberglass to prevent any damage during flight and/or landing. Through The Wall (TTW) construction techniques will be employed. ● Motor: Contrail L1428 (hybrid), retained using a active retention system. Components of Design

Flight Profile Simulations Motor Wind [mph] Ballast [lbs] Max. Speed [mph] Max. Acceleration [g] Altitude (no ballast) [ft] CP/CG [calibres] Contrail L Contrail L Contrail L Contrail L Contrail L

Altitude vs. Time

Propulsion Subsystem ● We plan to use the Contrail L1428 Hybrid motor for our propulsion system. A hybrid motor is composed of three chief components: an oxidizer tank; a combustion chamber and a nozzle. ● The purpose of an oxidizer tank is to provide N 2 O as an oxidizer in the combustion for the propulsion of the rocket. Various sizes of the oxidizer tank produce different impulse classes. All L-Level Contrail motors use 3200cc oxidizer tanks.

L1428 Motor Thrust Curve

Recovery Subsystem Payload Recovery: The Payload Recovery System will allow the payload to descend horizontally. The parachute (60in, 15fps descent rate, deployed at apogee) will be placed in and ejected from the compartment behind the nosecone. It has two anchor points on the side of the rocket, 180 degrees away from the direction the cameras are facing. To do this, a line will be running along the side of the payload section from the anchor points to the nosecone. The parachute will eject at apogee and allow the rocket to descend with the cameras facing towards the ground.

● Vehicle Recovery: The Vehicle Recovery System will utilize dual deployment to prevent the vehicle from needlessly drifting off into far distances. The drogue parachute will be 25 in. in diameter to allow the vehicle to descend at 73 feet per second (fps), and will eject at apogee. The main parachute will be 90 in. in diameter to allow the vehicle to descend at 15 fps and will eject once the vehicle is 700 feet above ground (all values are approximate). Both booster parachutes will be fired by a couple of MAWD altimeters (primary and backup).

Dual Deployment 500ft: main parachute deployed Apogee: drogue deployed

Ejection Charge Calculations The size of ejection charges will be based on the formula: Wp = dP * V / R * T where: dP ejection charge pressure in psi. R combustion constant, (ft- lbf/lbm for FFFF black powder) T combustion gas temperature (3307 degrees farenheit). V free volume in cubic inches Wp charge weight (pounds)

Verification matrix Key T 1- Scale Model Launch Test. T 2 - Drop Test from 20 ft. T 3 - Acceleration Test (using centrifuge). T 4 - Vacuum Test (to simulate pressure/altitude changes). T 5 - Ground Test (to test proper function, sending and reception of data). T 6 - Ignition Test. T 7 - Tension Test. T 8 - Drag Test. T 9 - Test Flight System T1T2T3T4T5T6T7T8T9 Main Parachute ♦♦♦ Drogue Parachute ♦♦♦ Payload Parachute ♦♦♦ RDAS ♦♦♦♦ Telemetry System ♦♦♦ GPS System ♦♦♦ Altimeter ♦♦♦ Couplers ♦♦♦ Shock Cords ♦♦♦ Fins ♦♦♦ Engine/ Engine Retention ♦♦♦♦♦

Safety and Experimental Risk

Approach to Workmanship ● Proper construction procedure will be strictly adhered to so as to ensure the structural integrity of the rocket. ● Construction sessions will be held in the school Engineering Lab. Times of construction sessions will depend on the availability of team members. ● For maximum efficiency organization and division of labor is overseen by the vehicle key manager. ● Materials and tools utilized in the process of construction include: phenolic tubes, glassed wood, epoxy, fiberglass, sandpaper, razor, paint, wood.

Payload Integration Payload is enclosed in its own section, for easy coupling with the booster part of the vehicle and to prevent the hot ejection gasses from damaging the payload. Payload has its own deployment electronics, independent on the deployment electronics for the booster. Payload has its own independent power sources (rechargable NiMH battery packs and non-rechargable 9V batteries). Payload its own tracking devices. All payload electronics has external arming switches on the external side of the payload body tube.

Payload

Experiment ● Use IR aerial photography to determine the concentration of various plant species and their health. ● Compare the IR aerial photos with the standard color aerial results to determine the amount of additional information gained from the use of IR photography. ● Determine the optimal altitude for this experiment (amount of details vs. area covered)

IR vs. Standard Pictures Comparison of a color photograph (the left frame) and an IR photograph (the right frame) of a same scenery. Note that the trees on the far left shore and the far right shore look very similar (green) on the color photograph, but have quite different shades of gray on the IR photograph. Color PictureInfrared (IR) Picture

Experiment Scheme Simulated difference between a normal color photograph and an IR photograph (both are aerial pictures of a group of trees pictured on the right).

Payload Section Scheme

Payload Structural System ● Payload's unusual deployment scheme is to assure the horizontal orientation of cameras ● Outer layers of the Payload section will be constructed of fiberglass covered phenolic tubing. Inner bulkheads will be made from epoxy coated plywood. ● Cameras will be padded with semidense foam and held in place with further structural support. Lenses will be protected by layer of Plexiglas to ensure that they are not damaged during launch, flight and landing.

Payload Deployment A scheme of payload deploymentA photo of a deployed payload (from a test flight)

Payload Camera System ● Cameras will be set parallel to each other with lenses facing sideways. Parallax error is negligible. ● Nikon D70s are set on identical settings, apart from one camera's IR blocker being removed to allow the IR lengths to be recorded. ● Cameras will be set to begin taking photos at launch via a synchronized circuit (two synchronized pictures each 5 seconds). ● Photos will be stored on camera memory cards for later download, comparison and analysis.

Cameras and Accessories Hoya Infrared Filter R-72 Nikon D70 SLR Digital Camera ● Nikon D70 DSLR cameras to be used in design. ● Identical lenses will be used to assure images will be comparable. ● Hoya R-72 Infrared Filter ● 2GB SD memory cards ● Electronic synchronized IR LED trigger triggers both cameras

Camera Trigger Circuit (based on LM555 chip) 1: Ground, 2: Output, 3: Trigger, 4: Reset, 5: +VCC, 6: Discharge, 7: Threshold

Camera Control Continued ● Synchronized Dual ML-L3 Remotes ● Periodic Shutter Release ● Adjustable Trigger Interval ● Adjustable Trigger Duration ● Infrared Camera Control ● Built Around LM555 Circuit ● Watchdog Circuit Considered to Improve Reliability

Payload Electronics ROCKET DATA ACQUISITION SYSTEM Telemetry Module GPS Transmitter Receiver

Payload Electronics System ● GPS equipment will include an active antenna, module, and 900MHz transmitter. Transmitter and GPS antenna will >24in apart to prevent RF interference and GPS antenna jamming. ● RDAS will record altitude via accelerometer as well as other flight data (including GPS coordinates). ● Nosecone will contain an AM Radio beacon (in case GPS fails to transmit data) as well as a 140dB screamer.

Camera Testing ● Upon receiving both cameras pictures will be taken of similar objects w/o IR filter applied to assure both cameras perform as expected ● After IR filter is applied, pictures will be taken of varying health and species of plant (from varying distances) to determine what sort of data will be gathered and become familiar with the sensor response to IR light. ● Electronic trigger circuit will be tested rigorously to ensure its flawless functionality during the actual flight.