Strand Jacks Jack Jack support beam Multi-strand cable Very heavy load Fixed anchor & housing Jack Assembly.

Slides:



Advertisements
Similar presentations
Roof Trusses Created By M.S.Martin 11/04, reviewed 11/05, reviewed 11/07.
Advertisements

for Storm Survival, Long Term Reliability and Safety
Chapter-2 Parts of Steel Bridge.
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
BARTOSZEK ENGINEERING 1 The Design of the Booster Collimators Larry Bartoszek BARTOSZEK ENGINEERING 3/10/03.
Heavy Concrete Construction Formwork
Present Procedure for cutting stuck casing on Drilling PLATFORM
Environmental Drilling By: Josh Humphreys October 8,2006.
Subpart R Steel Erection
Diesel Engine Components
ENG-1010 Lecture 16 Bridge Design.
J.D. NEUHAUS powered by air J.D. Neuhaus L.P. The Force To Lift Your Business J.D. Neuhaus LP 9 Loveton Circle Sparks, MD Phone:
Tel: Fax: Address: No.112, Nanyang St., Xizhi Dist., New Taipei City 22152, Taiwan Web site:
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Chapter 34 Bridge Construction.
Bridge Engineering: Lessons from Rome to Tacoma
OSHA Subpart Q Concrete and Masonry Construction.
Taller, Longer, Lighter IABSE–IASS Symposium, London, September 2011 EXPANSION JOINTS FOR EVER LONGER, LIGHTER BRIDGES Thomas Spuler Mageba SA 680.
PROJECT 100. PROJECT 100 DESIGNED TO BE: Cost Effective Compact Strong Simple Light Reliable.
Pipe Supports and Restraints
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
Senior Design: Validation of Design December 15, 2008.
Fall Protection and Ladder Safety Training. Course Outline  Introduction  Fall Protection  Ladder Safety  Wrap-up.
GENERAL PROBLEMS IN HYDRAULIC PRESS
Aerial Apparatus Operator Types and Construction of Aerial Apparatus.
Enhanced Oil Recovery using Computerized Hydraulic Lift Systems
Bridges By: Alison.
Sea Water Scrubber. INTRODUCTION Crystallox has developed a new generation of horizontal and vertical scrubbers for marine and land based applications.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
Types of Structures  Residential - Structures in which people live.  Ex. Single family houses, condominiums, and apartment complexes.  Industrial -
Nordberg LT1213 EASY TRANSPORTATION HIGH CAPACITY.
Group N Chris Jones Ella Feekins Nikoline Hong
THE MITCHELL FRAMING SYSTEM A building system that encourages homeowners to have a direct involvement in driving building growth and expansio n Neal Mitchell.
Bridging the Gap: Building Bridges 101, It Is Time to Get To Work
STRUCTURE By Simonnett Rosenberg Gabriela Di Lorenzo.
BRIDGES.
Bridge Engineering (9-1) Suspension Bridges I. *Components: Anchorage (blocks or tunnel type), towers, main cables, hangers, stiffened (box) girder and.
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
Sustainable (Backpack) NIMS Interns: Dor Yisrael Ashur (UCSD) Aerospace Engineer Olmo Fabian Maldonado Gomez (UTSA) Electrical Engineer Week 5: WPM, Overview,
 Balsa Wood Bridge 8 th. How Does a Bridge Stay Up?
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
Bridge Building History & Bridge Types. History Essential in the development and exploration of North America Allowed pioneers & explorers to move goods.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
IEC COLLEGE OF ENGINEERING AND TECHNOLOGY
Deck Equipment AGOR 27. Deck Crane: TK Deck aft Portable Crane: TK Deck fwd Per Design Specification (J-1) Cranes Shall be capable of:
How selected hoist overload limiter. How should hoist overload limiter Selection Electric hoist is a motor, reducer and rope reel (or chain) as one of.
Miscellaneous Hydraulic Machine
Climbing jack Operating sequences. Lifting sequence.
Diesel Engine Components
Types of Bridges Source:
Chapter-2 Parts of Steel Bridge. contents Bearings Horizontal and transversal wind bracing Classification of bridges.
Optimum Pump Performance for Process Applications
By: Mohamed Ahmed, EIT Clark dietz, inc
Visit us online at Crane Truck Sydney Services By DELTA TRANSPORT.
Structural Considerations for Trusses
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
OFFSHORE CONSTRUCTION
CONNECTIONS IN STEEL STRUCTURES
SHAPER MACHINE SHAPER MACHINE SHAPER MACHINE.
High Pressure Water Jetting
Bridge Engineering: Lessons from Rome to Tacoma
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
Dublin Fire Brigade Training Centre
Universal Parallel Gripper
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
Spring Test Press NST.
Suryoday Technologies ISO 9001:2015 Co.
LIFT,ESCALATOR AND MOVING WALKS
Presenter's Name TENSIONING SYSTEM DEMO UNIT.
Suspension Systems - 2 Topics covered in this presentation:
Presentation transcript:

Strand Jacks Jack Jack support beam Multi-strand cable Very heavy load Fixed anchor & housing Jack Assembly

Strand Jacks Jack Jack support beam Multi-strand cable Very heavy load Fixed anchor & housing Jack support beam Multi-strand cable Main (bottom) anchor Jack (top) anchor Centre hole jack Jack Components

Strand Jacks Jack (top) anchor Centre hole jack Mini jacks Wedges Conical holes

Strand Jacks Main (bottom) anchor WedgesConical holes Centre hole jack Mini jacks Jack support beam

Strand Jacks Jack Jack support beam Multi-strand cable Very heavy load Fixed anchor & housing Jack support beam Multi-strand cable Main (bottom) anchor Jack (top) anchor Centre hole jack Jack Components

Strand Jacks - Range Jack modelNumber of StrandsCapacity (tonnes)Stroke (mm) L15 mk L15 mk L L L L L L L

Strand Jacks - Strand Vitally important to strand jacks are the strands. These are 18mm diameter and are formed from seven wires. The seven wires are wound together to form a helix. After winding they are drawn through a die to compact and harden them. The resulting strand has a guaranteed ultimate tensile strength of 38 tonnes and a factor of safety of 2.5 is normally applied to this to give the safe working load of 15 tonnes. Other factors of safety have been used from 2.0 (short term load during a pulling operation) to 9.0 (inside a nuclear containment area) but 2.5 has been adopted as the industry norm.

Strand Jacks – Power Packs Power packs provide the oil to the jacks and can be powered by diesel engine or electric motor. All power packs have direct, panel mounted, monitoring and control systems. Further electronic monitoring can display number of lift strokes completed and individual stoke positions at each jack. Similar control and monitoring facilities can also be positioned remote from the power pack to fully computerised systems, including automatic lifting and lowering capabilities. Maximum pumping pressure, hence jack lifting force, can be pre-set or altered at will by pressure control valves on the panel.

Strand Jacks – Remote Control Remote control: The control system is a PC operated system to operate up to 20 jacks with total synchronisation. The system features are: Lift and load sensitive detection Overload detection Lift counting Adjustable equalisation of jack strokes during operation

Strand Jacks –Advantages Comprehensive, completely automatic, remote control and monitoring where required; Mechanically fail-safe gripping mechanisms; Pre-set overload protection; Automatic synchronisation of lifting speeds irrespective of loads; Ample operating speeds; Load is held mechanically not hydraulically at any time movement is stopped; Movement can be stopped and held indefinitely at any point in jack stroke; Extremely precise adjustment of the lift for setting of weld gaps or the fitting of steelwork connecting bolts; Automatic lifting and lowering without any personnel in attendance at the jacks; Easy re-distribution of the jack loads; Minimal maintenance of gripping mechanisms; Gripping mechanisms are fully accessible at all times; Full efficiency in all attributes from vertical through to horizontal; Completely self contained & very rugged.

Hammerfest Project Fagioli performed the erection of a 137m high flare stack weighing 638 tonnes. It was raised using two of Fagioli 2 nd Generation Towerlift masts erected to a height of 76.7m. A cantilever lifting arrangement was used and required two L450 lifting jacks and two L300 tie-back jacks. Two SPMTs (20 axles) were used for tailing.

Sahara Project Erection of a 883te vessel. The vessel was erected using Fagioli unguyed Towerlift system in crosshead beam arrangement. Tower height was 64.9m. Four L450 strand jacks were used for lifting. Rigging included a swivel arrangement for reactor rotation. Second (smaller) vessel erected on the same site.

Gatwick Airbridge (1) The lifting system comprised of standard Fagioli PSC Towerlift masts and Strand Jacks - the configuration adopted for this operation was as follows: Four twin base frames and eight 90 feet high rectangular (3m x 2m) format towers. Towers inclined together to form A- frames. Four twin top frames incorporating jack support beams.

Athens Stadium Fagioli carried out the lifting of the tubular arch sections forming the main members of the new Athens Olympic Stadium roof for the 2004 games Tube sections weighed up to 600 tonnes and were lifted to height of 85 metres.

Korean Airlines Hanger The hanger roof at Incheon Airport is one of the largest ever built measuring 180m x 90m and weighing over 5,540 tonnes. The lift utilised two L600 Strand Jacks on each of the six permanent support columns.

BP Pompano Roll-up The Pompano jacket is one of the world’s largest steel offshore platforms. It stands 400m tall on a base that is 128m square at the mudline. Fagioli were awarded a contract for the supply on hire and operation of a jacking system and associated engineering services. For the Pompano roll-up 16 Fagioli L600 jacks, in tension frames, were fastened by slings to the outer edges of the panels. During the initial lift stage the jack system carried 7,700te, at 30 degrees the load on the jack system was 9,500te.

Yoho Deck Lift Lifting of upper and lower deck using eight L600 jacks and four L300 jacks The Upper Deck weighing 740te was lifted to a sufficient height to allow the delivery of the Main Deck, Mezzanine Deck & Trusses beneath. The Upper Deck was then lowered and connected to the assembly below. The complete assembly of Upper Deck, Main Deck, Mezzanine Deck & Trusses weighing 3,735te was lifted to allow the delivery and assembly of Cellar Deck & Mezzanine Deck beneath. The Upper Deck, Main Deck, Mezzanine Deck & Trusses were then lowered and connect to the assembly below.