Sat 17/9 – Sun 18/9 07:00 Cryo problem in point 4 From E. Blanco: First beam dump caused by a cryo PLC not reachable anymore (UX45_QUI) and then 14 minutes.

Slides:



Advertisements
Similar presentations
Status of Cryogenics at point 4 following the power cut L. Tavian 20 August 2011.
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Operation TCR 2 nd of July to 10 th of September 2001 More than 20 major events Events grouped by equipment group and zone affected.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Mystery unable to inject: timing, BIS, SIS… 8:15 to 12: 30 Injection/LBDS studies  Fine delay adjustment of injection kickers  Synchronization of MKI.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
LHC VACUUM SYSTEM: 2012 REVIEW AND 2014 OUTLOOK G. Lanza, V. Baglin, G. Bregliozzi, J.M. Jimenez EVIAN 2012.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
Until Sat 3:30: Stable beams.  Stopped by collimator temperature interlock. Sat 7:00 – Sun 8:30: Cryo stop IR4 and recovery.  PLC problem due to SEU.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
:30 meetingEBH 1  7:53 start VdM scans LHCb  8:18 beam dump: RF M2B1 crowbar (3 rd time within 24 hours)  Access for RF  Changed thyratron.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
05:31 Beam dump due to QPS trigger in sector 78.  Quench heaters discharged in MB10.L8. 07:28 Quench heaters charged ok again in cell B10L8.  Was a EN/EL.
Friday morning Dump fill due to the trip of the RQF.A78  intervention had been just planned for the morning on the circuit Access, interventions:  RQF.A56/78,
RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
08:30 Machines in stand-by 12:30 Access in LHC for QPS and PC:  QPS quench heater power supply RB.A12  EPC for RSF2.A67B2 and RQ9.R8B1.  RCBH27.L1B2.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
BA6 – crab cavity activities in EYETS
Tracker cooling loop “check out” draft for discussion
Wednesday September 14th
XFEL Vacuum System Commissioning
Control systems plans & activities for HL-LHC during LS2
Monday 11/07: Recovery Plenty of accesses.
Thursday 09:30 VdM scan for CMS, standard ADT gain.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Saturday 12:00 Fill 1992 in stable beams.
Power cut 18kV cable for EMD404/E9 is heating
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Wednesday 31 October: Morning
Summary of Week 13 G. Arduini, B. Holzer
Scrubbing progress - 09/12/2012
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Friday March 4th 08h32: Access for beam dump system.
Wednesday 30th November 10:00 Access PZ33 for RP, Cryo, EPC, ELQA
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
LHC Morning Meeting - G. Arduini
Finally.... We had to wait a long time.... We had many problems....
Tuesday Access for RF & QPS (others in the shadow) until ~18:00.
Cryogenics – The Basics
November technical stop activities:
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
LHC - Week 38 Technical stop: Katy Foraz
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 24 September 2011.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Monday 27th August & night
Presentation transcript:

Sat 17/9 – Sun 18/9 07:00 Cryo problem in point 4 From E. Blanco: First beam dump caused by a cryo PLC not reachable anymore (UX45_QUI) and then 14 minutes later a WFip segment with problems: – We intervened in the tunnel (UX45) and replaced the PLC and let the cryo operators recover as soon as possible. The diagnose is to confirm by Schneider once they analyze the dump, but it seems that a SEU can be likely the cause. – Second the WFip problem was caused by an electrical problem (circuit- breaker down). As it was in UX45 I’ve rearmed the breaker and everything went fine. By contrary ½ later it seems that breaker has gone down again. To diagnose by TE/CRG. Recovery of sector 34 – 45 started at ~11:00

Sat 17/9 – Sun 18/9 Few more trips of the WFip rack circuit breaker affecting RF in Sector 45  intervention of TE/CRG – EN/EL (until evening). Problem identified on a heater for the RF cryogenics. Temporary fix found. Cavities in Sector 34/45 have reached a temperature of 70/84 K  Contacted RF expert: short reconditioning only in case of need. Switched ON RF as soon as possible (5 AM) 06:30: Frequent trips of cavity 2B2  Access to replace a controls power supply (completed by now) 08:00 Got the OK from RF to go ahead

Sat 17/9 – Sun 18/9 Over night shift crew started to switch ON all the circuits as they become available Cryo conditions completely recovered at 08:30 Pre-cycling

Accesses CMS Pump problem: faulty cable on a temperature measurement. Resolved. Collimator cooling to maximum possible (O. Aberle): – “We (together with S. Gatard from RP) have been to Pt 7 and I have opened the three TCP and the first 2 TCS on each side to the maximum valve position. There was not much stoke left. The operation during last winter stop of increasing the cooling to two third of nominal flow is the maximum we can do with the actual configuration, limited by the main distribution line. I measured a flow rate of on the TCSG.B5L7.B1, with no change in flow with the last opening of the valve. Compared to the winter stop value we might be even a bit lower” Temperature interlock levels for primary collimators and first two secondaries increased from 50 to 55 C after consultation with V. Baglin.

Collimators temperature and vacuum

Accesses Installation of anti-ecloud solenoid right of Pt 2  500 m of cables installed and solenoid powered (V. Baglin and team)

Accesses Electronics card replaced for the vacuum gauge at the MKI_C replaced RSS.A45.B1 power converter replaced Temporary fix by CV of a water leak (UJ56) detected during EPC access Vacuum gauge control problem fixed in UJ47 QPS intervention in Sector 78

Go for physics Plans