The London Tideway Tunnels Creating a cleaner, healthier River Thames Sian Thomas, Thames Tunnel Project Manager 14 October 2008.

Slides:



Advertisements
Similar presentations
Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
Advertisements

The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
Biodiversity and the Thames Tunnel Stephanie McGibbon, EIA Manager 12 May 2011.
DC Water Town Hall Meeting Series 2013 General Manager George S. Hawkins.
Adapting the city. Water Infrastructure & Climate Change Chris Matthews.
Bathing Waters and the North West Approach. Bathing Waters and the North West Bathing waters and the North West The North West has 32 designated bathing.
Huntly Flood Alleviation Scheme
Presented by NEORSD Richard J. Switalski, P.E. Presented by NEORSD Richard J. Switalski, P.E.
Why London needs the Thames Tunnel IEMA Conference 2011 Optimising Infrastructure within environmental limits Tuesday 15 November 2011.
Northern Ireland Water QUESTOR Centre, QUB. Introduction: UK Water Industry 25 water companies in England & Wales 12 water and sewerage providers 13 water.
Fay, Spofford & Thorndike TOWN OF BELMONT WINN’S BROOK SEWER OVERFLOW MITIGATON Presentation to the BOARD OF SELECTMAN December 7, 2009.
Northumbrian Water Ouseburn Flooding - Brunton Park Meeting 17th January 2006.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
Timeline of Key Milestones and Dates DateKey Milestone February 2007Washtenaw County Drain Commissioner’s Office authorizes a project to identify opportunities.
City of Los Angeles Venice Dual Force Main Project
Truro DG5 Scheme April Integrated Urban Drainage Schemes Proposed Hendra Road surface water separation Kenwyn Street Proposed Redannick Lane surface.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting July 12, 2012.
June 23, 2011 Southwestern Illinois Council of Mayors.
Norwalk, Connecticut: A Public-Private Partnership Case Study Mayor Alex Knopp U.S. Conference of Mayors Urban Water Council October 2004.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
Sustained Compliance for Public Water Systems, Chapter 2, Workshop Department of Environmental Conservation Drinking Water Program Anchorage, September.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
SEA for Sanitation & sewerage in Metro Manila, Philippines Manila Third Sewerage project.
Hebden Bridge A case study considering the contribution of overland flow processes to flood risk in Hebden Bridge, West Yorkshire.
National Urban Waste Water Study (Covers catchments with a population equivalent of 2,000 or more outside the Greater Dublin Area) Department of the Environment,
MTF Rail Development Forum
Water Cycle Strategies An integrated approach? Dr Jon Hillman, Scott Wilson Paul Hunt, Sustainable Development Delivery Team, Environment.
Ian Williamson Chief Officer Greater Manchester Health and Social Care Devolution NW Finance Directors Friday 15 May 2015 Ian Williams Chief Officer Greater.
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager Briefing on: NORTHEAST BOUNDARY NEIGHBORHOOD PROTECTION PROJECT FIRST.
Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2.
Severn Tidal Power Feasibility Study Background to the study Terms of reference announced in January 08 Aim of the study: To enable Government to decide.
 Commissioners in Somerset wanted to test whether outcomes based commissioning would lead to better outcomes and greater financial sustainability  External.
Unit of Environmental Engineering – University of Innsbruck, Austria Do we measure the right parameters in the right place(s)? Günther LEONHARDT M. Kleidorfer.
MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
every five years water and sewerage companies submit their investment plans to the industry regulator Ofwat this is known as the ‘Price Review’ the next.
MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013.
1/38 Urban Flood & Climate Change ----information from APWMF and SIWW Jinping LIU Hydrologist Typhoon Committee Secretariat.
PROJECT UPDATE GEOFF LOADER, HEAD OF STAKEHOLDER ENGAGEMENT
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
Renewing Old Sewers The Example of London
The SaTH Foundation Trust Programme Deborah Shaw March 29th 2007.
Metropolitan Council Environmental Services A Clean Water Agency Proposed Combined Sewer Overflow Changes Environment Committee March 11, 2008 Keith Buttleman.
INNOVATION ON THE THAMES NOVEMBER 2015 ANDY MITCHELL CBE, CHIEF EXECUTIVE OFFICER.
Introduction to the West Midlands Combined Authority West Midlands CVS Tuesday 12 April 2016 Dr Martin Reeves Chief Executive, Coventry City Council Chief.
Coastal Aquifer Management in the Caribbean Workshop 14 th -16 th December 2011 The Water Resource Management Agency Ministry of Sustainable Development,
1% Sales Tax Commission Board Meeting June 3, 2015.
1 Tunnel –v- Surface Routes A UK perspective from Alan Dyke Former MD Channel Tunnel Rail Link Project.
Improving connectivity in East London Crossings, Connections & Community Supporting growth and housing delivery in East London Crossings, Connections &
Catchment Management: Impact of climate change on delivery and investment Innovative responses to Climate Change Luke de Vial Head of Environment and.
Update on the Richland Creek Reservoir and Water Supply Program Paulding County, Georgia Board of Commissioners Workshop Briefing May 26, 2015.
Asset Degradation Modelling at Townsville Water
BUILDING FOR 22ND CENTURY LONDON
Stage 2 Light Rail Transit Program “In the ground ready”
Our plan for new river crossings for London
Presented by Tom Heinemann, CH2MHILL October 2, 2013
Welcome to the Libertyville Stormwater Master Plan Open House
Nunavut Water Board Public Hearing
Update on PI Modeling and Nitrogen Removal at Blue Plains
Activity and Performance Report July – September 2016
Hydrosphere Notes Parts 4- Watersheds.
Manchester’s CSO Program: A Look Behind and a Look Ahead
UNDP-GEF Project on Lake Tanganyika Best Practices and Challenges
Springbrook Estates Sewer Improvement Area Informational Meeting
Impact of climate change on water cycle: trends and challenges
Hebden Bridge A case study considering the contribution of overland flow processes to flood risk in Hebden Bridge, West Yorkshire.
Severn Tidal Power Feasibility Study
Melbourne Main Sewer Replacement Project Briefing for Canoeing Victoria August 2008 February 22, 2019.
Presentation transcript:

The London Tideway Tunnels Creating a cleaner, healthier River Thames Sian Thomas, Thames Tunnel Project Manager 14 October 2008

2 Improving the Tidal River Thames Latest contribution to river water quality improvements –Building on the legacy of Sir Joseph Bazalgette’s intercepting sewers –Many years of investment in Sewage Treatment Works (STWs) in the Thames catchment area Main drivers –River quality (fish, health & litter) –UK compliance with legislation –Reputation of London as a world class city Two separate tunnels – the Thames Tunnel and Lee Tunnel – reducing discharges from CSOs Investment to improve the STWs discharging into the tidal River Thames

3 River Roding Barking Creek Beverley Brook River Lee 8383 Counters Creek Forest Hill Stoke Newington Hampstead Roehampton Streatham Eltham Woolwich Bow Islington Waterloo Graveney Stamford Brook Black Ditch Earl Peck Effra Falcon Brook Wandle Beverly Brook Ravensbourne Deptford Creek Oldbourne Westbourne Tyburn Hackney Brook Walbrook Hounds Ditch Fleet Battersea Chelsea Quaggy Neckinger KidBrook Kings Scholar’s Pond Erith Notting Hill Kilburn The Old Rivers of London

4 Intercepting Sewers by the Metropolitan Board of Works

5 Storm Relief Sewers & Pumping Stations 1910 to 1960

6 London’s Sewerage System

7 Combined Sewer Overflows (CSOs) Bazalgette’s sewerage system designed with 57 Combined Sewer Overflow (CSO) points along the tidal River Thames – public health driver CSOs prevent flooding to buildings and streets by spilling excess sewage into the river during heavy or prolonged rainfall 32 million tonnes (average) of diluted storm sewage discharged annually Up to 60 discharges a year on average – more than once a week.

8 21 st Century Challenges Increasing urbanisation – paving over of gardens; loss of land available to soak up rainfall Climate change leading to more frequent, more intense storm events. August 2004: average monthly rainfall within a couple of hours (west London). Population growth – more than a million additional people in London by 2029

9 CSO Impacts Reduced levels of oxygen affect aquatic wildlife e.g. Aug 2004 event - 10,000 fish and 100,000 fish fry killed Visible littering of the river shoreline from sewage- derived litter Potential health risks to river users

10 Milestone Dates February 2000 Thames Tideway Strategic Study (TTSS) set up to investigate and propose solutions to CSO discharges February 2005 TTSS concluded need for both improvements to the existing STWs and building a tunnel to intercept 36 of the most polluting Tideway CSOs August 2005 Ofwat commissioned independent review by Jacobs Babtie July 2006 Government instructed Thames Water to evaluate two options for a tunnel under the tidal Thames

11 Milestone Dates December 2006 Submitted our report to Government on the assessment of the two options detailing costs and benefits March 2007 Minister Ian Pearson announced Government’s decision to support the development and implementation of the full-length tunnel solution March 2008 Appointed CH2M HILL as Programme Management capability to assist with delivery of the Tideway Tunnel

12 Thames Tideway An Integrated Solution London Tideway Tunnels and improvements to London’s five main STWs Beckton, Crossness, Mogden, Longreach and Riverside improvements – funding agreed with Ofwat as part of Price Review process. Beckton STW improvements needed to increase flow to treatment and treat storm sewage pumped out from the London Tideway Tunnels.

13 London Tideway Tunnels Proposed Concept Lee Tunnel (Abbey Mills to Beckton STW) 6.9km long, >7m diameter, up to 75m deep If approved approx 5 years to construct Beckton STW Extensions If approved approx 5 years to construct Thames Tunnel (West London to Beckton STW) 32.2km long, >7m diameter, up to 75m deep If approved approx 8 years to construct

14 Thames Tunnel Overview 32.2km tunnel from west London to Beckton STW in east London Several major shaft sites along the tunnel route 34 CSOs will connect into the tunnel If approved, tunnel construction could start in 2012, lasting approximately 8 years

15 Thames Tunnel Tunnelling and CSO Connection Sites Sites required for three main purposes: -Main construction shafts (X 3 – 5 approx) -Intermediate construction shafts (X 3 – 4 approx) -CSO connections (X 34) Initial briefings held with 13 London Boroughs (Autumn 2008) Site selection methodology under development for consultation Securing sites is key to ongoing design development Key constraints and challenges - Tunnelling at depth in varying ground conditions - CSO connections, surface works and connection to main tunnel - Stakeholder engagement is vital

16 Blackfriars Bridge CSO Engineering Challenges

17 Lee Tunnel OJEU Notice Dec 2007 Planning Application Lee Tunnel and Beckton STW May 2008 Lee Tunnel Contract Award Mar 2009 Commission Lee Tunnel and Beckton STW June 2014 Minister’s Decision Mar 2007 Thames Tideway Tunnel Timeline Lee Tunnel, Beckton STW and Thames Tunnel Thames Report to Government Dec 2006 Planning Application Thames Tunnel 2011 Thames Tunnel Contract Awards 2012 Commission Thames Tunnel June 2020 Start Site Investigation Thames Tunnel 2008