Geodetic Survey Modernisation activities 2014 ISV Surveying Expo Roger Fraser, Geodetic Survey Office of Surveyor-General Victoria.

Slides:



Advertisements
Similar presentations
Using GNSS to establish a Height Datum on a Survey
Advertisements

1st Meeting of the Working Party on International Trade in Goods and Trade in Services Statistics - September 2008 Australia's experience (so far) in.
The development of a modern geodetic system in New Zealand GRAEME BLICK and NIC DONNELLY Customer Services - Geodetic.
The Geoscience Australia’s Online GPS Processing Service (AUSPOS)
1 Auditing in the Public Interest Records Management in the Victorian Public Sector Audit objective Audit had two objectives : The first objective was.
New Geometric Datum: plans Modernizing the U.S. National Spatial Reference System FGCS San Diego, California Monday 11 July 2011.
US Army Corps of Engineers BUILDING STRONG ® 5/7/2015 Adopting National Standards for Tidal and Geodetic Datums Jim Garster US Army Corps of Engineers.
NGS Updates MARTI IKEHARA, Geodetic Advisor CLSA Monterey Chapter June 2011.
LINDA MORGAN PRINCIPAL CONSULTANT – SPATIAL POSITIONING WESTERN AUSTRALIA SURVEYING CONFERENCE 2013 Geodetic Stuff You Need to Know: Datums, Standards.
NGS Geodetic Tools and Education Services Marti Ikehara: California Geodetic Advisor
GNSS In Australia; An Overview Peter Ramm CGSIC Savannah Sep 2009.
UNCLASSIFIED Feedback on the New Datums 2015 Geospatial Summit April 13 to 14, 2015 National Geospatial-Intelligence Agency (NGA) Stephen Malys NGA Senior.
National Geodetic Survey NOAA’s National Geodetic Survey
1 GPS and GNSS Activities in Hong Kong Simon C W KWOK Geodetic Survey Section Lands Department Hong Kong 35th Civil GPS Service Interface Committee Fairfax,
Better Positions and Improved Access to the National Spatial Reference System  Multi-Year CORS Solution  National Adjustment of 2011  New NGS Datasheet.
Refinements to the North American Datum of 1983 Multi-Year CORS Solution and the National Adjustment of 2011 Dr. Neil D. Weston Chief, Spatial Reference.
MTF Rail Development Forum
Towards a Positioning and Location Policy for Victoria Olaf Hedberg Chair, Victorian Spatial Council Survey and Spatial Information Victoria 2008 Summit.
Nu Project Management Office A web based tool to Manage Projects.
Feedback on the New Datums 2015 Geospatial Summit April 13 to 14, 2015 U.S. Geological Survey Kari J. Craun.
Marc Véronneau Canadian Geodetic Survey, Surveyor General Branch
The Next-Generation Australian Geodetic Datum Benefits and Challenges
Victorian Cadastral Surveying Issues ISV Regional Conference Wangaratta 17 April 2015 John E Tulloch Surveyor-General of Victoria.
FROM THE OFFICE OF SURVEYOR-GENERAL VICTORIA ISV GLENELG GRAMPIANS GROUP SEMINAR 21 November 2013 David Boyle Deputy Surveyor-General Victoria.
Revised Change, Configuration, Release (CCR) Rollout Overview
GEODETIC INFRASTRUCTURE Walter Volkmann Manager of Technical Operations L. D. Bradley Land Surveyors Gainesville, Florida.
United Nations Statistics Division
The ISO Registry of Geodetic Codes & Parameters ISO/TC 211 … building the foundation of the geospatial infrastructure, brick by brick... REFAG2014, Luxembourg,
Mission Planning and SP1. Outline of Session n Standards n Errors n Planning n Network Design n Adjustment.
1 North American Reference Frame (NAREF) Working Group Mike Craymer Geodetic Survey Division, Natural Resources Canada 2nd SNARF Workshop Montreal, May.
Internal Audit of Procurement Organisation Review TIMELINE TOPIC GROUP 17 th February 2009.
Review on development of SDI as a basis of E-government in Croatia Ivan Landek, assistant director State Geodetic Administration of RoC International Workshop.
A New & Improved National Spatial Reference System Refinements of the North American Datum of 1983 through the Multi-Year CORS Solution and the National.
Victorian Update CGSIC July 2006 Peter Ramm
Transition of the ORGN from NAD 83(CORS96) epoch to NAD 83(2011) epoch Ken Bays, PLS Lead Geodetic Surveyor Oregon DOT March 2013 ODOT.
New Vertical Datum Implementation Plan FGDC Silver Spring, MD. July 30, 2013 Mark C. Eckl Chief of the Observation and Analysis Division, National Geodetic.
Presented by: Leila Hernandez Dennis Manglicmot GMAT 9205 Fundamentals of Geo-positioning.
CORS and SNARF Giovanni Sella NOAA- National Geodetic Survey noaa.gov AGU Fall Meeting SNARF Splinter Session San Francisco, CA December.
NOAA’s National Geodetic Survey Update Michael Dennis, RLS, PE ® Esri Survey Summit July 6-9, 2013 ● San Diego, CA.
CBSC May 2015 (Mexico City, Mexico) Progress Report on the IHO GIS including C-55 IHB.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Geocentric Datum of Australia Geocentric Datum of Australia (GDA) Peter Todd Project Manager GDA Implementation ICSM Matt Higgins Technical Manager GDA.
Coastal Zone 2011 Conference “Cool Geodetic Resources For Your Project” A National Ocean Service, NOAA, Presentation 1)TOOLS TO OBTAIN GEODETIC CONTROL.
Performance Management: Getting Ready for Accreditation Needs Assessment Survey Community Assessment 1 Online survey Open to anyone interested in this.
Feedback on the New Datums Reference Frames 2015 Geospatial Summit April 14, 2015 Amar Nayegandhi Dewberry Consultants LLC.
National Geodetic Survey – Continuously Operating Reference Stations & Online Positioning User Service (CORS & OPUS) William Stone Southwest Region (UT,
National Spatial Reference System: Present and Future Marti Ikehara, Geodetic Advisor NOAA’s NGS, Sacramento
New Vertical Datum: plans, status, GRAV-D update FGCS San Diego, CA. July 11, 2011 Mark C. Eckl NGS Chief of Observation and Analysis Division, New Vertical.
NGS Updates MARTI IKEHARA, Geodetic Advisor CLSA Marin Chapter June 2011.
Revolution in Earth Measurement Traditional Surveying uses benchmarks as reference points Global Positioning uses fixed GPS receivers as reference points.
The Height Modernization Program in the United States and the Future of the National Vertical Reference Frame 1 Renee Shields National Geodetic Survey,
District Action Plan Strategic Planning for Student Success Board Meeting March 24, 2015 Dr. Rodney Thompson, Superintendent.
Integrated Change Control 1 MEC-8. Processing of a Change Processing of a Change 2 Assess Impact within KA Change Request Implemented Change Create a.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation ERCOT Board Of Directors – August 15, 2006 TPTF Meeting August.
Creating an Interoperable Learning Health System for a Healthy Nation Jon White, M.D. Acting Deputy National Coordinator Office of the National Coordinator.
Taskforce on Employment meeting, February 2014 | 1 SESSION 3: EMPLOYMENT PLANS AND PROGRESS REPORTING TASKFORCE ON EMPLOYMENT MEETING, FEBRUARY
SECOND NATIONAL STEERING COMMITTEE FOR THE ESTABLISHMENT OF CMAs IN SOUTH AFRICA 8 February 2013 CMA Roll-Out Progress Mpumalanga Regional Office (Olifants-Letaba)
National Height Modernization Program Strategic Plan Renee Shields, Height Modernization Program Manager.
Reliability Standards Development Plan David Taylor Manager Standards Development Standards Committee Meeting June 12-13, 2008.
Debriefing the Geospatial Summit NGS Monthly Webinar Series September 10, 2015.
Nic Donnelly – Geodetic Data Analyst 5 March 2008 Vertical Datum Issues in New Zealand.
Development Project Management Jim Kowalkowski. Outline Planning and managing software development – Definitions – Organizing schedule and work (overall.
Quality Improvement and Change Management Unit Engagement Workshop.
Software Development Update Nate Davis, Chief Operating Officer.
Moving to a Results Based-Management Environment Progress Report January
July 27, Brain Works Consulting, LLC 1.
Modelling Australian geodetic data and metadata Roger Fraser & Nick Brown eGeodesy Working Group, Permanent Committee on Geodesy.
Hayden Asmussen, Department of Environment, Land, Water and Planning 15/06/
CSV / ISV Joint Seminar – 25 May 2018
Natura 2000 management group Brussels, 19 May 2011
Presentation transcript:

Geodetic Survey Modernisation activities 2014 ISV Surveying Expo Roger Fraser, Geodetic Survey Office of Surveyor-General Victoria

Outline Geodetic Strategy Consultation Draft New version of SMES Re-adjustment of Victoria’s GDA94 and AHD survey control networks Progress towards datum modernisation 2

Geodetic Strategy 3 Available as a consultation draft Identifies strategic context, priorities and challenges Focussed on improving positioning accuracy and reliability Guided by 2013 Geodetic Infrastructure Questionnaire results Closing date for feedback is 29 August

Geodetic Strategy 4

5

6 Total responses: 217

Geodetic Strategy 7 Total responses: 177

New version of SMES 8 New interface with updated VicMap data, Google street view Revised survey control mark categories and symbols Flexible search options and several download format options Online submission of sketch plans and raw survey measurements New geodetic measurements database Rigorous network adjustment system for processing of Victoria’s GDA94 coordinates and AHD heights Open Web Services to support location based services applications

New version of SMES 9 maps.land.vic.gov.au/smes

New version of SMES 10 LegendDescription SCN Mark. PM with adjusted GDA94 coordinates, no AHD height SCN Mark. PCM with adjusted GDA94 coordinates, no AHD height SCN Mark. PM with estimated GDA94 coordinates, levelled AHD height Non-SCN Mark. PM or PCM with estimated GDA94 coordinates, no AHD height Non-SCN Mark. PM or PCM with estimated GDA94 coordinates, estimated AHD height SCN Mark. PM with adjusted GDA94 coordinates, levelled AHD height SCN Mark. PM with adjusted GDA94 coordinates, estimated AHD height Defective PM or PCM

maps.land.vic.gov.au/smes 11

maps.land.vic.gov.au/smes 12

maps.land.vic.gov.au/smes 13

maps.land.vic.gov.au/smes 14

maps.land.vic.gov.au/smes 15

2014 Victorian Adjustments 16 Victoria’s GDA94 and AHD networks re-adjusted. New constraints GDA94 adjustment fully integrated with GPSnet AHD adjustment aligned with AUSGeoid09 Rigorous uncertainties Automated process within SMES

2014 Victorian GDA94 Re-adjustment 17 UncertaintyPercentage % % % %

2014 Victorian GDA94 Re-adjustment 18 CorrectionPercentage % % % %

2014 Victorian AHD71 Re-adjustment 19 UncertaintyPercentage % % % %

GDA94 - initial establishment 20 GDA94 constraints

GDA94 – Present foundation 21 Present constraints

Survey Control Network 22

Progress towards datum modernisation 23 Revised constraints (AuScope and GNSS CORS) National geodetic networks assembled Reprocessing of all old GNSS data Rigorous adjustment software run on ANU supercomputer Research into best approach for handling deformation and uncertainty Business plan and communication strategy

Progress towards datum modernisation GDA94 Established Continuously realised 2012 Update National re-adjustment 2015 Victorian re-adjustment 2014 Divergence of GDA94 from ITRF (metres) 7cm per year GDA94 Adopted

ITRF velocity model 25

Progress towards datum modernisation 26 New datum based on 2020 epoch (1.8m difference) Continuously realised frame, and a static realisation New tools and procedures Stakeholder consultations being run to identify issues, implications and best transition approach ICSM PCG and OSGV to provide leadership and assistance to surveying and spatial information stakeholders

Geodetic Survey Modernisation activities 2014 ISV Surveying Expo Roger Fraser, Geodetic Survey Office of Surveyor-General Victoria