Stave Lake Water Supply & Treatment Project. Existing Water Supply System Norrish Creek Cannell Lake 19 Groundwater Wells.

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers BUILDING STRONG ® State of Tennessee Regional Water Supply Planning Pilot Studies Benjamin L. Rohrbach, P.E. Chief, Hydrology.
Advertisements

Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
© 2013 O’Brien & Gere Volute Press Application on Water Treatment Residuals 2013 NYC Watershed / Tifft Science & Technical Symposium September 19, 2013.
Wastewater Treatment Project Update May 15, 2013.
A REVIEW OF THE REMEDIATION ALTERNATIVES FOR BENZENE CONTAMINATION AT THE PESTER REFINERY COMPANY SUPERFUND SITE Jonathan M. Diller, P.E., CFM for University.
Funding for Municipal Infrastructure Ruth Noemí Colón Acting Secretary of State George Stafford Deputy Secretary of State Public Finance and Management.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
Community Water Supply Resources Implementation Strategy Lane Auditorium Albemarle County Office Building September 13, 2007.
BCRUA Deep Water Intake Alternative Site Study November 15, 2007.
One Water Management Research Jennifer Warner One Water Management Network Meeting Hunton & Williams Board Room – Washington, DC June 20, 2013.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Bruce Moore, Manager Colorado River Division Southern Nevada Water Authority July 28, 2010.
EBMUD: A Decade of Seismic Mitigation Progress – More Work to Do By Bill Cain, S.E. Project Manager Seismic Mitigation Planning Member, ABAG Lifeline Infrastructure.
Water Treatment and Distribution in London. Lake Huron & Elgin Area Water Supply Systems London is supplied treated water through the Lake Huron Primary.
CE HYDRAULICS ENGINEERING
‘The world’s greatest plumbing system’ An example of how a river is managed to use its water as a resource.
Overview and Project Approach  Clinton is currently experiencing surface water supply shortages in their raw water source, Clinton Lake, and has been.
Jordan Lake Partnership Western Intake Feasibility Study Jordan Lake Partnership Western Intake Feasibility Study 1.
Presented by Ralf Topper, CPG 30 th Colorado Water Workshop July 28, 2005.
Water Research Foundation Workshop: Benchmarking April 23, 2015.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Water System Planning Study
Sole Source Contracts for Administrative Hearing Southeast Water Supply Augmentation Project Presented to: Orange County Board of County Commissioners.
Stave Lake Water Supply and Treatment Project Business Case for P3 Canada Fund Funding Request AMWSC April
OUR URBAN WATER SUPPLY … THE PLAN FOR MEETING OUR FUTURE WATER SUPPLY NEEDS LAWRENCE C. TROPEA, JR., P.E.,DEE EXECUTIVE DIRECTOR RIVANNA WATER & SEWER.
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
Agenda August 5, Introduction – Natalie Robottom 2.Background and History – Rob Delaune 3.Present Conceptual Engineering Design Proposed Tasks -
Thames Valley/Matatoki Water Supplies October 2012.
Western Irrigation Futures Customer Information sessions May 2010 Bacchus Marsh Irrigation District.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Wenatchee Heights Area Pipe open ditches Line storage reservoir Create additional storage capacity Improve river system pumping (add pump station) Finalize.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
Freshwater Resources Chapter 4, Lesson 3. Where do we get our water from?  Running water  Standing water  Reservoirs: man-made lakes used to store.
Stakeholders Meeting November 15,  Review the development and identification of State’s preferred alternative  Provide updates on SCH Project.
Water Resources for Hertfordshire Alex Back Hydrologist 28 th October 2010.
1 NORTH VALLEY REGIONAL WATER AND WASTEWATER PROJECTS MEETING OF THE NEW MEXICO-TEXAS WATER COMMISSION May 19, 2005.
Alabama Water Resources Conference Perdido Beach, Alabama Mac Underwood, General Manager BWWB BIRMINGHAM WATER WORKS BOARD Sustainability of Water Supply.
17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.
Water Supply Planning in Hampton Roads: Options for an Uncertain Future The State of Virginia’s Water Resources October 28, 2015 Whitney S. Katchmark,
Jessica Williams. History/ Basic Information The CWA was formerly known as the Federal Water Pollution Control Act, which was made in 1948 and was the.
Richland Creek Water Supply Program Contract for WTP and Pump Stations CMAR Services and Program Update Paulding County, Georgia Board of Commission Work.
Reservoir Development Update Region K Meeting July 11, 2012 Karen Bondy, P.E. Manager of Resource Strategy 1.
Metropolitan Council Water Supply Planning in the Northwest Metro Water Availability Technical Focus Group : June 9, 2008 Lanya Ross Senior Environmental.
Update on RCR Permitting
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
Environmental Pollution -any addition of undesirable substances to the soil and air, and both surface and groundwater by human activities -can spread far.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
Richland Creek Water Supply Program Update and Design-Build Contract for 48” Raw Water Pipeline Paulding County, Georgia Board of Commissioners Workshop.
Remedial Measures Plans Response to EQC Questions June 21, 2011 Presentation to Lexington-Fayette Urban County Government Environmental Quality Committee.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
San Francisco Public Utilities Commission Water System Improvement Program Bay Division Pipeline Project July 14, 2009.
1 Update: July 7 th, 2016 Investing in the Rideau Canal Bobs Lake Dam Project.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Richland Creek Water Supply Program Briefing
Kings Bluff Raw Water System Parallel Raw Water Main Project
North Texas Municipal Water District “Regional Service Through Unity … Meeting Our Region’s Needs Today and Tomorrow” Water Supplies Vital for the Future.
PRESENTED BY DEPARTMENT OF UTILITIES
“Keeping Water on the Land”
FY Proposed Budget and Rates Water Transmission System
Gull lake sewer + water authority
River Basin Management Flood protection
Future Water Supply Evaluation
Metropolitan Tunnel Redundancy Program Update
White Flint North Entrance Feasibility Study
MANILLA WATER SUPPLY UPGRADE
Presentation transcript:

Stave Lake Water Supply & Treatment Project

Existing Water Supply System Norrish Creek Cannell Lake 19 Groundwater Wells

Water Demand vs. Existing Supply Water Supply (MLD) Existing (2007)Future (2031) Demand (MLD) Surplus/(Deficit) (MLD) Demand (MLD) Surplus/(Deficit) (MLD) Average Day (20) Maximum Day (154) The City of Abbotsford has one of the lowest per capita water uses in the Lower Mainland.

Other Sources Considered Hayward Lake – ($220M NPV) - Potential contamination from Mission landfill leachate. Pumping costs. Stave Lake – ($224M NPV) Fraser River – ($232M NPV) - Requires significant pumping and has significant turbidity spikes. Harrison Lake – ($334M NPV) - Long distance and high cost. Pumping costs. Dickson Lake – ($239M NPV plus dam upgrade costs) - Potential for difficult and lengthy environmental process. No redundancy. Chilliwack Lake – ($374M NPV) - Long distance and high cost. Potential geotechnical challenges. Most of these source options did not address the required filtration of the Cannell Lake water source.

New Water Source – Stave Lake Consists of an intake, pump station, water treatment plant and transmission mains from Stave Lake, through Mission and into Abbotsford. Includes a crossing of the Fraser River.

New Source – Stave Lake Estimated Completion Year2015 Intake/Pump Station (1) $50 M Water Treatment Plant (2) $130 M Pipeline Construction (3) $105 M Reservoir Construction (4) $15 M Total Capital Cost$300 M

Stave Lake Intake Design Many design options were considered and ranked by costs, as well as potential impacts to the community and environment. An underground tunnel connecting intake with pump station avoids disturbing known archeological sites. Site will be buffered by trees along shoreline to shield pump station from view.

Next Steps Focus on federal and provincial environmental permitting and site review. Consultation with public, stakeholders and First Nations. Investigate procurement models for Project.

Construction Construction of the transmission main south of the Fraser River will begin this spring. This will improve the ability of the AMWSC to meet maximum day demands in the short term.

Grant Funding Applied for P3 Canada Fund funding in June 2010 Potential for 25% capital funding Procurement business case was completed by Deloitte/CH2M Hill advisor team Will also be seeking Provincial funding sources for this project

Next Steps