Genesee County Drain Commissioner Water and Waste Services Division District #3 Linden WWTP Digester Improvements Project, Phase I Joe Goergen, GCDC -

Slides:



Advertisements
Similar presentations
SPRINGETTSBURY TOWNSHIP.
Advertisements

JOINT MEETING OF ESSEX AND UNION COUNTIES Virtual Plant Tour.
Regional Digester Manure and Food Processing Waste.
Energy Efficient Steam Systems
Metro Wastewater Reclamation District Digester Complex What works and what doesnt.
Welcome to American #2 Wastewater Treatment Plant.
Virtual Tour of Municipal Wastewater Treatment Plant (WWTP) Prepared by Dr. Richard O. Mines, Jr., P.E. Mercer University Environmental Engineering Department.
The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
HURRICANE SANDY PASSAIC VALLEY SEWAGE COMMISSION AIR MONITORING PROJECT JEFF MEYER NORTHERN REGIONAL OFFICE AIR COMPLIANCE AND ENFORCEMENT.
Treatment of Slaughterhouse Wastewater
Anne Arundel County Department of Public Works
Wastewater Treatment Plants & Bacteria: Strategies for Compliance Wastewater Collection Systems Teague Harris Pate Engineers, Inc. John Montgomery Municipal.
Harris County Onsite Wastewater Reuse Program John Blount, P.E. Director of Planning & Operations.
Energy Efficient Design Low Cost State Loan Low-Impact Construction Novato Sanitary District Wastewater Facilities Upgrade Presenter: Beverly James, Manager-Engineer.
Innovative Tools for Energy Savings T. Allbaugh, P.E., S. J. Kang, Ph.D., P.E., K. Williams, P.E., W. Kramer, P.E., G. Jones, P.E., K. P. Olmstead, Ph.D.,
Results of BOC’s Fog (Fats,Oils,Grease) Reduction Program at a WWTP-62 MGD (234,696 m 3 /Day)
“Nucor Road Industrial Corridor – Sanitary Sewer Project” Presented by: Justin Longstreth, P.E. Brian Hannon, P,E, Moore & Bruggink, Inc. October 14 th,
City of Oshkosh Water System. Public Works Utility Division Water Filtration Plant Water Distribution System Wastewater Collection System Pumping Stations.
INTRODUCTION TO THE TREATMENT OF TANNERY EFFLUENTS
CTC 450 Review Secondary Treatment Trickling Filters Biological Towers
Surface Water Treatment Plant
® (With apologies to George Lucas) City of Boulder.
Presentation Overview
Municipal Wastewater Treatment Preliminary Seventh Power Plan Energy Efficiency Estimates November 18, 2014 West Point Wastewater Treatment Plant, Seattle.
NC AWWA-WEA 93rd Annual Conference November 12, 2013 Tim Woody Resource Recovery Division Director, City of Raleigh Jonathan Treadway P.E, BCEE, CDM Smith.
WASTE WATER TREATMENT FOR RITONAVIR PRODUCTION PLANT Presented by Wang Dong Mei July 8, 2000.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Sludge Treatment CE 326 Principles of Environmental Engineering Department of Civil, Construction and Environmental Engineering Iowa State University Prof.
Domestic Waste Water Treatment
Municipal Wastewater Efficiency Improvements Potential Savings for the 6 th Power Plan September 30, 2008 Regional Technical Forum South Treatment Plant.
WASTEWATER TREATMENT IN LAHTI There are 2 wastewater treatment plants in Lahti - Kariniemi - Ali-Juhakkala In these slides we examine waste water treatment.
Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010.
Pollutants in wastewater -- Revisited Ammonia Organic matter Nutrients Pathogens Color Metals and SUSPENDED SOLIDS.
Cheri Cousens, P.E. – Executive Director September 15, 2010.
SEWAGE TREATMENT.  Sewage is the mainly liquid waste containing some solids produced by humans, typically consisting of washing water, urine, feces,
Project History Town of Newport Population: 550 Vermillion County Seat.
Waste Water Treatment Plant. HOW DO TREATMENT PLANTS PROTECT OUR WATER? Wastewater treatment plants: Remove solids, everything from rags and plastics.
CHAPTER 5: Mass and Energy Analysis of Control Volumes
Brown Grease to Biogas at WWTPs Puget Sound Brown Grease Symposium April, 2009.
Massachusetts Water Resources Authority Presentation to MWRA Advisory Board MWRA Residuals Processing & Agreement for Operation and Maintenance of the.
The Schererville Wastewater Treatment Plant is located in Northwest Indiana and serves the wastewater needs of a population base of approximately 45,000.
Where it goes when I go ! A look into London’s waste water challenges.
November 17, 2015 NC AWWA-WEA Annual conference
Persevering to Get What You Need Mark Estes HCSA Executive Director Scott Ehrhardt P.E, George Anipsitakis PhD P.E, HCSA Maple Ave Regional WWTP Expansion.
NYWEA ENERGY SPECIALTY CONFERENCE November 20, 2014 Towards Net-Zero Energy in Wastewater Treatment Demonstration of ClearCove’s Enhanced Primary Treatment.
Energy Saving Measures - 1
CEE 426 September :05 PM UW Madison Room _____ Engineering Hall Energy in Wastewater Treatment Plants Thomas E. Jenkins, P.E. 1.
1 Wastewater Treatment Processes Jae K. Park, Professor University of Wisconsin-Madison.
Study of the U.S. Institute for the Environment Introduction to Water and Wastewater and Treatment Tuesday July 14, 2009.
© 2014 Evoqua Water Technologies LLC INTRODUCING THE CAPTIVATOR George Smith; Director of Biological Processes.
Aeration System Opportunities Dave Reardon, PE, ENV SP HDR National Director - Water Sustainability WW/W Sustainable Energy Cohort-Session 5 January 31,
Engineered systems for wastewater treatment and disposal.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
2011 WCW Conference. Fort McMurray James Sacker, Director Environmental Hugh Crawford, Wastewater Supervisor Plant Operations staff Alberta Environment.
Dr. Mohab Kamal. CE 445 Water Reclamation and Reuse (Dr. Mohab Kamal) 2.
1 CTC 450 Review WW Sludge Processes. 2 Objectives Understand the basics with respect to operation of wastewater systems.
Welcome to American-Bath Wastewater Treatment Plant.
Agitation & Mixing of fluids
CTC 450 Review WW Sludge Processes.
Lecture Objectives: Learn about thermal storage systems
Schererville WasteWater Treatment Plant
Lecture (8): liquid wastes treatment (primary, vital, advanced).
Victor Valley Water Reclamation Authority Biogas to Energy Project with Omnivore™ Digester Demonstration May 30th, 2013.
CTC 450 Review Secondary Treatment Trickling Filters Biological Towers
Schererville WasteWater Treatment Plant
Methods for Wastewater and Sludge Treatment
Wastewater Facilities Upgrade Project
A Tale of Two Plants: How Combining WWTP and WTP Improvements in Reidsville is Setting the Stage for the Future Kevin Irby, P.E. Kevin Eason, P.E
SBSA.
Presentation transcript:

Genesee County Drain Commissioner Water and Waste Services Division District #3 Linden WWTP Digester Improvements Project, Phase I Joe Goergen, GCDC - WWS Tom Grant, HRC

Hubbell, Roth and Clark is assisting the Genesee County Drain Commissioner with improvements to the digesters at the Linden WWTP. Hubbell, Roth and Clark is assisting the Genesee County Drain Commissioner with improvements to the digesters at the Linden WWTP. The project includes: The project includes: Adding vortex mixing equipment to two anaerobic digesters Adding vortex mixing equipment to two anaerobic digesters Sludge and gas piping improvements Sludge and gas piping improvements Two new heat exchangers Two new heat exchangers Replacement of existing air actuated diaphragm pumps with new rotary lobe pumps. Replacement of existing air actuated diaphragm pumps with new rotary lobe pumps.INTRODUCTION

The approximate construction cost is $1.3 Million, which is being funded with an MDNRE SRF loan and 40% ARRA principal forgiveness. The approximate construction cost is $1.3 Million, which is being funded with an MDNRE SRF loan and 40% ARRA principal forgiveness. Mr. Matt Raysin, P.E., Division Engineer and Mr. Joe Goergen, Division Superintendent is overseeing the construction for the County. Mr. Matt Raysin, P.E., Division Engineer and Mr. Joe Goergen, Division Superintendent is overseeing the construction for the County. Also involved are Jeffrey Wright, Drain Commissioner, and John F. O’Brien, P.E., Director of Water and Waste Services. Also involved are Jeffrey Wright, Drain Commissioner, and John F. O’Brien, P.E., Director of Water and Waste Services. Sorensen-Gross Construction Services is the General Contractor. Sorensen-Gross Construction Services is the General Contractor. FUNDING AND COSTS

DISTRICT #3, LINDEN WWTP Plant was originally constructed in 1963 and provides influent pumping, primary settling, secondary treatment (activated sludge) and settling, and UV disinfection prior to discharge into the Shiawassee River. Plant was originally constructed in 1963 and provides influent pumping, primary settling, secondary treatment (activated sludge) and settling, and UV disinfection prior to discharge into the Shiawassee River. Currently is rated for 11 MGD average flow and 16 MGD peak flow. Currently is rated for 11 MGD average flow and 16 MGD peak flow. Solids handling facilities consist of anaerobic digesters for primary sludge, sludge thickening via dissolved air flotation (DAF) for secondary sludge, sludge storage vaults, and a loading station for hauling sludge off-site for land application and or landfill. Solids handling facilities consist of anaerobic digesters for primary sludge, sludge thickening via dissolved air flotation (DAF) for secondary sludge, sludge storage vaults, and a loading station for hauling sludge off-site for land application and or landfill.

Phase I Project Scope: Phase I Project Scope: Digesters: Digesters: New vortex mixing New vortex mixing Sludge and gas piping improvements Sludge and gas piping improvements Two new sludge-to-sludge heat exchangers Two new sludge-to-sludge heat exchangers Sludge pump replacements Sludge pump replacements New instrumentation and controls New instrumentation and controls BACKGROUND, PHASE I

Phase II Project Scope: Phase II Project Scope: Under consideration for increased energy efficiency and utilization without adding maintenance demands Under consideration for increased energy efficiency and utilization without adding maintenance demands BACKGROUND, PHASE II

DIGESTER MIXING The existing Primary Digester No. 1 gas mixing equipment did not efficiently mix the digester contents. The existing Primary Digester No. 1 gas mixing equipment did not efficiently mix the digester contents. The existing Primary Digester No. 2 was not equipped with any mixing. The existing Primary Digester No. 2 was not equipped with any mixing. The new vortex liquid mixing system improves the digesters’ operational efficiency, resulting in increased volatile solids destruction and gas generation. The new vortex liquid mixing system improves the digesters’ operational efficiency, resulting in increased volatile solids destruction and gas generation. The new system includes four jet nozzles and a 1,500 gpm centrifugal chopper pump at each digester. The new system includes four jet nozzles and a 1,500 gpm centrifugal chopper pump at each digester.

System selected was the Vaughan “Rotamix” System selected was the Vaughan “Rotamix” Multiple fixed nozzles allow effective mixing energy distribution without the need for rotating equipment. Multiple fixed nozzles allow effective mixing energy distribution without the need for rotating equipment. Can mix tanks after long periods of storage, and allows intermittent operation, reducing energy costs Can mix tanks after long periods of storage, and allows intermittent operation, reducing energy costs Chopper pumps reduce clogging problems due to fibrous material and other debris Chopper pumps reduce clogging problems due to fibrous material and other debris System operates without liquid level dependency System operates without liquid level dependency No scheduled nozzle maintenance required, and no rotating equipment within the process. No scheduled nozzle maintenance required, and no rotating equipment within the process. VORTEX MIXING SYSTEM

MIXING PUMP (CHOPPER)

The solids pumped from the Primary Clarifiers to the Digester No. 1 caused heat loss and occasional upsets due to the temperature differential. The solids pumped from the Primary Clarifiers to the Digester No. 1 caused heat loss and occasional upsets due to the temperature differential. Two new spiral heat exchangers now pre-warm the solids for better efficiency. Two new spiral heat exchangers now pre-warm the solids for better efficiency. Solids from Digester No. 1 pass through the heat exchanger as they are pumped to Digester No. 2 to warm the primary solids from the clarifiers. Solids from Digester No. 1 pass through the heat exchanger as they are pumped to Digester No. 2 to warm the primary solids from the clarifiers. A flow control valve is used to match the flow rates, keeping the level in Digester No. 1 tank constant. A flow control valve is used to match the flow rates, keeping the level in Digester No. 1 tank constant. TEMPERATURE MANAGEMENT

Project included two Alfa-Laval Spiral Heat Exchangers, each 150 gpm Project included two Alfa-Laval Spiral Heat Exchangers, each 150 gpm Utilizes a single channel that allows for fully counter-current flow. Channels are curved with uniform cross-section that causes a spiraling motion within the fluid. Utilizes a single channel that allows for fully counter-current flow. Channels are curved with uniform cross-section that causes a spiraling motion within the fluid. The spiraling motion keeps the fluid fully turbulent, keeping solids in suspension and produces a “self-cleaning” action. The spiraling motion keeps the fluid fully turbulent, keeping solids in suspension and produces a “self-cleaning” action. Side cover opens to expose entire surface. Side cover opens to expose entire surface. Images from Alfa-Laval SPIRAL HEAT EXCHANGERS

HEAT EXCHANGERS

PUMP REPLACEMENT Existing air diaphragm and “plunger” pumps that were beyond useful life were replaced with rotary lobe pumps Existing air diaphragm and “plunger” pumps that were beyond useful life were replaced with rotary lobe pumps Variable Frequency Drives (VFDs) were also added to some pumps to allow for more efficient operation Variable Frequency Drives (VFDs) were also added to some pumps to allow for more efficient operation

Project required significant planning and support from Plant personnel to ensure the day-to-day operation would not be impacted by the construction. Project required significant planning and support from Plant personnel to ensure the day-to-day operation would not be impacted by the construction. PROJECT COORDINATION

ADDITIONAL PHOTOS

Thank you!!! Thank you!!! Questions??? Questions???