Team 6 Eric Immerfall Elizabeth Smit Jordan Johnston Lisa Andela Aaron Goodman.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Sino-Africa Initiative Project Monitoring & Evaluation Final Exchange January 2014.
Click to edit Master text styles – Second level Third level – Fourth level » Fifth level Integrated Solutions for Hospitality Projects.
ECOLOGICAL ARCHITECTURE
Conduct of Operations – Operations Aspects of Unique Processes Photo of the Week Collider-Accelerator Department Take 5 for Safety.
Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial.
Groundwater Scenario Groundwater Scenario Major shifts in water management: Management of water resources – Individuals/Communities to State Harvest and.
Technology in Primary Schools (TiPS) Inc. KDC Built Environment Water Challenge 2009.
Team 6 Eric Immerfall Elizabeth Smit Jordan Johnston Lisa Andela Aaron Goodman.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
Team 13: All For Angkor Presentation #3 ENGR 340 March 3, 2006.
Best Management Practices for integration of water and fisheries resources in lowland ecosystems Kevin Fitzsimmons, Ph.D. Professor, University of Arizona.
This training was prepared by the U.S. Department of Agriculture (USDA) team of Sarah Librea-USDA Foreign Agricultural Service (Team Leader), Jon Fripp.
Kaj Jørgensen, Aalborg University, Department of Production and Jørn Skauge, School of Architecture Aarhus, Department of Architectural Design Building.
TEAM 6 Case for Cambodia Eric Immerfall Elizabeth Smit Jordan Johnston Lisa Andela Aaron Goodman.
SUSTAINABLE RESIDENTIAL DESIGN PROJECT SIKESTON HOUSE Project 12 DS 413 MAY 8 TH, 2012.
Dr. Hari J. Krishna, P.E. Texas Water Development Board Austin, Texas
WASH Standards. Emergency WASH Services/Standards Safe and Adequate Water: Sanitation Hygiene Pormotion Drainage Waste Management.
Bali Dream Gde Putra Paean Lee Lilith Shoemaker Loida Vasquez Sustainability, Buildings, and the Built Environment Spring 2014.
Project 3 DS 413: Design Studio 413 May 9, 2010.
1 ASEI Sanitation Project ‘A Vision For Change’ Presented at the 2008 ASEI Sanitation Symposium February 9, 2008 Sharanpal (Paul) Sikand Jayant (Jay) Patel.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Data Centre Design. PROJECT BRIEF Develop a low energy data centre for a major computing company. Building is to be a prime example of sustainable, low.
Water Treatment Management FOR Sustainable Industry
Key Aspects Afternoon Sun Morning Sun To Avon To Latimer Sheltered Area Afternoon Sun Morning Sun To Avon To Latimer Sheltered Area Relevant Site.
Team 6 Eric Immerfall Elizabeth Smit Jordan Johnston Lisa Andela Aaron Goodman.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Senior Citizen Living 1766 N Atherton St State College, PA EDSGN 100 Section 06 Erika Arrojado Cody Shustack Matthew Malencia Andrew Zaunegger.
Eric Immerfall Elizabeth Smit Jordan Johnston Lisa Andela Aaron Goodman.
Honduras 60 % Stephanie Chang Walter Li Greer Mackebee Janelle Barth.
CPS welcomes onto the market an excellent 3 bedroom, mid terraced property located in a ideal residential development. Comprising 3 Bedrooms, kitchen,
Copyright © by Holt, Rinehart and Winston. All rights reserved. ResourcesChapter menu Section 4 Using Water Wisely Bellringer While hiking, you realize.
Senior Design Project Et 493 Design of a Two-story Office/Apt For: Dr. Cris Koutsougeras Advisor: Mr. R.E. Rode Prepared by Joshua Price.
United Nations Workshop on Revision 3 of Principles and Recommendations for Population and Housing Censuses and Evaluation of Census Data, Amman 19 – 23.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Liberty Elementary: Preparing for the Future Building New Pre Construction Meeting.
CENE 386 Engineering Design: The Methods. Getting Ready to Get the Job Getting as much information as possible prior to making the proposal –Profile the.
PRI & BNV Retreat Hyderabad Presentation by D.K.Jain Jt. Secretary MGNREGA Divison, MoRD 22 nd Sept; 2012.
By Jaime Dorfman. WHEN PEOPLE USE WATER, THEY DON’T ALWAYS USE IT WISELY. SOME PEOPLE WASH THEIR HANDS WITH 2 TIMES THE AMOUNT OF WATER THAN THEY NEED!
Tiny House Marcia Morrison. House layout Loft areaMain floor.
All About Civil Engineers Career Information UNT in partnership with TEA, Copyright © All rights reserved.
Design Development Code analysis Partition types.
Private Sector  Buildings and structures built for ordinary people.
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
A house to Jesús Soto Venezuela, Well known Venezuelan artist who works in Kinetic Art style. Energy is one of the elements most eye-catching.
Architectural Drafting Mr. Higgins
A sustainable house By Ashleigh Towler. Down stairs garage Living room Bedroom 1 Laundry Kitchen/ dining room Bath entry.
COZYEON Residence Main facilities gallery. Corridor of each floor.
 Co-mixing: is the direct piping of human sewage into a manure storage basin.  Human Sewage: is defined as any waste from toilets, bathing, laundry,
RESIDENTIAL RAINWATER HARVESTING PROJECT ALTITUDE ENGINEERING, INC. PRESENTERS: HAYLIE BREWER, ERICA KIESOW,& BRETT HIGHTOWER DATE: APRIL 28 TH,
LIFE CYCLES OF AIKEN COUNTY PUBLIC SCHOOLS CONSTRUCTION PROJECT October 8, 2013.
Session 1: Identifying Construction Drawings and Drawing Components.
Mobile Unit Solutions:
Smart system for Waste water treatment management
Construction prodecure of Building
USDA -Natural Resources Conservation Service
TECHNICAL SPECIFICATION AND REQUIREMENTS
Shyamaghat Rainwater Model Project
Environmental Assessment
Smart system for Waste water treatment management
Commercial Building Project Portfolio
Pre-Contract Cost Control
UBSUP Technical Options
World Bank support to GoE’s Sanitation Marketing & Business Development Initiative Sirak Wondimu, Sanitation Marketing & Business Development Coordinator.
Decision making exercise
Dream of Rishabh Prasad of class 9thB
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Multi-Family Fourplex Apartment
Site Selection for Aquaculture
Senior Design Project Prepared for: Dr. Koutsegeras Advisor: E. Rode
Presentation transcript:

Team 6 Eric Immerfall Elizabeth Smit Jordan Johnston Lisa Andela Aaron Goodman

Design Norms Master Plan Layout Accomplishments and Decisions Obstacles What We Have Learned Questions

Cultural Appropriateness: Through the design, materials, and construction methods of the common Cambodian. Transparency: Communication about the simplicity and reliability of the design. Integrity: Design will facilitate relationships between people and their land. Design Norms Layout Accomplishments Obstacles Learned Questions

Well Solar Pump Fish Ponds Drip Irrigation Common Building Sanitary Facilities Design Norms Layout Accomplishments Obstacles Learned Questions Bridge

Computer model started in Revit Structure 2010 First and second floors and stairs input Model inserted into Civil 3D site plan Layout for first and second floor completed Design changed to a larger size Stairway designed Wrapping stair design Design Norms Layout Accomplishments Obstacles Learned Questions

2 nd Floor- 11 dorm rooms Tile roof, steel and concrete 1 st Floor- Classroom, kitchen, 3 full bathrooms Design Norms Layout Accomplishments Obstacles Learned Questions

3 bathrooms - sink, toilet, shower in each Design options - Stabilization Pond - Treatment - Latrine Pit - Septic Final Choice - Multiple Latrine Pits Design Norms Layout Accomplishments Obstacles Learned Questions

Shower Latrine Pit Toilet &Sink

Cross Sections made using data from site Design changed to include dam Dry season water supply Currently Modeling in HEC-RAS and HY – 8 to determine culvert sizes and amounts Design Norms Layout Accomplishments Obstacles Learned Questions

Area of Dam

Estimation of Power Demands Determined harvestable energy Initial determination of specific components Preliminary cost analysis of primary system  Annuity Payments approximately $2200/yr  Cost per KW-hour $1.00-$1.30 Design Norms Layout Accomplishments Obstacles Learned Questions

Changed to a multiple system design  2 to 3 systems: building electricity & water pumps Design Norms Layout Accomplishments Obstacles Learned Questions

Determining elevation change of the farm Drip irrigation system for veggie garden using waste fish water Storage behind dam to irrigate ESA in dry season Using AutoCAD Civil 3D for topography Design Norms Layout Accomplishments Obstacles Learned Questions

Obstacles Have Overcome Site Data Local vendors for system components Preliminary design Design Norms Layout Accomplishments Obstacles Learned Questions Obstacles to Overcome More modeling of designs Final master plan design

Keep units straight -metric Document everything Things change- be able to adapt We don’t know everything-make assumptions Getting started is half the battle- where to start Learned a lot about different aspects of site development Communication is key between group members Design Norms Layout Accomplishments Obstacles Learned Questions

Further questions… Special Thanks To: Prof DeRooy-Team Advisor Prof Dornbos-Biology Prof Rachel Koopman-Interim Data Coordinator Interim Group Roger Lamer-Industrial Consultant Navy Chann-Chhay & Li Chhay-Client Founders of Eden School of Agriculture Design Norms Layout Accomplishments Obstacles Learned Questions