Equitable Moorage Charges Pacific Coast Congress April 17, 2008 Paul Sorensen, principal, BST Associates.

Slides:



Advertisements
Similar presentations
Cost of Capital Chapter 13.
Advertisements

Deprecation.
Paying A Fair Rate. Notice Regarding New WATER & SEWER RATES  Council Meetings (Open Session) June 18, 2007 – Special Meeting June 18, 2007 – Special.
May 30, Meeting & Outreach efforts  February 27th – Proposed Compensation Plan Distributed to Joint Admin/WWOC  March 5th – Joint Admin/WWOC Meeting.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Changing Alaska's Oil and Gas Production Taxes: Issues and Consequences Matthew Berman Professor of Economics Institute of Social and Economic Research.
KINGWOOD UDGET PRESENTATION TOWNSHIP OF KINGWOOD 2012 BUDGET PRESENTATION.
1 Combined Utility System Cost of Service Rate Study Presentation April 6, 2010.
Copyright ©2004 Pearson Education, Inc. All rights reserved. Chapter 9 Purchasing and Financing a Home.
Project Earnings and Cash Flows 2/02/06. Investment decision revisited Acceptable projects are those that yield a return greater than the minimum acceptable.
1 Report of the Financial Affairs Committee of the Faculty Senate Paul Bolster, CBA - Finance and Insurance Jackie Isaacs, COE - Mechanical and Industrial.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
Funding Availability and Strategy for different types bank There is substantial variation among bank even in similar. The average small banks uses less.
Housing Rents 2012/13 Housing Briefing - 19 January 2012.
Financial Statement Analysis
CITY OF SANTA BARBARA Budget Overview APA Citizens Academy Paul Casey, Assistant City Administrator October 15, 2013.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Chapter 9 Introduction to Income-Producing Properties: Leases,
LOCAL GOVERNMENT INFRASTRUCTURE NEEDS vs DEVELOPMENT CHARGES.
Wilderness Rim Association Water Rate and Reserve Study Board Meeting April 23, 2014 Presented By: Chris Gonzalez, Project Manager.
BST Associates 1 Capital Investment & Business Planning Prepared for the 34 th PCC Annual Conference Vancouver, British Columbia April 18, 2008 By BST.
City of Lino Lakes, Minnesota Financing Plan Highlights Citizens’ Charter Review Task Force March 29,2007 Pavement Management Report Financing Plan Presenter:
What a Difference a Plan Makes Master Planning and Realignment of Marinas Pacific Coast Congress April 13, 2006 Julie Bassuk, AICP, partner, MAKERS Paul.
1 January 25, Nebraska Profile 2011 NEBRASKA PROFILE Ninth Edition  State, 8 Regions, 93 Counties, plus 18 Cities – Three Volumes  Demographic.
WHAT’S CHANGED POST THE FINANCIAL SUSTAINABILITY INQUIRY? FMG Seminar 27 March 2009 Presented by John Comrie.
City of Lino Lakes, Minnesota Financing Plan Highlights Citizens’ Charter Review Task Force May 15,2007 Pavement Management Report Financing Plan Presenter:
APPA’s Financial Planning for Municipals Mark Beauchamp, CPA, CMA, MBA September 27, 2005 Business & Finance Workshop.
Chapter 12 Inflation Effects.
Recommendations Recommendation 1: Regrade the ten classifications found to be 20 percent or more below market midpoint to be in alignment with the market.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASIBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Warren Reeve Duchac Accounting 26e Capital Investment Analysis 26 C H A P T E R human/iStock/360/Getty Images.
CITY COUNCIL WORKSHOP DECEMBER 14, Sec Review requirements. (a) The City Manager shall each fiscal year prepare a preliminary capital improvement.
NMA Report to City Council June 16, 2015 Presented to Newport Beach City Council 1.
Public Works 1 FY 2013 Sources and Uses. Public Works 2 FY 2013 Sources and Uses.
CITY COUNCIL WORKSHOP DECEMBER 21, Sec Review requirements. (a) The City Manager shall each fiscal year prepare a preliminary capital improvement.
It’s All About Space – Maximizing the “ F ” in your F&A Rate.
Reading Budgets. This presentation Explains how to read the budget tables in the February budget votes Explains how to read the budget tables in the annual.
Chapter 9 The Cost of Capital. Copyright ©2014 Pearson Education, Inc. All rights reserved.9-1 Learning Objectives 1.Understand the concepts underlying.
FY08 PARKING PERMIT FEE PROPOSAL November 20, 2006.
Bay Club Marina Reconstruction Coastal Commission Hearing December 15, 2010; Agenda Item W16b These materials have been provided to the Coastal Commission.
39 20 ^ SECRETS TO ACHIEVING FINANCIAL SELF SUFFICIENCY ^ SECRETS TO ACHIEVING FINANCIAL SELF SUFFICIENCY 15th International Conference on Business.
 The Business Environment  The Tax Environment  The Financial Environment.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
 Venture Capital and Startups. What is VC?  Money provided by investors to startup firms and small businesses with perceived long-term growth potential.
AMCTO Conference Water Financial Plan Benchmarking and Performance Indicators Watson & Associates Economists Ltd Andrew Grunda, CMA, MBA Dan Wilson, BBA,
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
ESOP Succession and Liquidity Strategies for Business Owners For financial professional use only. Not for distribution to the public.
City of Port Moody Draft Financial Plan Tuesday, February 26 th, 2013.
Kodiak Cash Flow Analysis June 7, 2016 Michelle Humphrey Presentation to Kodiak City Council.
City of Kodiak Harbor Rates. Harbor Rate Study Recommendations from Northern Economics – Option 1 ▫ 18.5% increase and increase based on Producer Price.
2018 Preliminary Tax Levy Preliminary tax levy must be certified to the County by end of September for property tax statements mailed in late November.
Cowlitz County, WA Accounting Function Review
Personal Finance Home Finance
City of Petersburg Water and Wastewater Rates
DISCUSSION OF THE FUTURE DEVELOPMENT OF THE YWCA BUILDING 78 N
THE MMCC BUDGET January 15, 2015.
Updates to the Traffic Reduction and Transportation Improvements Fee (TR/TIF) City Council July 24, 2017.
10 C Strategy Management of Capital Expenditures hapter
LAKE TAHOE BENCHMARKS CALIFORNIA STATE LANDS COMMISSION
Chapter 12 Inflation Effects.
BULK POTABLE WATER TARIFFS SETTING FORUM Raw Water Use Charges for 2018/19 Financial Year 18 October 2017.
City of Lebanon, Missouri Electric Department
Major Vaal River Consultation Meeting Raw Water Use Charges for 2017/18 Financial Year 12 September 2016.
Major Vaal River Consultation Meeting Raw Water Use Charges for 2017/18 Financial Year 12 September 2016.
Financial Appraisal of Project
Raw Water Use Charges for 2016/17 Financial Year
Major Vaal River Consultation Meeting Raw Water Use Charges for 2019/20 Financial Year 24 October 2018.
BULK POTABLE WATER TARIFFS SETTING FORUM Raw Water Use Charges for 2018/19 Financial Year 02 November 2017.
Preliminary “DRAFT” 2019 Projected Year End Highlights
Presentation transcript:

Equitable Moorage Charges Pacific Coast Congress April 17, 2008 Paul Sorensen, principal, BST Associates

2 Agenda for Rate Study Setting Marina Rates Procedures Process Q&A

3 BST Associates Qualifications Overall Experience 30 years of consulting experience, Focus on waterfront development Marina Master Plans: La Conner, Edmonds, John Wayne, Port Angeles Boat Haven, Port Townsend, Neah Bay (Makahs), Des Moines, Oak Harbor, Shilshole Bay, Jim Clark, Clover Island, Ketchikan, Pensacola (FL) et al Marina Rate Studies (~3,000 slips): Everett (North and South Basins, 12 th Street Marina) La Conner Cap Sante (Anacortes) Des Moines Port Orchard Bremerton Poulsbo

4 Tenant Perspective on Rates It's Tax Time, So Be Sure You Use "The Official IRS Approved Pencil Sharpener….“ Tenants feel about as good about rates as they do about taxes.

5 Owner’s Perspective on Rates Owners generally have no capital set aside for marina redevelopment. They also want to be friends with tenants and don’t want to fight annually over rates. This is good until the marina falls apart.

6 Consultant’s Perspective on Rates You have to raise rates but I understand: that you have long standing relationships and there are political consequences.

7 Rate Review Process Open – Participatory – Fact Based Advisory Committee  Public  Commission — Advisory Committee: Committee/Staff/Consultant — Public Meeting: Tenants/Staff/Consultant/Commission End Result – The “Work Product” Revised Rate Structure for the Marina Transition Plan from Current Rates to New Rates

8 Poulsbo Marina Rate Study The Port has a CIP estimated at $6-12 million. Existing revenues and borrowing capabilities are insufficient to pay for these improvements. Poulsbo Marina rates are at the low-end in Puget Sound. Need to consider a rate increase.

9 Alternative Rate Methodologies CPI Increase Apply CPI increase for your region Cost recovery or replacement Set rates to cover all O&M costs as well as annual costs to replace the marina Market based rates Set rates based on rates at competitive marinas

10 CPI Increase CPI assumes that rates are already at an appropriate level. This is usually not the case. In addition, annual O&M cost increases at marinas are usually higher than the CPI adjustment. CPI has been around 3%/yr, Marina O&M costs around 4-6%/yr, Construction index around 6-10%

11 Port of Poulsbo Marina Rate Trends P ermanent Moorage ($/Lin Ft/Mo)

12 Cost Replacement Good for tenants to see & understand the real costs of owning a marina. In some cases, it may result in rates that are above market. Based on square footage, taking into account the water area used by the boat. It is progressive in that, as the vessel becomes longer, the rate per foot lineal foot increases. It lays out a formula that is accepted when understood.

13 Market Rates Assumes that rates at competitive marinas are set properly and that annual changes cover changes in O&M costs. Used as a backup method for setting rates. Rates based upon where the marina fits in with competitive marinas (rate leader, upper quartile, average …) Phased in over a three to five year period Annual increases should fall within certain limitations

14 Reason for Square Foot Rates Converting to SF moorage will be for the purpose of INCREASING EQUITY within the marina. Smaller boats pay higher SF rates than longer boats when a flat lineal rate is applied Square foot rates mean the lineal rate increases as the boat length increases The market conditions are tighter for longer boats than for shorter boats Smaller boats are negatively impacted by lack of fishing opportunities Tighter market means that higher rates can be charged for longer boats but needs to consider market forces The SF rate structure is simple, straightforward, and easy to implement. For dry stack operations, a cubic foot method is preferred.

15 Square Footage Rate Basis Number of Boats per Acre of Water Area Source: California Department of Boating and Waterways (DBW), Division of Boating Facilities

16 Rent Comparison per Acre of Water The annual rent from 20 foot slips is nearly twice that from 80 foot slips per acre of water area. You only have so many acres of billable water area. There are business and equity reasons to establish progressive rates. Imperative to consider if you are considering a reconfiguration – you will lose revenue by going to longer slips if you have a flat rate.

17 Des Moines Marina Existing Covered Rates (SqFt)

18 Cost Replacement Approach O&M/G&A Direct operating and maintenance expenses General administrative allocations Adjust to next year based upon historical cost trends. Cost replacement values Annualize based on asset value and longevity of assets. Adjust to next year based upon construction cost index. Contingency Reserve (established as a % of asset value) Total cost to recover (add above three components) Divide by square feet of moorage space and by 12 to obtain $/SqFt/month Recommend a phase in process to allow tenants to adjust.

19 La Conner Marina Rates Increase between 2001 and 2006 Covered rates increased 20% to 71% over this time period Open rates increased 12% to 57% over this time period

20 La Conner Covered Slip – 40 feet SqFt rates June 2003 There are 65 slips in this category

21 La Conner Open Slip – 30 feet SqFt rates June 2003 There are 59 slips in this category

22 Rising Construction Costs (Source: US Bureau of Labor Statistics PPI) Construction costs were on a plateau from 1996 to Increased 30-50% since due to international competition. Steel Cement Flotation materials, etc New plateau or are we going higher? Designers expect 7%+ increases per year for foreseeable future. Putting significant pressure on marina finances because rates have not risen as rapidly.

23 Construction Costs Impact on Rates (Example - Covered Slips at Port Orchard Marina) Cost replacement rates annualize capital costs and build it into the rate base. Port Orchard rates indicate the effect from increased costs. Cost replacement rates are significantly above market rates. Economies of scale plays a role. Requires subsidy for marina construction.

24 Des Moines Covered Rates The existing rate was the current (2006) rate at the Des Moines Marina. The proposed rate was determined by a comparison with competitive marinas. The recommended rates are phased in over three years. As noted above, rates are increased at a minimum of 3% per year and a maximum of 13% per year. The compounding effect of phasing brings rates in year 3 slightly above proposed rates. This partially offsets lost revenue to the City from not raising rates to a competitive level within one year. It should be noted that the competitive rate for 20-foot slips is an anomaly, since there is only one other marina offering covered rates for slips of this length.

25 Amenities It is easier to sell rate increases to tenants if there are more amenities (like parking) but it really is the owner’s responsibility to create a sustainable financial model.

Equitable Moorage Charges Pacific Coast Congress April 17, 2008 THANK YOU! Paul Sorensen BST Associates (425)