STRATEGIC ACTION PROGRAM For the Binational Basin of the Bermejo River.

Slides:



Advertisements
Similar presentations
19-20 September 2013, IBGE, Rio de Janeiro, Brazil
Advertisements

WGP-AS UNDP/RBAS Water Governance Programme for Arab States (WGP-AS) NATIONAL CAPACITY NEEDS FOR THE EFFECTIVE JOINT MANAGEMENT OF SHARED WATER RESOURCES.
URUGUAY’s efforts to address synergies among the Conventions Workshop on synergies and cooperation with other conventions 2-4 July 2003 Espoo, Finland.
GEF S ÃO F RANCISCO. GEF S ÃO F RANCISCO Location.
La Plata River Basin Raquel Flinker. Climate Map (Source: 88% shared water resources 77% hydroelectric power.
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
TRINATIONAL COMMISSION OF PLAN TRIFINIO Plan Trifinio and the Shared Watershed of the Lempa River El Salvador, Guatemala and Honduras Mercedes Llort Trinational.
IWRM in EECCA countries Palle Lindgaard Jørgensen Technical Secretariat Helsinki, May 2007.
The GEF and the Private Sector IUCN, November , Washington D.C GEF Assembly, Punta del Este, Uruguay May 24, 2010.
REDUCING ENVIRONMENTAL STRESS IN THE YELLOW SEA (YSLME)
By Mohamed Al-Aawah Disaster Risk Reduction Programme UNESCO Cairo Office.
Improving the Energy Efficiency of the Heat and Hot Water Supply Presenter: Bayramgul Garabaeva, Programme Officer Decentralization and Community Development.
Building a global knowledge-sharing community “…. an innovative inter-institutional partnership to build a Web- based ‘knowledge community’ among transboundary.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS AND PROGRAMMES presented by Faizal Parish Regional/Central Focal Point GEF NGO.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool Alessandra Alfieri UNSD.
International Workshop on Institutional Capacity Development in Transboundary Basins, November 2008, Bonn, Germany Governance and Institutional Arrangements.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool and Suggested Structure for Assessment United Nations Statistics.
STRATEGIC ACTION PROGRAM For the Binational Basin of the Bermejo River.
Institutional Set-up and Staffing Arrangements for FNR_Rio Project in Afghanistan 26 January 2011 Mauritius.
IWRM PLAN PREPARED AND APPROVED. CONTENT Writing an IWRM plan The content of a plan Ensuring political and public participation Timeframe Who writes the.
In the Name of God, Most Gracious, Most Merciful.
9/10/2015A GLOBALLY COMPETITIVE AND PROSPEROUS KENYA Challenges on Climate Change Adaptation in Kenya.
The GEF in Mexico Integrating GEF Programmes and Strategies at Country Level Cape Town, August, 2006.
Europe & CIS Subregional Workshop: 7-8 March 2007, Istanbul, Turkey Enhancing National GEF Coordination, Communications and Outreach (Session 6): The Bulgarian.
IW:LEARN TDA/SAP Training Course Module 1: Introduction to the TDA/SAP Process.
Adressing Floods and Drought in GEF supported TDA/SAPs IWC-7 October 2013 Peter Bjornsen, UNEP-DHI Centre.
1 Capacity Building: Strategy and Action Plan GEF-UNDP Strategic Partnership Capacity Development Initiative.
Preliminary theory of change for the South China Sea Project Cluster Neeraj Negi Reference Group Meeting Bangkok, Thailand September 27, 2010.
STRATEGIC ACTION PROGRAMME (SAP) FOR THE INTERNATIONAL WATERS OF THE PACIFIC SMALL ISLAND DEVELOPING STATES A programme of the Governments of: Cook Islands,
1 Fabián Lozano Laboratorio de Sistemas de Información Georreferenciada, Centro de Calidad Ambiental, ITESM Campus Monterrey, Nuevo León, México Ordenamiento.
Egyptian Environmental Affairs Agency National Capacity Self Assessment (GEF/UNDP) The Third GEF Assembly Side Event – 30 th August,2006 Cape town Integrating.
1 Safe Use of Wastewater in Agriculture Dr. Jens Liebe, UNW-DPC.
E NVIRONMENTAL STATISTICS STATISTICS DIVISION Regional Strategy for the implementation of SEEA: key features and reflections for the Caribbean Regional.
A Framework for Sustainable Water Resources Management in the La Plata Basin, with Respect to the Hydrological Effects of Climatic Variability and Change.
Ministry of Regional Development and Public works Global Environment Facility United Nations Development Programme Integrating Global Environmental Issues.
“POLICY AND CHALLENGES ON ENVIRONMENT IN MONGOLIA – GEF COOPERATION” By J. Enkhsaikhan GEF Political Focal Point for Mongolia GEF Constituency Meeting.
Enver AKSOY, MSc Head of Strategy Development Board of MoFAL Policy approaches of Ministry of Food, Agriculture and Livestock to pasture management in.
Ministerul Mediului si Gospodaririi Apelor Session 6 - Enhancing National GEF Coordination, Communication and Outreach Developing the National Capacity.
Agenda 6.7- Exchanging Information and Creating Awareness in a Structured Basis between Peak Bodies 12 th Meeting AWGWRM Vietnam, 25 – 26 July 2012 Exec.
UNDP-GEF Dnipro Basin Environment Programme1. 2 Dnipro basin map.
1 LIFE+ COUNCIL WORKING GROUP 4 OCTOBER Discussion Points 1. LIFE+ in Context: Environment funding under the Financial Perspectives.
A programmatic approach to address transboundary water pollution The GEF Strategic Partnership for the Danube/Black Sea Emilia Battaglini, The World Bank.
Basin management plan Case Sibalom watershed, Philippines Marion Hermus Cornelia Rudolph Lennart Swinkels.
Integrated Coastal Management in the Baltic Sea A framework for better management of environment and resources Olof Linden World Maritime University.
River Basin Management in Southern Africa Barbara Schreiner.
GEF S ÃO F RANCISCO. GEF S ÃO F RANCISCO Location.
Follow up PDNA actions Chisinau, September 30, State Chancellery Government of Moldova.
IW:LEARN TDA/SAP Training Course Module 2: Development of the TDA.
GEF-Assisted Integrated Ecosystem Management Project In The Trans- Boundary Areas Between Nigeria and Niger Republic.
IWRM in GEF-Supported International Waters and their Transboundary Basins Dann M. Sklarew, Ph.D Director/Chief Technical.
SEL1 Implementing an assessment – the Process Session IV Lusaka, January M. Gonzales de Asis and F. Recanatini, WBI
Workshop and Steering Committee Meeting Globally-important Ingenious Agricultural Heritage Systems (GIAHS) Project Rome, 7-9 June 2004 Components and Processes.
European Commission Directorate General Environment Page 1 Regulation (EC) No 2152/2003 of the European Parliament and of the Council concerning monitoring.
The Guarani Aquifer Project: contributions for the groundwater resources management Luiz Amore GEF Third Biennial International Waters Conference. June,
1 Legal Frameworks for Public and Stakeholder Engagement by Carl Bruch Asia Regional Workshop on Stakeholder Engagement in International Waters Management.
PROCUENCA SAN JUAN Formulation of a Strategic Actions Program for the Integrated Management of the Hydrological Resources and Sustainable Development of.
3rd Biennial GEF IW Conference Brasil, June UNDP/GEF Danube Regional Project and Public Participation in the Transboundary River Basin Management.
Introduction to Environment. Environment : from the French word ‘environner ‘- to encircle or surround Whatever is around us constitutes our Environment.
Strategic Partnership for the Mediterranean Sea Large Marine Ecosystem Paul Mifsud UNEP/MAP Coordinator GEF 3 rd IWC - UNEP Session 24 th June, 2005.
Environmental protection of the Rio de la Plata and its Maritime Front: Pollution Prevention and Control and Restoration of Habitats PROJECT: RLA/99/G31.
Examples for the Engagement of high level policymakers to sustain project outcomes GEF IW LEARN Workshop Jamaica March 2014 Norbert Fenzl Maria Apostolova.
 Project for the Management and Restoration of Degraded Lands in the Groundnut Basin Republic of Senegal Ministry of Environment, Protection of Nature,
PROGRESS IN THE IMPLEMENTATION OF THE LVEMP-I & THE PREPARATION OF THE LVEMP-II PAPER PRESENTED AT THE GEF THIRD BIENNIAL INTERNATIONAL WATERS CONFERENCE.
Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem Russian Federation and Mongolia First year budget Dr. Sergey Kudelya.
Caspian Environment Programme (CEP) GEF 3rd Biannual International Waters Conference June Salvador.
Dr. Vladimir Mamaev UNDP Regional Technical Advisor Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem Russian Federation.
Preliminary theory of change for the South China Sea Project Cluster
IW:LEARN TDA/SAP Training Course
A Framework for Sustainable Water Resources Management in the La Plata Basin, with respect to the Hydrological effects of Climatic Variability and.
STRATEGIC ACTION PROGRAM for the BERMEJO RIVER BINATIONAL BASIN
Presentation transcript:

STRATEGIC ACTION PROGRAM For the Binational Basin of the Bermejo River

General Characteristics Location: –Bolivia: Departament of Tarija –Argentina: Provinces of Salta, Jujuy, Chaco and Formosa Watershed area: 123,162 Km2 River length: 1,300 Km Population: 1.2 million inhabitants Sediment charge: 8kg/m3 Total Discharge: 100 million tons/year (80% of the sediment load of the Plata River)

Eco-regiones Cuenca del Río Bermejo

Institutional Framework Binational Commission Project Steering Committee GEF- UNEP GS/OASBC Rep. Argentina BC Rep. Bolivia Nat. Director Argentina Nat. Director Bolivia Executing Unit Nat. Directors Tech.Coordinators OAS, UNEP Spec. Local & Intl. Consultants Support Personnel Stakeholders NGOs Academic comm.

Objectives Promote the sustainable development of the binacional basin of the Bermejo river Incorporating the environmental concerns into the national policies, plans and programs. Establishing a basin vision and integrated management of the natural resources, Promoting the establishment of regional coordination mechanisms and public participation and consultation

FORMULATION PHASE (august/1997 to october/2000) The first phase of the Bermejo SAP, called FORMULATION, was outlined to identify priority transboundary environmental problems and formulate a Strategic Action Program, with a focus based on the concept of binacional basin. In function to it, a work plan was designed centered in five main areas: –1. Elaboration of specific Basic Studies (22) –2. Formulation of projects (6) –3. Implementation of Demonstrative Pilot Projects(8) –4. Transboundary Diagnostic Analysis –5. Formulation of the Strategic Action Program

Finals Documents of the Formulation Phase The technical teams of Bolivia and Argentina formulated three documents that are the basis for the next stage of implementation of Bermejo SAP: –Transboundary Diagnostic Analysis (TDA) –Strategic Action Program, long term –Project Document (Project Brief), short term

TRANSBOUNDARY DIAGNOSTIC ANALYSIS SAP SHORT- TERM SAP LONG-TERM (20 years) 136 PROJECTS $US 470 MILLION SHORT TERM (4,5 years) 35 PROJECTS $US MILLION (w/GEF financing) catalyzes - ENDORSED/ W/STAKEHOLDER SUPPORT - ORIENTED TO RESOLVE PRIORITY PROBLEMS - CATALYZES IMPLEMENTATION OF LONG- TERM SAP LONG-TERM SAP SAP LOGIC STRUCTURE

Transboundery Diagnostic Analysis The Transboundary Diagnosis presents an identification and characterization of the main Transboundary Environmental Problems of the basin Each Environmental Problem has been characterized and evaluated, taking into account the following aspects: –· Symptoms and Effects –· Transboundary Manifestations –· Causes: Direct and Basic

Soil Degradation Floods and Other Natural Hazard Events Water Scarcity and Availability Restrictions Loss of Biodiversity and Biotic Resources Diminished Quality of Life and Endangered Cultural Resources  Destruction of vegetative cover by deforestation and overgrazing  Clearing of land for agricultural activities  Contamination by industrial and urban wastes  Water misuse and contamination by agricultural and livestock activities  Over-exploitation of forest resources  Uncontrolled fishing and hunting activities  Clearing of land for agriculture  Inadequate agricultural practices  Overgrazing  Pollution of water sources  Urban expansion in flood-susceptible areas  Agricultural activities in areas prone to flooding events  Destruction of vegetative cover  Unemployment and seasonal sub-employment  Deficient health, sanitation and education services.  Deficient political, legal, and institutional framework  Poor inter- jurisdictional planning and coordination  Inadequate community awareness, knowledge, and participation in sustainable resource management  Deficient financial and support mechanisms  Inadequate access to and application of sustainable technologies Figure 1. CAUSAL CHAIN RELATIONSHIP FOR PRIORITY ENVIRONMENTAL PROBLEMS Direct Causes (human origin) Environmental Problems Water Resource Degradation  Rainfall seasonality  Reduced water availability in the dry season  High sediment load and fluviomorfologic dynamics  High groundwater salinity contents Adverse natural conditions (soil, topography, geology, climate)  Extreme river highflows  Extreme climatic events  Inadequate water infrastructure  Depletion of groundwater supplies Common Basic Causes Direct Causes (natural origin)

Strategic Action Program - Long Term This document is the main product of the SAP first phase; it describes the group of high-priority actions that both countries have coincided in identifying as necessary to address the main environmental problems It also establishes the institutional framework and it determines the financing needs for the selected projects. STRATEGIC ACTION AREAS: - Soil Degradation - Water Scarcity and Use Restrictions - Water Resource Degradation - Loss Of Biodiversity And Biotic Resources - Floods And Other Natural Hazard Events - Diminished Quality Of Life and Endangered Cultural Resources

EFFECTS/ SYMPTOMS ENVIRONMENTAL PROBLEMS TRANSBOUNDARY MANIFESTATIONS DIRECT CAUSES COMMON BASIC CAUSES SPECIFIC BASIC CAUSES STRATEGICACTIONSSTRATEGICACTIONS PROJECTSPROJECTS TDA SAP IDENTIFICATION OF CAUSE-CHAIN RELATIONSHIPS

Project Document (project brief), short term The Project Brief is the beginning of the SAP implementation phase, it is conformed by studies, demonstrative projects and institutional actions, of short term, that on the whole represent the catalytic instrument for the implementation of the long term Strategic Action Program. The financing requested was approved by the GEF Council at the beginning of November/2000. Financing: –GEF: $US millions –Governments: $US 8.43 millions This Implementation Phase began on June/2001, it will have a 4.5 year duration. The components of the project have been selected to develop incremental activities and they have a character of support the efforts of the regional, national and binational institutions and in the implementation of the long term SAP

Development of Basin Institution Institutional Strenghthening of the Binational Commission Legal framework and implementation of economic instruments Donor Roundtable Meeting Planning System Integrated Managment Program of Water Resources Information System Environmental Education and Awareness Public Participation Pilot Projects Soil management and Erosion Control Sustainable Development of Natural Resources Consolidation of Protected Areas Protection and rehabilitation of water quality. Carbon Fixation. Basic Studies - Land-use planning. – Studies on Nat.Res., – Biodiversity and Water Resources. –Consolidation of Protected Areas. IMPLEMENTATION OF LONG-TERM SAP $us. 470 million 136 projects SHORT-TERM SAP STRATEGIC FRAMEWORK

Public Participation Besides being a specific activity of the program, the Public Participation is a work philosophy and an important component that gives support to the Bermejo SAP. Diversity of social actors: government's institutions (national, subnationals and municipal), academic,NGOs, producers organizations and the projects beneficiaries. In the elaboration of the Transboundary Diagnostic Analysis participated more than 30 institutions and 260 specialists of different disciplines More than a thousand people have contributed with their time and ideas during the different phases of the program Participation Mechanisms: seminars and workshops, intergovernmental working group, work meetings, modern mechanism of communication (electronic mail, WEB page), interviews, surveys and community works

SAP Formulation Methodology

NUMBERS OF THE PUBLIC PARTICIPATION Workshop and Seminars: 12 - Argentina 4 - Bolivia: 8 Participants: Participation of institutions in the work program elements of the Formulation Phase: 30 Contracts executed during the SAP Formulation Phase: - Experts/consultants: 80 - Institutions: 20 - Construction companies: 4 Participation of Specialist and Technicians: 260 Compilation of plans, programs and projects for the SAP: 260

Lessons Learned TDA/SAP process proved vital in the determination of priorities, identification of needed actions, and establishment of basin-wide, cross-sectoral support. Active stakeholder participation and information sharing are critical elements for sustainable natural resource management (pilot demonstration projects are essential component) The combined work carried out among technical teams, in km. of distance, with divergent points of view and priorities, and the coordination with Washington DC and Nairobi The wide public participation Incorporation of local agencies and organizations into most project activities to the largest degree possible.

Lessons Learned Regional Workshops have obtained by far the best response in terms of accumulated total number of participants (over 1000) that developed a very active participation in plenary and group activities during the meetings. Frequent and wide dissemination of Project information, progress and outputs has been welcomed by the recipients in the basin. However it was rather low the number of those who acknowledge receipt formally or provided comments or suggestions on the material. The same happened with the Web Site Forum. On the contrary, personalized interaction with a limited number of persons, as in the case of the Governmental Working Group established in Argentina integrated by representatives of the provincial governments, succeeds better in configuring a permanent consultation mechanism.

DEMONSTRATIVE PILOT PROJECTS

SEDIMENT CONTROL IN THE TOLOMOSA RIVER 31 GABIONS DIKES BUILTS IN 1998

SEDIMENT CONTROL IN THE TOLOMOSA RIVER 11 EARTHEN DIKES BUILTS IN 1998

USES OF STORED WATER FOR AGRICULTURAL

Environmental Education (Formosa)

SUSTAINABLE DEVELOPMENT IN YUNGAS

PUBLIC PARTICIPATION

IV workshop for the SAP Formulation (05/13/99).

Workshop for the SAP Formulation

Meetings with Stakeholders

Community Work –Meeting with stakeholders