Activités mécaniques 17 septembre 2013 D. Laporte F. De Matos / Y. Orain / P. Ghislain Atlas / SLHC.

Slides:



Advertisements
Similar presentations
IBL Insertable B-Layer
Advertisements

MPP für Physik München Sven.Vogt Tel.: IBL CO2 cooling meeting Junction box Manifold box Bart Verlaat,Jan.
Institut für Verbundwerkstoffe GmbH Erwin-Schrödinger-Str Kaiserslautern Germany 1© Institut für Verbundwerkstoffe GmbH, N.
IBL Brazing Study April the 20 th 2012 Eric Vigeolas.
Saga of the IBL Staves Franck Cadoux on behalf of the ATLAS IBL engineering team (and Eric Vigeolas in particular)
31 août 2011 Didier Laporte – LPNHE Paris 1 IBL Integration Stave Review Université de Genève.
IBL and SLHC activities at LPNHE Paris – 2013 Réunion Atlas France - 10 octobre 2012.
CO2 cooling and IBL interface meeting Tooling cooling line at PP1 Didier Laporte CNRS – LPNHE Paris 06 février 2014 EDMS IN2P3 : I – V2.
LHCb-VELO evaporator CoBra Calculation and feed through ideas. 18 February 2015 Bart Verlaat 1.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Training for cAreer deveLopment in high-radiation ENvironment Technologies 1 Work Package 4 New mechanical integration methods November 20 th, 2013 Franck.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.
1 Denis Grondin – Sept.23 TH, 2010 Cooling & mechanics status CALICE Collaboration Casablanca at LPSC ECAL.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Tracker Support Tube Tracker EDR November 15th/16th 2000 M.Oriunno CERN/EP Tracker Support Tube Marco Oriunno CERN/EP Division on behalf of Tracker Integration.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Mechanics and Cooling of Pixel Detectors Pixel2000 Conference Genoa, June 5th 2000 M.Olcese CERN/INFN-Genoa.
ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report October 11, 2001 N. Hartman, E. Anderssen,
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Back up stave test program status Eric VIGEOLAS Pixel week December 2000 Pre production status Assembling phase comments Geometrical control Stave Qualification.
ATLAS Pixel Detector Service Quarter Panel Update And PP1 Work July 4, 2006 Pixel Integration Meeting M Cepeda, S Dardin, K Kennedy, R Post, M Pereira,
Shenzhen CIT Electronics Material Co.,Ltd Section Ⅲ. Die cut and Kiss cut For film coating and film lamiation product, refer to Section Ⅰ and Ⅱ.
C 3 F 8 detection in N 2 pixel volume environment Rusty Boyd, Martin Doubek, Jan Godlewski Greg Hallewell Sasha Rozanov,Vic Vacek ATLAS ID Sonar Coolant.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
Procedure and Materials Photo Story By: Chloe Zimmerman and Maggie Carman.
Ideas for LC mechanics (we will work on sensors as well – particular CMOS)
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
IBL cooling branch layout and commisioning 6 febryuary 2014 Jan Godlewski, Bart Verlaat, Tomasz Blaszczyk, Eric Richards, Lukasz Zwalinski, Sven Vogt,
MICDS C AN C HALLENGE 2011 Madison Wrobley and Isabella Kendall.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
IBL CO 2 cooling flexible transfer integration into IDEP 24 July 2013 Jan Godlewski, Bart Verlaat, Siegfried Wenig, Nicolas Massol, Tomasz Blaszczyk 1.
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Pierre Barroca ITK LAPP – Goals 2.Simulation 3.Prototype measurements 4.Setup 5.Results 6.Conclusions 1.Goals 2.Simulation 3.Prototype measurements.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the.
High Granularity Calorimeters LLR – Feb 2-3 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling 1.Design of the EM end-caps.
1 IST development status  Seattle  Composite Design.
EC: 7 DISK concept Preliminary considerations
IBL project for DT Science-Techno Tea
How to create an Indico Meeting
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
LPNHE-CPPM 28 juillet 2006 A.Rozanov
SiD Solenoid Status and Plans
Flexible lines assembly
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Barrel stave allocation on the PP0 exhaust fitting
Detector Technology Group
Advantages and Challenges of this design Today status of the design
Presentation transcript:

Activités mécaniques 17 septembre 2013 D. Laporte F. De Matos / Y. Orain / P. Ghislain Atlas / SLHC

Modélisation calorimètre – Barrel – Endcap C&D – Présampler – Analyse X0 : Barrel : finie Présampler : finie Endcap C : 95 % Endcap D :

Coldchuck Cf mail de filipe du 06 juin (poster)

IBL : loading at SR1

IBL central ring (100% Made in LPNHE) 2 pièces  7 Pièces Matière : PEEK  PAI (Polyamide-imide) 1,2 gramme

IBL Fitting

IBL piping To help LAPP team (IN2P3) – Design tools to protect transfert lines – Date : end of 2013 to june 2014

Stiff tubes (14mm OD) Flexible tubes (18mm OD) Foam box with vacuum terminal and concentric split Routing in IDEP Side C. 14x 3mm OD tubes bundled in insulation 13mm bundle diameter + 13mm insulation (40mm OD) Designed by Eric Richards, Atlas PO

Routing in IDEP Side A. Stiff tubes (14mm OD) Flexible tubes (18mm OD) Foam box with vacuum terminal and concentric split 14x 3mm OD tubes bundled in insulation 13mm bundle diameter + 13mm insulation (40mm OD) Designed by Eric Richards, Atlas PO

Ca 90 cm IBL Vacuum lines Bundle wrapped in aluminum tape with 13mm insulation thickness (2x13+14=50mmOD) IDEP CAD integration: Erik Richards Vacuum terminals and concentric splitting in IDEP Flattened out tubes in between 25mm foam plates compressed by plates and stand-offs

Banc test : – Circuit Glycol + water -> CO² ? – Thermal mockup ? X0 : – contact with CMS at CERN Design / simulation – Cartigny (with CPPM) : a new pixel with IBL staves to 2020 – New design :? – A lot of ideas : Next