Obviously, water resistance is the main attribute. However, flashing should also be: Durable and resistant to damage during installation. Resistant to.

Slides:



Advertisements
Similar presentations
Exterior Window and Door Frames
Advertisements

Common Components of a Traditional Wood Framed Building
Copyright , Facade Works Inc - Drained/Back-Ventilated Rain Screen System.
Unit 55 Roof Finish Roof Overhangs and Cornices • Open Cornices • Closed Cornices • Cornice Soffit Systems • Covering Roofs • Asphalt Shingles • Wood Shingles.
A Technical Review of Proper Masonry Detailing
Finishes many options Walls wood shakes, shingles, board & batten (vertical), plank lap (horizontal), T1-11 ply, vinyl, fiber cement, aluminum, stucco.&
Chapter 8: Duct Design and Sealing To be used with the Guide to Building Energy Efficient Homes in Kentucky.
“Sustainable Building Systems and Construction For Designers” Chapter 7: Walls.
Designing Cladding systems
Building Code – Flashing Changes & Challenges Builder Breakfast and Luncheon Series Presented by:
CHAPTER 9 Thermal & Moisture Protection
WALTER SCARBOROUGH CSI CCS CCCA SCIP AIA D+D Specifiers Series Sponsored by Air Barriers.
DESIGNING WITH CURTAINWALL AND STOREFRONT
11. MASONRY LOADBEARING WALL CONSTRUCTION
Chapter 20 Cladding with Masonry & Concrete
Firestone Building Products EPDM Training. Membrane Attachment.
Objectives : ANALYZE home maintenance techniques.
Wood Frame Construction Common Components of a Traditional Wood Framed Building Gateway – Unit 7 – Green Architecture © 2012 Project Lead The Way, Inc.Green.
INTERIOR WALL FINISHES
Chapter 4: Air Leakage Control: Materials and Techniques
Topic C1 Superstructures - walls
Building science.
CRACK CONTROL IN CONCRETE MASONRY WALLS
Principles of Joints & Sealants Chapter 9. Mehta, Scarborough, and Armpriest : Building Construction: Principles, Materials, and Systems © 2008 Pearson.
SELECTION AND INSTALLATION OF BRIDGE EXPANSION JOINTS
Metals. Introduction u Metal is used in various places in the construction process including: –rebar = reinforcing steel in round shapes –flashing = thin.
ARCH-432 Vapor Retarders and Air Barriers Attendance In what modern day country was the first cavity wall developed and used? For what purpose? A. Spain.
Part 2: Buildings as a System Lee F. Ball Jr., PhD
Proudly presents. At the conclusion of this course, participants should understand the following: General design methods for masonry construction that.
Products & Accessories Details System Highlights Hands On
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Common Components of a Traditional Wood Framed Building
Air/vapor barrier systems must be compatible with flashings not only from a material standpoint but also from an installation method.. An AIA Accredited.
Residential Construction Unit 4- Window and Doors Mr. Todzia.
Air Leakage and Water Vapor Control Chapter 6. Mehta, Scarborough, and Armpriest : Building Construction: Principles, Materials, and Systems © 2008 Pearson.
1 Energy Efficient Housing. 2 Why construct energy efficient structures? Bottom Line !!! Money It may save up to 60% of the cost to heat/cool the structure.
SELECTING INSULATION MATERIALS  Insulation can serve as more than just an energy barrier, providing fire resistance, humidity control, and noise reduction.
9.02 Exterior Maintenance and Cleaning. Roof, Gutters, Downspouts Check roof for leaves and twigs as they contribute excess moisture that can cause rot.
THERMOSETTING PLASTICS
The Ins and Outs of Metal Rainscreen Wall Systems
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
TOTAL PROTECTION. TOTAL CONFIDENCE. Owens Corning ® Total Protection Roofing System ®^
APPLICATIONS OF TECHNOLOGY
Exterior Maintenance and Cleaning
Common Components of a Traditional Wood Framed Building
Warm-up 9/20/16 What is the underlayment called below the shingles?
Common Components of a Traditional Wood Framed Building
OBJ: SWBAT create a CAD Rendering of a Utility shed.
APPLICATIONS OF TECHNOLOGY
Competency: Draw roof plans
Gaskets and Packing An introduction to Gaskets Packing
Wood Frame Systems Civil Engineering and Architecture®
Competency: Draw roof plans
Objectives : ANALYZE home maintenance techniques
Different from welding: 1-no diffusion takes place 2-filler metal is used to produce a strong bond 3- require lower temperatures than fusion welding.
Warm-up 9/19/16 What template are we using?
Wall Openings You will learn about the types and function of wall openings. You will learn about the components parts of each opening and why they are.
Chapter 10 Construction Basics.
Interior Finishes and Detailing
Thank you to our Sponsors
Common Components of a Traditional Wood Framed Building
Details These are drawings of specific elements where the designer wants to provide more detailed information than can be seen in the larger drawings.
Common Components of a Traditional Wood Framed Building
Competency: Draw roof plans
Competency: Draw roof plans
Common Components of a Traditional Wood Framed Building
Exterior Maintenance and Cleaning
Common Components of a Traditional Wood Framed Building
Presentation transcript:

Obviously, water resistance is the main attribute. However, flashing should also be: Durable and resistant to damage during installation. Resistant to puncturing or tearing. Easily formed into desired shapes. Other Considerations: Resistance to ultraviolet light must be evaluated during flashing selection. Flashing material should not be susceptible to corrosion in fresh mortar or react with other adjacent materials such as rigid insulation. Compatibility with materials such as sealants or adhesives must be reviewed. The minimum expected life of the the flashing materials should be the anticipated life of the structure Flashing Facts Flashings must possess certain physical properties.

Flashing “Install-ability”

SHEET METALSADVANTAGESDISADVANTAGES Stainless SteelDurable, Impervious, HardDifficult to bend High installation costs Must be preformed at factory Not easily field-adapted Usually requires steel workers for installation Cold-rolled Copper,Durable, flexible, impervious,Cold-rolled stains surfaces Lead-coated Coppereasier to form and solder thanwhere water runs off; damaged stainless; Lead-coated doesby excessive flexing; Copper not staincorrodes and leads to gradual change in surface color COST: $ $ PER SQ. FT Flashing Comparisons

COMPOSITESADVANTAGESDISADVANTAGES Copper LaminationsEasier to form and joinMore easily torn than metal, than metals.asphalt degrades in sunlight and can ooze under extreme heat COST: $ $ 8.00 PER SQ. FT Flashing Comparisons

TYPEADVANTAGESDISADVANTAGES EPDMNot susceptible to UV rays,Requires adhesives to bond to substrate Corrosion resistant, Goodand requires double sided tape to seal laps, Tear and puncture resistance More difficult to work with than rubberized asphalt, resulting in higher labor costs RubberizedFlexible at low temperaturesAffected by UV rays Asphalt FlashingExcellent tear/punctureCannot form 45 degree drip edge System resistance; self seals aroundLoses adhesive properties below 40 degrees stainless steel drip edge;Rubberized-asphalt component can ooze easy to installout to the exterior of the building in warm temperatures. COST: $ $ 5.00 PER SQ. FT (including drip edge) COST: $ $ 5.00 PER SQ. FT TYPEADVANTAGESDISADVANTAGES Elvaloy ® MembraneFlexible at low temperatures.N/A Not susceptible to UV. Self-adhesive, easy to install, seamless preformed corners and end dams available. Extremely tough: excellent impact and tear/puncture resistance. Highly resistant to oils and will repel most chemicals Compatible with most silicone and urethane sealants. Suitable for thru-wall or surface- mount construction. *Elvaloy® is a registered trademark of the DuPont Company COST: $ $ 6.00 PER SQ. FT (with drip edge) $ $ 5.00 PER SQ. FT (without drip edge)

Flashing “DROOL”

Stainless Steel and Copper Flashing Accessories OUTSIDE CORNER INSIDE CORNER END DAM

Flashing Locations AT SHELF ANGLES AT SILLS OVER OPENINGS AT ROOF/WALL INTERSECTIONS UNDER COPINGS AT WALL BASE

Recommended to ensure that the top edge of the flashing will remain attached to the back-up Termination Bar Sealant Term Bar Foam Seal Flashing Used at the top of flashing to mechanically secure to back-up wall. Type 304 Stainless Steel 9/32” holes spaced 8” o.c. Size 1/8” x 1” x 96”

Drip Plates Drip Plates are recommended by the BIA for flashings that cannot be exposed to UV Meets BIA requirements of extending ¼” beyond face of wall forming a drip. Available in stainless steel and copper. *Compatible with Clear Adhesive Flashings ONLY Flash-Adhere Strip (w/release paper) for precise and permanent placement of flashing Compressible filler adhered to the bottom of drip plate acts as a bond break and helps prevent air and moisture infiltration.

Mortar Collection Device Must suspend mortar at two distinct heights

Plastic Tubes – 16” OC Cotton Cords/Wicks – 16” OC Honeycomb Plastic – 24” OC Aluminum Vent – 24” OC Synthetic Mesh – 24” OC Open Head Joint – 24” OC Vents at the top of the cavity can dramatically increase air ventilation to improve drainage. *Compatible with Clear Adhesive Flashings ONLY Weeps and Vents Weep vents allow for proper drainage and ventilation helping to keep wall cavities dry and clear of debris

DEFINING AIR BARRIERS vs. VAPOR BARRIERS There are two ways for moisture to infiltrate the building envelope. 1.Diffuse flow is a gaseous vapor that passes through all materials. 2.Channel flow is a more serious concern, resulting from breaches in the building envelope. Channel Flow Diffuse Flow

DEFINING AIR BARRIERS vs. VAPOR BARRIERS  An air barrier MUST resist air leakage or channel flow at all pressure levels through the wall assembly.  A vapor barrier MUST resist the movement of vapor through diffusion.  NOT ALL AIR BARRIERS ARE VAPOR BARRIERS Channel Flow Diffuse Flow

DEFINING AIR BARRIERS vs. VAPOR BARRIERS Air barriers or permeable membranes allow the wall to “breathe” and offer designers more flexibility in their placement within the wall assembly. The ability to make the barrier system totally continuous should be the main criteria for the location. Channel Flow Diffuse Flow

DEFINING AIR BARRIERS vs. VAPOR BARRIERS Vapor barriers or non- permeable membranes have a specific location within the wall. Vapor barriers MUST be completely continuous to properly perform their function. Channel Flow Diffuse Flow

DETAILING AIR/VAPOR BARRIER INTEGRATION Intersections of different materials, expansion joints, elevation changes, inside & outside corners, and door & window openings are some areas/situations that require detailing in an air/vapor barrier system.

INSTALLATION KEYS TO A SUCCESSFUL AIR/VAPOR BARRIER The detail between an air/vapor barrier and the roofing system is critical. CONTINUITY WITH THE ROOFING SYSTEM

ANCHORING SYSTEM COMPATIBILITY KEYS TO A SUCCESSFUL AIR/VAPOR BARRIER Does the anchoring system protect the integrity of the air/vapor barrier and does the air/vapor barrier seal around the anchoring system?

COMPARISON LIQUID VS. SHEET MATERIALS Wall SystemLiquidSheet Steel/Sheathing ✔✔ Concrete/ICF ✔✔ CMU ✔✖

CONTRACTORS INSTALLATION AND EDUCATION Be sure to use a company with personnel trained/certified for installing air barrier systems. A pre-installation jobsite meeting is recommended to go over specific project requirements.

COMPATIBILITY

Building Envelope Summary  Flashings must work as a system and include all components such as termination bar, drip plates, mortar collection device, weeps/vents, etc.  User-friendly flashing systems for field personnel are important  Air/Vapor barriers MUST be totally continuous and be able to tie into adjacent building components via proper detailing.  Breathable vs. Non-breathable?

HOHMANN AND BARNARD, INC. 30 RASONS CT. HAUPPAUGE, NY p: f: e: CHRIS BUPP p: