1 www.jse.co.za Copyright© JSE Limited 2009 www.jse.co.za JSE Equities - Moving to T+3 21 October 2010 London.

Slides:



Advertisements
Similar presentations
______________________________________________________________________________________________________________________ To promote market transparency,
Advertisements

Copyright© 2003 John Wiley and Sons, Inc. Power Point Slides for: Financial Institutions, Markets, and Money, 8 th Edition Authors: Kidwell, Blackwell,
Funding Authorization and Certificate of Expenditures
Dubai Financial Market
Central Registration Department
ISDA ® The New CDS Landscape Auction Settlement International Swaps and Derivatives Association, Inc. ISDA ® Copyright © 2009 International Swaps and Derivatives.
The move to T+3 Brett Kotze. T+3 Project Market Communication CONTEXT Global best practice - shorter settlement cycles have been around for decades Original.
Transfer from primary to secondary school September 2014 Secondary School Admissions 2014.
Copyright© JSE Limited Brett Kotze Clearing & Settlement Division 08 February 2010 The move to T+3 1.
Applying Auction Settlement to Restructuring Credit Events December 2, 2010.
Hannes Van Eeden, Head of Finance and Company Secretary October 9,2007.
Dividends, Dividend Policy and Stock Splits Understand the formal process for paying dividends and differentiate between the most common types.
DTCC Deriv/SERV ACSDA Leadership Forum Michael Velleca, Vice President, Deriv/Serv October 8, 2007.
Chapter 3 Project Initiation
MAIN PREMISES TO THE FINANCIAL SECURITY RULES USED BY THE GAS TRANSMISSION OPERATOR GAZ-SYSTEM S.A. IN TRANSMISSION CONTRACTS AND NETWORK CONNECTION AGREEMENTS.
IMASA 21 October Terms and Definitions Member Settled Client:- A client that holds their assets, cash and securities, with a trading member. Non-member.
Employment and Support Allowance Information Pack
5/25/ Introduction  SLB is defined as the temporary exchange of securities with an obligation to redeliver the same securities in the same number.
AMEDA Conference Mauritius PRESENTED BY: Monica Singer, CEO DATE: May 2008.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
HR/Payroll Modernization Update
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
1 GETTING PAID BY YOUR FOREIGN BUYER Presented By Nellie Smith Vice President Global Trade Services.
Copyright© JSE Limited JSE – Africa’s premier exchange Noah Greenhill Senior General Manager: Marketing, JSE Ltd 4 March 2008 Mine Africa.
Structured Transaction Overview. FDIC serves as an equity partner in its Receivership capacity for a single or multiple institution transaction. Joint.
Back Office Structure and functions April Table of Contents Back office structure and functions (Benoit Schaus) Sourcing (André Vandencamp) Outsourcing.
ACSDA Seminar Next Challenges in Depository, Clearance and Settlement Services - CCP Opportunities - Margarida Baptista November 15, 2002.
Clearing and Settlement of spot bonds 03 February 2005 Brett Kotze.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
User Group Priorities for Development. Assumptions ER system still remains in place –Capture individual user input –Repository of good ideas that will.
Market Information Seminar 12 October 2004 Allan Thomson.
Copyright© JSE Limited ROLLING OF SETTLEMENT AND FAILED TRADE PROCEDURES Brett Kotze Clearing & Settlement Division 05 August 2008.
Initial considerations for the project start-up Joint Operational Programme “Black Sea Basin ” Bucharest, 18th of September 2013 Laura Bobârnac,
1 Copyright© JSE Limited The JSE – 125 years of history and progress 29 August 2012, by Monica Ambrosi.
1 Introduction of Trading, Clearing and Settlement of Futures Contracts in Mauritius Steve Leung Sock Ping Chairman Central Depository & Settlement Co.
© 2012 Foley Hoag LLP. All Rights Reserved. Legal Issues for Start-ups: Seed Financing Presentation to Boston ENET December 4, 2012 Matt Eckert
Update on e-Placement at Aon Ian Summers. Aon Limited is authorised and regulated by the Financial Services Authority in respect of insurance mediation.
Chapter 5 Charles P. Jones, Investments: Analysis and Management, Twelfth Edition, John Wiley & Sons 5- 1.
The move to T+3 Phase 3 Brett Kotze & Chris Grove.
Implementation of the Market Standards for Corporate Actions and General Meetings in the activities of the Central Depository AD Vasil Golemanski 25 September.
Introducing Project Management Update December 2011.
EALIC European Association of Listed Companies AISBL-IVZW Harmonisation of Corporate Actions Processing in Europe Giovannini Barrier 3: "Harmonize national.
Gas Forum Proposed Process for UNC Modification Panel & Committee Elections.
NEW BUSINESS ASSOCIATION between the JSE Securities Exchange South Africa and London Stock Exchange.
CHAPTER 11 FUTURES, FORWARDS, SWAPS, AND OPTIONS MARKETS.
© 2007 Railinc. All rights reserved. The Railroad Clearinghouse Jim Pinson November 10, 2010 Tempe, AZ.
IGGIGG Industry Governance Group Secretariat: RMDS Secretariat: RMDS 1 IGG Agenda – July 19 th 2007 Minutes from last IGG meeting10.00.
1 Advanced Accounting Autumn 2015 Chapter 12 Part I Bill Myer – Autumn 2015.
Topic 6 Managing stage boundaries
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
RECAP LAST CLASS. FINANCIAL SECURITIES & MARKETS DEBENTURE A DEBENTURE ALSO CALLED A NOTE IS AN UNSECURED CORPORATE BOND OR A CORPORATE BOND THAT DOES.
Copyright © 2005 JSE Limited Presentation on JSE LIMITED to ASEA CONFERENCE 10 th – 12 th September 2005 By Geoff Rothschild Director Marketing – JSE Limited.
1. Securities Lending and Borrowing (SLB) Introduction  SLB is defined as the temporary exchange of securities with an obligation to redeliver the same.
THE JSE SECURITIES EXCHANGE CLEARING AND SETTLEMENT 8 May 2003.
DEPOSITORY MODEL AND ISSUER SERVICES PROVIDED BY KSEI Dhaka, July 3, 2009.
Update on ECSDA Activities San Salvador March 2006 European Central Securities Depositories Association ECSDA.
INTERIM RESULTS PRESENTATION 2012 Nicky Newton-King, CEO August 2012.
Schools Forum 09 January 2014.
Eastern Mediterranean University BANK406 Corporate Banking Law and Practice CHP 6.
Warsaw, 17 June 2013 Introduction of Securities Netting to Cash Market Trade Clearing.
Market Update ASLF 2016 Martin Palivec Head of Direct Custody and Clearing Canada.
STP with a drive to T+3 Brett Kotze, General Manager Johannesburg Stock Exchange Limited.
CDS Clearing and Depository Services Inc ASLF – 2016 Fran Daly Managing Director, Business Development 1.
ETP – Settlement Model December 2016.
Revised Features Securities Lending & Borrowing (“SLB”)
Margin Financing System (MFS)
Margin Financing System (MFS)
ESB Networks AIP Programme
Clearing and Settlement Function
Corporate Actions Reengineering
Presentation transcript:

1 Copyright© JSE Limited JSE Equities - Moving to T+3 21 October 2010 London

2 Moving to T+3 – Agenda  Phases so far  Outputs per Phase  T+3 Settlement Cycle  Timelines  Phase 4

3 Moving to T+3 – Phases so far Phase 1 Producing a document detailing the potential barriers and the high-level activities to overcome such barriers (to accompany the JSE’s 2008 licence renewal application) Phase 2 Nomination of responsible parties to further the investigations within their working groups, coordinated by the JSE, with their combined outputs being the creation of a “Blueprint for T+3” document Phase 3 Impact analysis and agreeing an implementation plan for T+3 with all market participants

4 Phase 1 – Outputs  The JSE submitted the document detailing the barriers and the high-level activities to overcome such barriers to the FSB with the JSE’s 2008 licence renewal  10 Barriers were raised with 58 action areas  The FSB accepted the document and requested a quarterly update on the status of the action items  The JSE initiated Phase 2 with the parties that would address the 58 action items

5 Phase 1 – Barriers and Action Areas

6 Phase 1 – Key focus areas 6 key focus areas were identified -  High level of automation  Standardisation Pre-trade and Post-trade  Harmonisation  Corporate Actions  Securities Lending & Borrowing  Settlement Assurance – JSE guaranteeing of settlement These cover all the barriers and action items

7 Phase 2 – Outputs Phase 2 was about –  Getting the nominated parties to further investigate the action items and identified issues and define solutions (the “blueprints”)  Creating Business Requirement Specifications that are signed off by the market  Completing a Blueprint (by the JSE in May 2009)

8 Phase 3 – Outputs Phase 3 was about –  The Impact Analysis and Implementation Plan for moving to T+3  Detailing how the transition from T+5 to T+3 is going to be managed  Making changes immediately, where possible, as opposed to waiting for implementation (this has already started)  Development of systems changes for T+3 for implementation after the JSE’s System Replacement Programme goes live The Impact Analysis and Implementation Plan were completed in April 2010

9 Phase 4 Phase 4 is about -  Focus on automation  Project Management  Systems Development  Management of Timelines  Changes to Listing Requirements  Changes to JSE, NSX and Strate Rules and Directives  Marketing and Education  Making sure everyone is ready to go-live  Go-live

10 New Settlement Cycles TypeSettlement Cycle Reporting Time Commit/BTB Time BTB RM Removal Reverse Subs SAT/SLB BP Reporting Commit for SA/SLB BP JSE On- market T+315h00 (S-1)15h15 (S-1)16h00 (S-1)17h00 (S-1)18h00 (S-1) JSE Same Day (SLB) T+010h00 (S)11h00 (S) JSE Same Day (MLB) T+010h00 (S)11h00 (S) JSE Rolling of Settle T+011h00 (S)12h00 (S) JSE Roll of Settle new legs Min T+211h00 (S- 2) 15h00 (S-1)15h15 (S-1)16h00 (S-1)17h00 (S-1)18h00 (S-1) JSE Give- Up T+011h00 (S)12h00 (S)

11 New Settlement Cycles cont. TypeSettlement Cycle Reporting Time Commit/BTB Time BTB RM Removal Reverse Subs SAT/SLB BP Reporting Commit for SA/SLB BP Depository Receipts Min T+111h00 (S- 1) 15h00 (S-1) Off-marketsT+311h00 (S- 1) 15h00 (S-1) Acct Transfers Min T+018h00 (S) Portfolio Moves Min T+018h00 (S) SLBMin T+113h00 (S- 1) 14h00 (S-1) SLB Returns Min T+117h00 (S- 1) 18h00 (S-1) Acct Trfrs/ Portfolio Moves RD Min T+009h00 (S)10h00 (S)

12 T+3 On-Market Settlement Cycle

13 On-market Activities (current vs future) ActionCurrent Timings – T+5Future Timings – T+3 Settlement Orders (non-controlled clients) T - BatchT – Real-time (after allocations) Client Affirmation to CSDP/Rejection to Broker T+2 (12h00)T+1 (18h00) Deemed Affirmation ClientT+2 (12h00)T+1 (18h00) Broker re-allocationT+2 (16h00)T+1 (18h00) Client affirmation of re-allocationT+2 (16h00)T+1 (18h00) Brokers netsT+2 (EOD)T+1 (EOD)

14 On-market Activities (current vs future) ActionCurrent Timings – T+5Future Timings – T+3 Non-controlled client breachT+3 (12h00)T+2 (12h00) Principal AssumptionT+4 (10h00)T+2 (16h00) MarginingT+3 (EOD)T+1 (EOD) Broker borrowing on Principal Assumption T+4 (10h00 to 12h00)T+2 (16h00 to 18h00) Settlement Authority SLBT+4 (12h00 to 16h00)T+3 (08h00 to 10h00) Failed Trade/Rolling Of SettlementT+4 (16h00 to 18h00)T+3 (10h00 to 12h00) SettlementT+5T+3

15 Corporate Actions Mandatory Events

16 Mandatory Event Information The minimum required information on Declaration Date for Mandatory Events must be:  Last Day to Trade (Cum), Ex Date, Record Date and Expected Pay Date  Cash Rates and Share Ratios can be announced no later than Finalisation Date by 12h00  Exceptions to this will be dealt with on a case by case basis  If applicable (Mandatory Security or Mandatory Cash and Security):  Delisting Date/Termination Date, Suspension Date, Effective Date  New ISIN

17 Mandatory Event Information cont. The Market has agreed on the following:  Should not all information have been made available on Declaration Date then the cut off date for the Event Finalisation should be no later than 12h00 on Finalisation Date  Exceptions to this will be dealt with on a case by case basis  Record Date will always be a Friday. In the event of a Public Holiday, Record Date will be the previous business day.

18 Elective Events – Excluding DRIPs

19 Elective Event Information The minimum required information on Declaration Date for Elective Events must be:  Last Day to Trade (Cum), Ex Date, Record Date, Expected Election Deadline Date and Expected Pay Date  Cash Rates and Share Ratios can be announced no later than Finalisation Date by 12h00  Exceptions to this will be dealt with on a case by case basis  Default Option and whether Part Elections and/or Restrictions are applicable  Elections will be sent to Strate at 13h00 with amendments until 14h00

20 Elective Events - DRIPs

21 Elective Event – DRIPs Information The minimum required information on Declaration Date for DRIPs must be:  Last Day to Trade (Cum), Ex Date, Record Date, Expected Election Deadline Date and Expected Pay Date SA Rate Conversion Rate  SA Rate Conversion Rate announced no later than 12h00 Finalisation date  Dividend Rate in foreign currency and whether Part Elections are applicable  Restrictions  All announcements on Finalisation Date will be made by 12h00

22 Fractions  It has been agreed by the market that for all companies listed locally, the rounding convention utilised will be to round down all entitlements. Fractional payments will be paid in cash, with a tolerance level to be decided on at a later stage  Spreadsheets will still be required for IPO’s and surplus rights  For Foreign and Dual Listed Companies – their rounding conventions will apply

23 High-level Timelines Communication3 rd Quarter 2010 to 4 th Quarter 2012 Internal Development3 rd Quarter 2010 to 2 nd Quarter 2011 Internal System Testing2 nd Quarter 2011 to 3 rd Quarter 2011 External System Testing 3 rd Quarter 2011 to 2 nd Quarter 2012 User Acceptance Testing2 nd Quarter 2012 to 4 th Quarter 2012 Go-live4 th Quarter 2012

24 Dependencies  JSE’s System Replacement Programme (SRP) – if pushed out will push out T+3  Regulatory or legislative changes  Market changes – SRG, etc  SRG 2012 – decision has to be made in April/May 2012 go or no-go for T+3  Corporate Actions – decision has to be made in April/May 2012 go or no-go for T+3

25 Contact Details Brett Kotze General Manager: Clearing & Settlement JSE Limited One Exchange Square, 2 Gwen Lane Sandown, South Africa Tel: Fax: Web: