NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:

Slides:



Advertisements
Similar presentations
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P-31-1 DATE: FOSS 9 & 10 – DOOR REPLACEMENT.
Advertisements

NOTE: REFERENCE PROJECT MANUAL DATED 1/4/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction.
PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET OLIN.
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
WESLEYAN P BID PACKAGE #19
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/04/13.
Exterior Components Key Terms. Roof Types Double pitched hip roof with the outside at a very steep pitch Flat slanted roof Mansard Roof Shed Roof.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P LAWN AVENUE VINYL SIDING,
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DWG. / PHOTO. NO. DATE:
EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS. 4 2 EXISTING ACCESS LADDER. RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SKETCH NO. REVISIONS Construction.
Architectural Elevations
PHOTO. NO.DATE: 06/11/13 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MAJOR MAINTENANCE FY 14.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
THE SCOPE OF THIS PROJECT IS LIMITED TO THE FRONT AND REAR PORCHES AND IS DEFINED AS FOLLOWS: FRONT PORCH REMOVE EXISTING PORCH RAILINGS, STAIR RAILINGS,
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
22 Elevations Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Introduction to Elevations Elevation –An.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P AB HOME AVENUE INTERIOR.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P / 169 HIGH STREET VINYL.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
Drafting 2 (Arch) Quiz Review #6 Quiz Review. 1.To anchor a stud wall to the subfloor, carpenters nail through the: Sole plate Header Jamb Joists Quiz.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 PowerPoint Presentation Publisher The Goodheart-Willcox Co., Inc.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
Competency: Draw exterior elevations
WESLEYAN P JUDD HALL STAIRWELL LIGHTING REPLACEMENT PROJECT
WESLEYAN P-3-1 MAJOR MAINTENANCE FY PINE STREET
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
VINYL SIDING / CARPENTRY SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-19-1 MAJOR MAINTENANCE FY BRAINERD AVENUE
WESLEYAN P-4-8 MAJOR MAINTENANCE FY WASHINGTON STREET
WESLEYAN P-32-2 MAINTAIN JUT OUT AND PAINT TO MATCH SIDING
WESLEYAN P-1-1 MAJOR MAINTENANCE FY CROSS STREET
WESLEYAN P-2-1 MAJOR MAINTENANCE FY CROSS STREET
LONG LANE GROUNDS GARAGE SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-42-1 WEST ELEVATION MAJOR MAINTENANCE FY HOME AVENUE
SECTION EXISTING CONDITION PHOTOS
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
Interior/Exterior Renovation SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-41-1 MAJOR MAINTENANCE FY AB HOME AVENUE
PORCH REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-28-1 MAJOR MAINTENANCE FY WASHINGTON STREET
Repair roof rafters / joists, soffit and fascia boards in this area.
SECTION EXISTING CONDITION PHOTOS
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-3-1 MAJOR MAINTENANCE FY 15 FOSS 1 – 18 FOSS HILL DRIVE
WESLEYAN P-13-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-23-1 MAJOR MAINTENANCE FY 16 63AB HOME AVENUE
WESLEYAN P-22-1 MAJOR MAINTENANCE FY 16 23A VINE STREET
FRONT PORCH REPLACEMENT SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-40-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-38-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-18-1 MAJOR MAINTENANCE FY COURT STREET
Presentation transcript:

NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 05/15/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MT VERNON STREET EXTERIOR RENOVATION SECTION EXISTING CONDITION PHOTOS FY 15

PHOTO. NO.DATE: 05/15/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MT VERNON STREET EXTERIOR RENOVATION SECTION EXISTING CONDITION PHOTOS

PHOTO. NO.DATE: 05/15/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MT VERNON STREET EXTERIOR RENOVATION SECTION EXISTING CONDITION PHOTOS REAR ENTRY PORCH SUN PORCH

PHOTO. NO.DATE: 05/15/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MT VERNON STREET EXTERIOR RENOVATION SECTION EXISTING CONDITION PHOTOS

PHOTO. NO.DATE: 05/15/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MT VERNON STREET EXTERIOR RENOVATION SECTION EXISTING CONDITION PHOTOS

PHOTO. NO.DATE: 05/15/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MT VERNON STREET EXTERIOR RENOVATION SECTION EXISTING CONDITION PHOTOS

PHOTO. NO.DATE: 05/15/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MT VERNON STREET EXTERIOR RENOVATION SECTION EXISTING CONDITION PHOTOS

PHOTO. NO.DATE: 05/15/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MT VERNON STREET EXTERIOR RENOVATION SECTION EXISTING CONDITION PHOTOS

PHOTO. NO.DATE: 05/15/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MT VERNON STREET EXTERIOR RENOVATION SECTION EXISTING CONDITION PHOTOS EXTERIOR SIDING – REMOVAL NOTES 1.REMOVE EXISTING GUTTER LEADERS / GUTTERS AS REQUIRED TO INSTALL THE NEW SIDING SYSTEM. PROVIDE NEW FASTENERS AND REINSTALL GUTTER LEADERS AND GUTTERS UPON COMPLETION OF THE WORK UNLESS OTHERWISE NOTED. CAULK FOR A WATERTIGHT INSTALLATION. COORDINATE WITH PAINTER PRIOR TO INSTALL. 2.REMOVE EXISTING GUTTER LEADER AND GUTTER AT SUN PORCH. INSTALL NEW GUTTER AND LEADER SYSTEM AROUND ENTIRE PERIMETER OF SUN PORCH. 3.REMOVE EXISTING SATELLITE DISH AND CABLE FROM SOUTH ELEVATION AS REQUIRED TO INSTALL NEW SIDING SYSTEM. DO NOT REINSTALL, RETURN TO OWNER. 4.REMOVE EXISTING GARAGE WINDOWS. PREP OPENING FOR NEW WINDOWS AND SIDING. 5.REMOVE AND DISPOSE OF EXISTING WINDOW FLOWER BOXES AT 1 ST FLOOR WEST ELEVATION. 6.REMOVE EXISTING WINDOW SHUTTERS AT WEST ELEVATION – RETURN TO OWNER AT 170 LONG LANE. 7.REMOVE STREET NUMBER PLACARD (152) ON FRONT PORCH & SAVE. RE-INSTALL UPON COMPLETION OF THE SIDING WORK. 8.REMOVE WALL MOUNTED MAILBOX ON FRONT PORCH & SAVE. SCRAPE, METAL PRIME AND FINISH PAINT MATTE BLACK, RE-INSTALL UPON COMPLETION OF THE SIDING WORK. 9.EXTEND WATER SPIGOT(S) AND PROVIDE TRIM KIT(S) AS REQUIRED FOR PROPER ACCESS AND OPERATION. 10.EXTEND DRYER VENT AND PROVIDE TRIM KIT AS REQUIRED FOR PROPER OPERATION. 11.FUR OUT EXISTING WINDOW INFILL AT THE EAST ELEVATION 2 ND FLOOR. REMOVE PERIMETER RAISED TRIM AND MAINTAIN FLAT STOCK TO PROVIDE A SMOOTH AND EVEN SUBSTRATE FOR A FLUSH SIDING SYSTEM INSTALL. 12.REMOVE AND DISPOSE OF EXISTING WOOD PLAQUE / METAL HANGERS AT EAT ELEVATION OF GARAGE. 13.REMOVE AND REINSTALL EXTERIOR ELECTRICAL ITEMS REQUIRED FOR THE SIDING CONTRACTOR TO COMPLETE THEIR WORK. RESECURE / RE-INSTALL ALL ITEMS DISCONNECTED UPON COMPLETION OF THE WORK. 14.ALL ELECTRICAL CONNECTIONS SHALL BE CODE COMPLIANT AND PERFORMED BY A LICENSED ELECTRICIAN (THIS WORK SHALL NOT BE PERFORMED BY THE SIDING INSTALLER). EXTERIOR SIDING / RENOVATION NOTES 1.PREP EXISTING SUBSTRATE AS REQUIRED FOR INSTALLATION OF NEW SIDING SYSTEM. 2.INSTALL ½” WEATHERALL PRO INSULATING FAN-FOLD HOUSE WRAP BY POLAR INDUSTRIES, INC., 3.INSTALL NEW CERTAINTEED CEDARBOARDS™ INSULATED SINGLE 7” ROUGH CEDAR CLAPBOARD SYSTEM (R-2.0). COLOR SHALL BE: BUCKSKIN. SIDING SYSTEM SHALL ALSO BE INSTALLED AT THE INTERIOR OF THE EAST SIDE SUN PORCH. 4.PROVIDE CERTAINTEED “STANDARD CORNERS,” COLOR SHALL BE BUCKSKIN TO MATCH SIDING. 5.PROVIDE NEW COMPOSITE LOUVERS & TRIM (NORTH AND SOUTH ELEVATIONS) TO REPLACE EXISTING LOUVERS. 6.PROVIDE ALCOA ALUMALURE 2000 TRIM COIL OR APPROVED EQUAL FOR ALL WRAP LOCATIONS. COLOR SHALL BE CAMEO. 7.PROVIDE TRIM COIL WRAP FOR ALL EXTERIOR DOOR TRIM UNLESS OTHERWISE NOTED. 8.PROVIDE TRIM COIL WRAP FOR ALL EXTERIOR WINDOW TRIM & SILLS. WINDOW PERIMETER TRIM SHALL BE BENT TO MATCH THE DECORATIVE PROFILE SHOWN ON SHEET P PROVIDE TRIM COIL WRAP OVER CORNERS OF 1 ST FLOOR SOUTH SIDE BAY WINDOWS (SEE SHEET P-18-12). INSTALL “STANDARD CORNERS” BELOW. 10.PROVIDE TRIM COIL WRAP FOR ALL HORIZONTAL FRIEZE BOARDS BENEATH SOFFITS. 11.INSTALL BENT WRAP FOR ALL GABLE CORNICE TRIM AND GABLE FRIEZE BOARDS. DO NOT REMOVE EXISTING CORNICE MOLDINGS. PROVIDE BENDS IN WRAP TO MATCH GABLE CORNICE TRIM AS CLOSE AS POSSIBLE. REVIEW FINAL BEND PROFILE WITH OWNER PRIOR TO INSTALLATION.

PHOTO. NO.DATE: 05/15/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MT VERNON STREET EXTERIOR RENOVATION SECTION EXISTING CONDITION PHOTOS EXTERIOR SIDING – RENOVATION NOTES 9.INSTALL BENT WRAP FOR ALL DORMER GABLE CORNICE TRIM AND GABLE FRIEZE BOARDS. 10.FURNISH AND INSTALL 6 PAIRS OF NEW VINYL SHUTTERS TO BE INSTALLED AT ALL WINDOWS ON THE FRONT (WEST) ELEVATION. SHUTTERS SHALL BE L-3 MID-AMERICA CUSTOM LOUVER VINYL SHUTTERS W/ CUSTOM MID RAIL AND CATHEDRAL TOP BY SHUTTERCONTRACTOR.COM. OR APPROVED EQUAL. COLOR SHALL BE #122 MIDNIGHT GREEN PROVIDE ALL COMPOSITE CEDARBOARD ACCESSORIES AND BEADBOARD TO MAINTAIN LOOK OF ALL DECORATIVE DETAILS. 12.PROVIDE SPECIALTY TRIM, TRANSITION PANELS, REAR ENTRYWAY PORCH CEILING BEADBOARD, EXTERIOR VENTS, EXHAUST COVERS, ETC. FOR A COMPLETE SIDING SYSTEM INSTALLATION. 13.REPLACE 1 ST BOTTOM STAIR TREAD AT REAR ENTRY PORCH. EPOXY FILL WOOD POSTS & RAILINGS. SCRAPE, PREP AND PAINT ENTIRE STAIR SYSTEM. 14.SCRAPE, PREP AND PAINT ENTIRE SUN PORCH STAIR SYSTEM. 15.REPLACE ALL LATTICE AT SUN PORCH. INSTALL NEW DIAGONAL LATTICE TO MATCH LATTICE AT REAR ENTRY PORCH STAIR. 16.INSTALL NEW VINYL BEADBOARD CEILINGS AT INTERIOR OF SUN PORCH AND AT REAR ENTRY PORCH. 17.WRAP ALL TRIM, SOFFITS, SILLS AND FASCIA BOARDS AT SUN PORCH. 18.WRAP ALL SOFFITS AND FASCIA BOARDS AT REAR ENTRY PORCH ROOF. DO NOT WRAP REAR ENTRY PORCH COLUMNS. PREP AND PAINT. 19.WRAP ALL GARAGE SOFFITS, GABLE AND FASCIA TRIM. 20.INSTALL NEW ANDERSEN SERIES 200 OR APPROVED EQUAL FIXED WINDOWS WITH 5/5 GRID CONFIGURATION AT THE NORTH SIDE GARAGE. 21.PREP, PRIME AND PAINT ALL EXTERIOR COMPONENTS NOT COVERED WITH CEDARBOARDS SIDING SYSTEM, ACCESSORIES OR BREAKMETAL. EXTERIOR PAINTING SHALL INCLUDE BUT NOT BE LIMITED TO DOORS, DOOR THRESHOLDS, FRONT ENTRY DOOR TRIM, CURVED HALFROUND SASH, MUNTINS & TRIM, BASEMENT HATCHWAY, FRONT PORCH IN ITS ENTIRETY (FRONT PORCH CEILING, COLUMNS, SOFFIT AND DENTILS), REAR ENTRY PORCH COLUMNS, REAR ENTRY PORCH AND SUN PORCH STAIRS / RAILINGS IN THEIR ENTIRETY, SUN PORCH AND REAR ENTRY PORCH LATTICE, CONCRETE FOUNDATION WALLS, BASEMENT SASH & TRIM, CONDUIT, WIRING, PIPING, AND ALL OTHER EXTERIOR PAINTABLE SURFACES. 22.DO NOT PAINT GARAGE DOOR. 23.COLOR SCHEDULE: ALL PAINT TO BE SHERWIN WILLIAMS EMERALD FRONT ENTRYWAY / REAR ENTRYWAY PORCH COLUMNS: SHERWIN WILLIAMS TO MATCH ALCOA CAMEO FRONT ENTRYWAY SOFFITS, FASCIA, DENTILS CORNICE, PEDIMENTSHERWIN WILLIAMS TO MATCH ALCOA CAMEO FRONT ENTRYWAY DOOR TRIM AND CURVED HALFROUND SASH, MUNTINS & TRIM:SHERWIN WILLIAMS TO MATCH ALCOA CAMEO PERIMETER SOFFITS WITH DECORATIVE DENTILS:SHERWIN WILLIAMS TO MATCH ALCOA CAMEO SUN PORCH & REAR ENTRY PORCH RAILINGS, RISERS AND STAIR FASCIA BOARDS:SHERWIN WILLIAMS TO MATCH ALCOA CAMEO SUN PORCH AND REAR ENTRY PORCH LATTICE:SHERWIN WILLIAMS TO MATCH BM BLACK FOREST GREEN FRONT ENTRYWAY CURVED CEILING: BLUE HORIZON SW6497 WOOD THRESHOLDS: MEDIUM GREY BASEMENT HATCHWAY DOOR: SHERWIN WILLIAMS TO MATCH BM TUDOR BROWN BASEMENT FOUNDATION WALLS, BASEMENT SASH & TRIMSHERWIN WILLIAMS TO MATCH BM TUDOR BROWN ALL EXTERIOR DOORS: SHERWIN WILLIAMS TO MATCH BM BLACK FOREST GREEN SCHEDULE START DATE: IMMEDIATELY UPON AWARD COMPLETION DATE: JULY 15, 2014 – NO EXCEPTIONS.

PHOTO. NO.DATE: 05/15/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MT VERNON STREET EXTERIOR RENOVATION SECTION EXISTING CONDITION PHOTOS TYPICAL WINDOW TRIM BREAK METAL STANDARD (BEND TO PROVIDE 3 DIMENSIONAL DECORATIVE PROFILE AS SHOWN – MATCH WIDTH OF EXISTING TRIM PIECES)

PHOTO. NO.DATE: 05/15/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MT VERNON STREET EXTERIOR RENOVATION SECTION EXISTING CONDITION PHOTOS PROVIDE TRIM COIL WRAP OVER CORNERS OF 1 ST FLOOR SOUTH SIDE BAY WINDOWS. INSTALL “STANDARD CORNERS” BELOW. BE FO RE AF TE R