Buy America Montana Department of Transportation Pat Ernst & Anson Moffett Construction Engineering Services Materials.

Slides:



Advertisements
Similar presentations
FHWA Construction Updates David D. Platz, PE, PTOE Construction and Contract Administration Engineer US DOT - FHWA Wisconsin Division, Madison, WI FHWA.
Advertisements

ASME Certified Yankee Dryer King Hardware May 3rd, 2010.
Cargo Direct International
PPAP Requirements Training
Loan/Grant Administration. Types of Financing Highly concessional Hardened terms Intermediate terms Ordinary terms.
Federal Acquisition Service U.S. General Services Administration Air Force Advantage!
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
OVERSIGHT & COMPLIANCE BRANCH (OCB) INVOICE PAYMENTS February 16,
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
Form I-9 Process An Online Training for Supervisors and Designees Presented by Human Resources Revised November 2009.
ISO 9001 Interpretation : Exclusions
Self-Determination Staff – Midwest Region:  Michelle R. McCormick-Corbine, Regional Office  Desiree Red Day, Regional Office  Susan Fedorko, Regional.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
First Article Inspection
1 8/29/2015WisDOT BTS MMS.  MIT – Materials Information Tracking (Field Version) Used by WisDOT/Consultant/& Municipal staff in the field to enter a.
CONTRACTUAL FLOW DOWN OF DPAS PRIORITY RATINGS
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
1 Amy Williams, Senior Procurement Analyst February 5, 2008 Defense Acquisition Regulations System
The American Recovery and Reinvestment Act of 2009 (ARRA) Federal Highway Administration Wisconsin Division January, 2010 Jason P. Spilak, PE, ARRA Engineer.
Process Planning and Computer Aided Process Planning
Encouraging Diversity Growth & Equity 123: Demonstration of Good Faith Todd McGonigle EDGE Program Manager Phone (614) FAX (614)
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
Allen Hughes State Materials Office
The Office Procedures and Technology
Dr. Catherine Turner Assembly drawings.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
What Documentation Needs to be Submitted With an Approval Application?
Prepared by Michele Mascia “This workforce solution was funded by a grant awarded under Workforce Innovation in Regional Economic Development (WIRED) as.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Successful Invoicing Training for Success September – October 2006 Schools and Libraries Division Washington, DC Boston Seattle St. Louis.
WYDOT CLEARING UTILITIES Keri Bohlmann, P.E. Utilities & DSS Supervisor.
0 Electronic Subcontracting Reporting System (eSRS) Department of Defense Government Training Submitting a SSR – Commercial Plan.
1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports.
Sign Structures Updates: Helpful Tips for Inspectors
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
1 Amy Williams, Senior Procurement Analyst Friday, October 26, 2007 Defense Acquisition Regulations System
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) DATA MANAGEMENT SYSTEM COMPLETING THE COMPLIANCE CERTIFICATION MassDEP, Bureau of Air and Waste.
Complete Ordering System for Promotional Literature and Samples Quick Reference and Training Guide.
Sponsored Project Administration Fall 2012 CERTIFICATION PROGRAM Sponsored Project Lifecycle Introduction Overview Creating a Project Budget Compliance.
U.S. General Services Administration Federal Acquisition Service U.S. General Services Administration GSA Federal Acquisition Service Industry Webinar.
UNDERSTANDING THE BUY AMERICAN PROVISION for PROCUREMENT Ronna SeGraves, MS, RD, LD May 2016.
Presented by: Brienne Berscheid Assistant Vice President & Construction Escrow Underwriter Construction Escrow Documentation Requirements.
United States Department of Agriculture Food Safety and Inspection Service Draft Labeling Policy Guidance for N- 60 Testing Claims for Boneless Beef Manufacturing.
Project Ⅲ Task 1 Export Procedure ( 3 ). Market Research Any exporter who wants to sell his products in a foreign country or countries must first conduct.
IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
Metra Construction Contractor Prevailing Wage Workshop
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – Cowes Date: 13/5/16.
CHAPTER XII SHIPPING DOCUMENTS
Administration of a FIDIC Contract - Project Control
Hiring Manager onboarding
Inspector's Role and Responsibilities
Financial Oversight of the Federal-aid Program Financial Integrity Review and Evaluation (FIRE) Program Mark Newland, Financial Manager FHWA Indiana.
Typical Receiving Procedures
Acceptance Process for Manufactured Products by Certification:
Completing the State Aid Payment Request
Raw Materials For Precast Concete Pipe and Box Culverts
Quality Control Personnel Training
Presentation Title Goes Here
SQA01 Supplier Guidance Material: Permission to Ship Forms
Working Session on American Iron and Steel (AIS) Requirements for the Clean Water and Drinking Water State Revolving Funds WWEMA 109th Annual Meeting.
The Office Procedures and Technology
Buy America and Utility Work
Business Office Tutorial
Fiber Reinforced Polymer Systems
Standards and Certification Training
Presentation transcript:

Buy America Montana Department of Transportation Pat Ernst & Anson Moffett Construction Engineering Services Materials

2  Originated in the Surface Trans Asst Act of 1982 passed by Congress.  Applies only to Federal-aid highway construction program  Originally applied to  Originally applied to steel and cement and manufactured products  Congress clarified to include iron and coating as a manufacturing process in 1991

3  All manufacturing processes, including coating, must occur in the US  State must have standard contract provision requiring domestic steel and iron

4 What is manufacturing?  Any process that modifies the chemical content; physical shape or size; or final finish.  Includes initial melting and mixing (smelting) through the bending and coating stages. Also includes rolling, extruding, machining, grinding, and drilling.  Foreign source steel billets are not allowed

5 Waiver ?  Must be requested by state to FHWA 1. Must be in public interest (~PIF) 2. Show domestic materials are not produced in the US in sufficient and reasonably available quantities.  Current nationwide waivers for pig iron; raw alloys, and processed, pelletized, and reduced iron ore granted in 1995.

6 NAFTA  Does not apply to Buy America  Specific exemption in NAFTA for grant programs such as Federal-aid  GATT and EEC agreements do not apply either

7 Domestic Materials (Steel)  Code of Federal Regulations Highways 23  MDT Requirements.  Special Provision  Standard Specifications for Road & Bridge Construction 1995 & 2006 Edition  Section Certificate of Compliance.

8 Domestic Materials (Steel)  Manufactured in the U.S.A  Foreign Materials are allowed if the price is 1/10th of 1% or $ which ever is greater including freight.  Letter of permission is required from the Materials Engineer or the Bridge Engineer depending on usage.  Aluminum is not covered under Buy America.

9 Domestic Materials Section  Material Grade  Country of Origin  Chemical and Physical Analysis  Tracking of (Heat Numbers)  Confirmation from the mill smelting the ore is the only way to ensure documentation properly corresponds with the material provided. Mill test reports (MTR's) are required to ensure

10 Domestic Materials Section  The smelter reduces iron ore/pig iron,slab or recycled steel then processes the material into useable form.  The smelter or manufacture provides the appropriate mill test report.  Mill test reports may not be reproduced by a supplier for incorporation into a MDT project.  This document would be a certificate of compliance.  Mill test report must be legible.

11 Special Provisions  Special Provisions requires a Form 406 or 407 be submitted 5 days prior to incorporation into the project.  Form 406 or 407 must be signed by the Prime Contactor.  Forms are available on the Construction Bureau web site under the link for Contractors forms.

12 Prime Contractors Signature Submit all required documentation with this form. See the back of this form for general guidance on “Buy America” documentation. Refer to MT 601 for sampling & testing requirements. Contractor’s Statement of Certification Domestic Material. I hereby certify that all manufacturing processes, including application of coating, occurred in the United States for the above listed materials and that those materials do meet all other requirements as set forth in the plans and specifications. Non-Domestic Material. I hereby certify that the above listed materials do meet the requirements as set forth in the plans and specifications with the exception that all or part of the manufacturing process may have occurred outside the United States. The material is considered non-domestic. The cost of this material, including delivery to the project, is __________. By Title (Prime Contractor’s Name, Typed or Printed) Date

13 Section Certificate of Compliance

14 Certificate of Compliance Section Certificates of compliance sometimes referred to as (C of C) may be as simple as a letter from the supplier stating that the Materials provided comply with the contract documents for a specific MDT project and signed. The price of the supplied items must be within the Buy America requirements.

15  The Certificate of Compliance (C of C) may be as complicated as a listing of all metallurgical aspects that are being provided for the material.  The letter is provided on company letterhead with phone numbers and addresses to check the source. Certificate of Compliance Section

16  A bill of lading is not a (C of C) neither is a packing slip with a bar code on it.  In the event confirmation of material provided on the certificate of compliance cannot be established the material will be rejected. Certificate of Compliance Section

17  Printed or stamped on the (C of C) must be the domestic material phrase (we certify the material provided was melted/smelted and manufactured in the U.S.A) or a similar statement.  C of C must be legible. Certificate of Compliance Section

18  Signature  Statement of Certification  Company Address  Attributes of the test are detailed in the standards  Steel items will have a domestic material statement Complete Conformance Cert

19 Certification Statement “I certify...”

20 Incomplete Compliance Heat Numbers Incomplete Conformance Data

21 Complete Documentation  Broker’s Test Data  Heat Numbers Supplied  Paperwork Matches Mill Data

22 Complete Documentation Broker’s Test Data Broker’s Test Data With Mill Certification

23 Complete Documentation  Broker’s Test Data  Heat Numbers Supplied  Paperwork Matches Mill Data

24 Manufactured in the U.S.A  Manufactured Has Been Used by Suppliers (Brokers) to Infer the Item Is of Domestic Origin.  This Is Not the Case.  The Only Source That Is Acceptable to Claim Domestic Material Compliance Is From the Smelter/Steel Mill.

25 Certification - No Signature Test is Not Accepted No statement of made in the USA. Certificate is Not Signed

26 Foreign Certificate Example Test Sheet not in English

27 Double Switch

28 Double Switch

29 Double Switch

30 Data Not Consistent: Non-Domestic? USA? Double Switch

31 Read the Paperwork Paperwork from a US Smelter.

32 Read the Paperwork Not all Heat Numbers are Domestic Steel

33 Foreign Materials

34 Foreign Materials  FAP project number and name.  Item or piece number.  Drawing reference.  Quantity.  Cost including delivery to the project. We must have the following to consider the request:

35 Foreign Materials Written Authorization Bridge Engineer, Materials Engineer or their Agent for the Use of Foreign Material is Required.

36 Follow the Paperwork MDT’s Acceptance Letter

37 Follow the Paper Work  Heat Number  Mill  Supplier  Project Use  Cost MDT Issue Acceptance on

38 Follow the Paperwork MDT’s Acceptance Letter Broker Certification Letter

39 Follow the Paper Work Steel Broker Sends  Test Report  Requests Acceptance Report Includes Heat Numbers and Steel Testing Data

40 Follow the Paperwork MDT’s Acceptance Letter Broker Certification Letter Mill Certification Test Report Chinese

41 Follow the Paper Work Request is not Complete Broker’s Test Report Dose Not Have Mill Test (Required from the Mill Only) Must Include Heat or Lot Numbers

42 Foreign Certificate Example Missing Heat Numbers

43 Components Inspection

44 Components Inspection  FPM  Contractors  Inspectors  Fabricators Bridge Components (T101, Girders Etc) and Overhead Sign Structures. Bridge Bureau Will Make Inspection Arrangements and Notify:

45  Field Inspections, FPM May Request Field Inspection of Materials Received That Were Not Shop Inspected..  The FPM Will Be Notified of the Inspection Requirements. Components Inspection

46 Materials Bureau Will Make Inspection Arrangements for Other Components Cattle Guards, Sign Posts, Culvert, Etc. Materials will verify Buy America requirements for CSP and RCP at the point of manufacture. Components Inspection Other

47 Source and Supply Letters

48 Source and Supply Letters  Source and Supply Letter’s Will Continue to Be Sent to the Materials Bureau.  Notification of Bridge Bureau to Initiate Inspection Arrangements Cannot Be Made Without the Source & Supply Letter.  Materials That Are Delivered to the Project Without These Checks and Balances Should Not Be Incorporated Until the Source Can Be Determined.

49 Source and Supply Letters It Is in the Contractors Best Interest to Get the Source and Supply Letter to Materials as Soon as Possible.

50 Call for assistance  Bridge Bureau  Phone (406)  Materials Bureau  Phone (406)  Local Materials Office

51 Guardrail

52

53 Inspection  Prior to installation match the paper work to the rail.  Check the heat number stamped on the rail.  If the heat numbers don’t match-don’t install it.  Box Beam doesn’t have heat numbers stamped on them.  Where is the heat number?

54 Suppose To be here

55

56

57

58

59

60

61

62 Questions ?