Managing with Data Washington State Association of Counties (WSAC) June 6 th, 2013 Brian Willett, Performance Analyst.

Slides:



Advertisements
Similar presentations
Beginning Action Research Learning Cedar Rapids Community Schools February, 2005 Dr. Susan Leddick.
Advertisements

(Say each word as it appears on the screen.)
The Great Blue Bead Company Quality Is Our Priority Based on a term project by Elizabeth A. Hoffman.
EvalS Application User Guide version September 17, 2011.
More Variable Control Charts A. A. Elimam. What about the Short Run? n n X-bar and R charts track process with long production runs or repeated services.
6-1 Is Process Stable ? The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process.
High-Frequency Words Second Grade Room B10.
7 Day Self Assessment Tool (7 Day SAT) User Guide v7 (June 2015)
Chapter 10 Quality Control McGraw-Hill/Irwin
Welcome to Turnitin.com’s Peer Review! This tour will take you through the basics of Turnitin.com’s Peer Review. The goal of this tour is to give you.
Goal Sharing Team Training Statistical Resource Leaders (1)
Statistical Process Control
Educational Measurement and School Accountability Directorate Better informed, better positioned, better outcomes Data Analysis Skills Assessment Introduction,
Welcome to the 2015 Prevailing Wage Survey Tutorial This tutorial will assist you in the process of completing Survey Forms. If you still have questions.
ABC’s of PowerPoint (Office 2007) Part 1: Basic Vocabulary Part 2: Cursors Part 3: Insert Your Text Part 4: Insert Your Pictures Part 5: Basic Tools &
HOSPITALITY MANAGEMENT Ch. 16 HS. THE GENERAL MANAGER  General Manager – is a person responsible for the entire operation of one unit of a hospitality.
Daisy Chou KMDC, Hon. Chairlady Master Black Belt Knowledge Management Manager Strategic Quality Manager Research Director Chief Statistician Lecturer.
Washington State Auditor’s Office Troy Kelley Independence Respect Integrity Local Government Performance Center How auditors can help local governments.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
10-1Quality Control William J. Stevenson Operations Management 8 th edition.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 IES 303 Chapter 5: Process Performance and Quality Objectives: Understand.
© 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Triangle Town Hi, I’m Elke. Pleased to be your guide through Triangle Town. Don’t ever worry about getting lost. I’ll stay with you the whole time.
From Compensation and Benefits Review Jan/Feb 2000 Presented by Andrea Phillips and Alyssa Phillips.
Associate ® Typist – Transcription Module Starting Associate Transcription: To start Associate typist module, double click the Associate dictation icon.
1 Managing Your Integrations an Operations Science Approach Steven Rdzak Infrastructure Services
Project Management Chapter 9 Project Quality Management Dr. Jana Jagodick Polytechnic of Namibia, 2012.
Being Audited – Life on the Other Side of the Fence.
 Dr. W Edwards Deming. JOB POSTINGS  1 Industrial Engineer/C.I. Coordinator. Train workers, enforce procedures, report compliance to management  4.
Copyright (C) 1993 – 2005 Michael Arthur Johnson Riga, Latvia Beyond Total Quality Management Learn to live the talk.
Safety as a Value Beyond Compliance. Inspection Era ( ’s) The Safety Management Era (1950’s-60’s) The OSHA Era (1970 – 80’s) The Accountability.
Overview The Importance of Data: As easy as balancing your checkbook.
M o n t h O n eM o n t h T w o Week 1 Week 2 Week 3Week 4 Week 5 Week 6 Week 7 Week 8 Cycle 1 You Enroll 2 New Associates: Jill and Bob CUMULATIVE RESULTS.
Head to Irrationallabs.org for more information on applying behavioral economics.
POWER TEACHER GRADE BOOK TRAINING Tracy Tom Tina.
Problem Solving Block. Skill Block Review DECIMALS Find the EXACT answer. *Remember to line up your decimals! =
“The Red Bead Experiment” A demonstration of futility found in many Management Systems Materials provided by The Pyzdek Institute Author, Six Sigma Handbook.
Using the AE Tools to Improve Consistent Assignment.
Business Statistics, A First Course (4e) © 2006 Prentice-Hall, Inc. Chap 14-1 Chapter 14 Statistical Applications in Quality and Productivity Management.
Analyzing & Presenting Performance Improvement (PI) Data.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. x Process Improvement Using Control Charts Chapter 14.
Score Sheet The BEAD-BOX GAME tm Note: Production Lot Size 50 Beads Per Operator Per Day Inspector (1) ___________________ Recorder: ___________________.
When the program is first started a wizard will start to setup your Lemming App. Enter your company name and owner in the fields designated “Company Name”
Time Series - A collection of measurements recorded at specific intervals of time. 1. Short term features Noise: Spike/Outlier: Minor variation about.
Data Collection & Analysis ETI 6134 Dr. Karla Moore.
5.3: Simulation NEW SEATING CHARTS NEW WEBSITE FOR NOTES.
When the program is first started a wizard will start to setup your Lemming App. Enter your company name and owner in the fields designated “Company Name”
Dynamic Dots Moving from the known to the unknown.
Quality Control Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
McGraw-Hill/IrwinCopyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 17 Process Improvement Using Control Charts.
| +44(0) © ICE LTD 2009 All rights reserved. August 2009 version 1.3 CWP Systems Thinking Training Session 2.
HSC IT Center Training University of Florida Novell GroupWise: Reducing your Mailbox Size Health Science Center IT Center – Training
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Performance Measure Basic Training City of Bellevue March 12, 2013 Brian Willett, Performance Analyst.
Developing and Implementing a Strategic Plan Pierce County Public Works and Utilities July 25, 2013 Brian Willett, Performance Analyst.
Logic Model Training City of Bellevue February 26, 2013 Brian Willett, Performance Analyst.
SAMPLE QUESTION ANSWER NOTES. SECTION 1 METHODS OF COLLECTING INFORMATION DESCRIBE TWO DIFFERENT METHODS THAT COULD BE USED TO COLLECT INFORMATION ABOUT.
© 2010 Robert Half Management Resources. An Equal Opportunity Employer. Cost-Effective Staffing for Unprecedented Times.
High Impact Leadership –Safety First Understanding The System, its Influence on Patient Safety and The Leadership Framework to Manage it Successfully David.
RED BEAD EXPERIMENT
AP Statistics FINAL EXAM ANALYSIS OF VARIANCE.
Empower Managers to Take Ownership of Employee Engagement
SAMPLE Implement Performance Improvement Plans
Which Coin Will Hold More Drops of Water?
Public Practice versus Industry
Systems Analysis and Design
Hanford Performance Indicator Forum Statistical Process Control June 2005 Steven S Prevette
Introduction to Excel 2007 Part 3: Bar Graphs and Histograms
Chapter 11 Excel Extension: Now You Try!
The Quality Improvement Model
Presentation transcript:

Managing with Data Washington State Association of Counties (WSAC) June 6 th, 2013 Brian Willett, Performance Analyst

My Premise Learning HOW to manage with data is just as important as learning WHAT to measure. Performance measures are a management TOOL, just like a knife or a screwdriver. The TOOL can be used for both GOOD and EVIL. INTENT and SKILL separate a home cook from a master chef from a serial killer. 2

Supervisor (1) A “natural leader” Believes in holding people “accountable” Able to “motivate” employees Able to enforce strict adherence to procedure 3 The Yellow Bead Company Employees Inspectors (1-2) Can distinguish the color yellow Can count up to “20” Recorder (1) Legible Penmanship Can calculate the average of 5 whole numbers Willing Workers Willing to “do their best” Able to follow strict production procedures 3 Timer (1) Can operate a digital stopwatch with basic training

Objective: “Produce” as many yellow beads as possible. Step 1 – Hold the bead box upside down, press the white button on the side, and empty the “trap”. Step 2 – Flip the bead box over and shake it exactly 5 times. Step 3 – Place the bead box on the table and press the white button on the side once. Step 4 – Flip the bead box upside down and show the production results to the inspectors. Step 5 – Inspectors independently count the number of yellow beads and tell the agreed upon number to the Recorder. The Recorder writes that number on the scorecard. Step 6 – Pass the bead box to the next Willing Worker and repeat the process four more times (Total of 5 times). Step 7 – After the 5 th time through, pause work until told to resume and have the Recorder calculate the average production of the team for the quarter. Step 8 – The Recorder writes down how much time elapsed from start to finish. 4 The Yellow Bead Company Procedures 4

5 The Yellow Bead Company debrief Anybody can achieve almost any goal by… …redefining the terms. …distorting or faking. …running up costs. “Numerical goals lead to distortion and faking, especially when the system is not capable of meeting the goal. Anybody will meet the quota (goal) allotted to them, especially if they are not responsible for the losses generated.” “Perhaps I can find new ways to motivate them?” Dr. W. Edwards Deming 5

It’s the process and system, not the people 6

7 What is a system? Process OutputsInputs Users & Brokers (Customers) Suppliers Outcomes: Organizational Benefits User Benefits Financial Stakeholder Benefits

Foofaraw and Twaddle “All of the empowered, motivated, teamed-up, self-directed, incentivized, accountable, reengineered, and reinvented people you can muster cannot compensate for a dysfunctional system. When the system is functioning well, these other things are all just foofaraw. When the system is not functioning well, these things are still only empty, meaningless twaddle.” Peter Scholtes 8

9 What Does Change Look Like on a Run Chart? Process-Level Shift: Eight or more successive points on the same side of the median (baseline) Trend: Seven or more successive points in the same direction (increasing, decreasing, or staying exactly the same) Warning: Seeing a trend can depend on your sampling frequency Non-Random Variation Patterns: Look for repeating cycles and clusters Don’t look too hard for these – If they are present they tend to jump off the page 9

Is there evidence of abnormal variation? (trend/process level shift) …If yes, put your finger on the abnormal variation and ask, “What happened here to cause it?” …If no, is the data capable of meeting or exceeding the target 100% of the time? …if no, you have two options: 1.Change the target so you can meet or exceed it 100% of the time, or… 2.Fundamentally change the underlying processes/systems. 10 Analysis questions and management options

In this example, actual performance has never come in below the target, but the trend is stable and undesirable. If this were on a typical Red/Yellow/Green scorecard, it would be Green every time If you just base your evaluation on whether they hit the target or not in the past, you are missing what is likely to happen in the future. Time y Better Why not just worry about meeting targets? 11 Target

No time? No money? 12

Understanding Data, T.S. Marshall, The New Economics, Dr. W. Edwards Deming, The Leader’s Handbook, Peter Scholtes, We Don’t Make Widgets, Ken Miller, Extreme Government Makeover, Ken Miller, A Performance Management Framework for State and Local Government, National Performance Management Advisory Commission, Additional readings and references

14 More Information? Help? Brian Willett Performance Analyst (360) Larisa Benson Director of Performance Audit (360) Website: Twitter: Local Government Performance Center