Christchurch City Council footer text Flood Taskforce Flood risk in Sumner and Moncks Bay.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

Sea Level Rise 2014 City Council Update
HOW DISASTER ORGANIZATIONS FIT TOGETHER IN MY COMMUNITY JUNE 13, 2013 Connecting Disaster Resources with Disaster Needs.
LOCAL GOVERNMENT MAY 2009 Presented by Paula Hunter, MWH NZ Ltd New Zealand Climate Centre Climate Change Adaptation Conference Including Transport and.
Management of future floods at Cockermouth LO: To be able to explain how a specific riverine area has been managed.
BoRit Superfund Site Timeline
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Huntly Flood Alleviation Scheme
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
Truro DG5 Scheme April Integrated Urban Drainage Schemes Proposed Hendra Road surface water separation Kenwyn Street Proposed Redannick Lane surface.
Where does all that rain go? Stormwater Management in London.
Housing Recovery Presentation to Community and Public Health Advisory Committee 29 April 2014.
Sovereign Waters Lake Management Plan Outcomes and Recommendations 9 May 2013.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
MODULE 3. MANAGING EMERGENCY RESPONSE Dick Evans.
COMMUNITY PRESENTATION
Potential Underground Wiring Meeting with Residents Wednesday, September 15, 2010 lionsbay.ca Lower Lions Bay Water Line Replacement The Village of Lions.
The Dirt on Water Pollution. What will we talk about? What is a Watershed? Stormwater in our Watersheds Water Pollutants Effects of Pollution Solutions.
 Prepared for  City of Palm Coast, Florida  June 24, 2014 Drummond Property Acquisition in Connection With The Land Donation of 70 Laramie Drive From.
SHORELINE MANAGEMENT PLAN REVIEW (SMP2) South Devon and Dorset Coastal Authorities Group SDADCAG.
Special Order by Consent Wastewater Collection Improvement Projects Mark Fisher and Dennis Asbury Final Report to City of Eden October 20, 2009.
ECLAC Disaster Assessment ECLAC Disaster Assessment Training Manual Section V (ii) Coastal Engineering: Reconstruction – Management and Mitigation.
Anne Arundel County Department of Public Works Presented by: Shannon Lucas, P.E. Brightwater, Inc.
ACTIONS TAKEN BY THE COLOMBO MUNICIPAL COUNCIL FOR REDUCING THE RISKS OF NATURAL DISASTERS IN COLOMBO CITY PRESENTED BY OMAR KAMIL CHIEF CITY ADMINISTRATOR.
Managing Council’s Road Network for Better Outcomes Storm Damage Experience Ian de Bruyne Manager Program Planning & Delivery IPWEA Regional Forum 15 May.
Flooding John Backley,OCC and The Environment Agency.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
Sewer Relief Project. Basement Flooding has been a major problem for city of Selkirk residents. High intensity summer rain storms can result in extensive.
Storms and Flooding across Aberdeenshire December 2012 Stephen Archer, Director of Infrastructure Services William Munro, Area Manager (Kincardine & Mearns)
Oregon Case Studies Ryan Johnson. Studies  The response of impounded sediment to a culvert replacement project on Sutter Creek, a tributary of Honey.
Highways and Engineering Consultation Presentation.
 Prepared by  Prepared for  City of Palm Coast, Florida  January 27, 2015  Drainage Study Sections 30 & 34 for Development of City Wide Stormwater.
Transfer of Private Sewers and Lateral Drains CHC Task and Finish Group October 2011 Nigel Godfrey Private Sewer Transfer Programme Team.
JEETENDRA DAHAL MANAGER TECHNICAL SERVICES CITY OF PALMERSTON RISK BASED INFRASTRUCTURE INSPECTION SYSTEM.
Issues surrounding the Red River Flood of Outline Introduction Impacts of the flood Flood protection works Manitoba Water Commission (MWC) Current.
Dublin City Council Environment SPC: Lead Briefing 24 th June 2015.
Creek Upgrade Option Meeting with directly affected property owners - Area 3.
XLIX Engineering Design Firm © 2010 ENGR/ETGR Definition of Project 1 A project is “…a combination of human and non-human resources pulled together.
Dr Gary MockeDr Gary Mocke. No interference with coastal processes No need for any expenditure Social impacts (relocation, loss of beach access and.
 Prepared by  Prepared for  City of Palm Coast, Florida  August 30, 2011  Drainage Study Sections 31 & 35/37 for Development of City Wide Stormwater.
Suwannee-Satilla Drainage Basin: Flood Control Issues and Requested Action Suwannee-Satilla Regional Water Planning Council Douglas, GA December 8, 2010.
Systems mitigate risks Risks not eliminated Public Works: Prepared Annual valve testing Ongoing dam infrastructure improvement program.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
Communities Fire Safety Report following consultation with Housing Providers 25 th January 2010.
A tale of two developments Stephen Gardner Environment Canterbury.
SURF BEACH CATCHMENT, KIAMA Floodplain Risk Management Study & Draft Plan Community Information Newsletter March 2016 The study area investigated in the.
Impacts of Flooding and Flood Risk 1)To study the impacts of flooding 2)To understand how hydrologists try to forecast the likelihood of future floods.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Flood Response and Recovery Tony Hanson Environmental Protection Manager Jarrow and Boldon Community Area Forum Thursday 25 th October 2012.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
‘FLOCKTON BASIN’ BUILDING IMPACT AND LOSS ESTIMATES FOR THE MARCH 5TH 2014 CHRISTCHURCH FLOOD EVENT R. Paulik 1, G. Smart, J. Bind 1 National Institute.
Proposed Storm Water Utility Fee July Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three.
Consultation Process within the Street Lighting PFI SSE Contracting Working in partnership with Nottingham City Council.
1 Consultation Process within the Street Lighting PFI SSE Contracting Working in partnership with Nottingham City Council.
Waterways Management Monthly Report Council Briefing December 12, 2012.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
March 2012 Flood event – Community Engagement. Todays discussion 1.Summary of the event 2.Impact on the community 3.Opportunities for engagement 4.Key.
Stormwater Management
ROAD HAZARD ASSESSMENT
Storm Water Pollution Prevention Plan Development
Drainage Study Sections 30 & 34 for Development of City Wide Stormwater Management Master Plan Prepared for City of Palm Coast, Florida Prepared by March.
Jeopardy Old Man River The Dam Category Well, Well, Well
Where does all that rain go?
Watershed Task Force meeting
Event: Flood Community of Practice workshop - Brisbane
900a Lower Styx Rd.
MS4 OVERVIEW 2015.
Regional Stormwater 2016 Operations, Maintenance, & Projects
Presentation transcript:

Christchurch City Council footer text Flood Taskforce Flood risk in Sumner and Moncks Bay

1.Flood Taskforce purpose 2.Storm events 3.Vulnerability levels 4.Areas assessed 5.Temporary flood defence toolbox 6.Next steps 7.Questions Outline Eastern Terrace - April 2014 Squire Street - June 2013

Flood Taskforce purpose “ Assisting the most vulnerable homes to cope with the frequent flooding caused by the earthquakes”. Slater Street – June 2013

Which areas were covered by the Flood Taskforce? Lower Avon River Dudley Creek (including Flockton) Lower Heathcote (including Woolston/Opawa) Upper Heathcote Heathcote Valley Southshore Sumner (including Redcliffs) Little River Lyttelton

Storm events since 1961

Vulnerability Levels Three vulnerability Levels for multiple flooding occurrences since the earthquakes

Findings Areas investigated by Taskforce Identified number of households Vulnerability Level since the earthquakes 1 (multiple floods in the home) 2 (multiple floods under the home) 3 (access cut from the home repeatedly) Sumner Village 0 10 Moncks Bay0 0 0 * Properties identified in the May 2014 Taskforce Report by Customer Service Requests; flood modelling confirmed by visual inspections. Note: 7 properties recorded as flooded above floor level once since earthquakes

Flood Defence Toolbox

Christchurch City Council footer text Local Area Schemes for Wakefield / Paisley Area

Christchurch City Council footer text Wakefield Ave / Paisley St Area

Christchurch City Council footer text Wakefield Ave / Paisley St Scheme Phase 1 Recommendations Removal of sediment from Sumner Stream Increase inlet and pipe capacity of sumps outside 125 Wakefield Ave Liaise with CERA to mitigate both short and long term sediment and runoff issues from Red Zone Van Asch St bridge being replaced by SCIRT

Christchurch City Council footer text Mariner Street Area Cave Rock Drain Outfall Cave Rock Outfall Burgess Street Outfall

Christchurch City Council footer text Richmond Hill Drain / Mariner St Area Phase 1 Recommendations Investigate options for improved outfalls at Cave Rock and Burgess St to to mitigate operational issues related to sand Formalisation of the secondary flow path from Cave Rock Drain outfall (surf club) Prepare specific operational and emergency response plan to document critical requirements for operation of the system

Christchurch City Council footer text Other Recommendations Undertake immediate maintenance on SFRP flap gate to ensure fully operational Investigate options for providing ability to manually open SFRP flap gate Reinstate bolts on SFRP manholes

Christchurch City Council footer text Other Recommendations Assess sediment levels and programme removal sediment and other constrictions from Sumner Main Drain between Truro and Colenso streets Monitor sediment levels in SFRP once flap gate operational and programme cleaning if required Cleaning out road side swale on Heberden Ave / Arnold St intersection to reduce runoff across road, possible footpath improvements same area to minimise runoff into private property (36a Heberden Ave)

Christchurch City Council footer text Next steps Flood Taskforce Ongoing maintenance activities Further investigations for solutions Flooding recommendations delivered to Council and government Residents Complete a survey On-going contact One-on-one meetings with engineers if a solution affects your property

Questions? Call Centre: Website: