July 2004 Use menu "View - Header & Footer" for Presentation title - Siglum - Reference Integrated CAD-Metrology and Alignment of Key Features of A380.

Slides:



Advertisements
Similar presentations
Project Management Techniques and tools Move mouse over arrow to enter presentation End Show.
Advertisements

Dimensional Management of Composite Tooling for the World’s Largest One Piece, All Composite Aircraft Fuselage Presented by: Craig Cramer Boeing 787 Operations.
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
FASTAHEAD Project- Implementation of Key Activities Modules of MSc (Advanced Design & Manufacture)- 13 Modules Developed 1.Design management and prediction;
George Kovatchev Sitius Automation SITIU S Why Use the UG Model for Dimensional Control UG Users Group Conference Fall 2000.
Solomon William KAMUGASA
Intended Audience: This StAIR is intended for advanced second year students (10-12 grade) with a mechanical focus.Objective: Given the Applying GD&T StAIR.
© 2011 Adobe Systems Incorporated. All Rights Reserved. Adobe Confidential. Kiran Kaja | Accessibility Engineer Ensuring Accessibility in Document Conversion.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session # 12.
GEOMETRICAL DIMENSIONING AND TOLERENCE 1. Geometric dimensioning and tolerancing is an international language used on drawings to accurately describe.
Calypso Curve Overview
SpatialAnalyzer Advanced Uncertainty Analysis
Network Management Overview IACT 918 July 2004 Gene Awyzio SITACS University of Wollongong.
International Workshop on Accelerator Alignment DESY, Hamburg Germany Graphical and Numeric Measurement Station Uncertainty Characterization Scott Sandwith.
GD&T Inspection in SpatialAnalyzer
SCC & Leica  Import total station survey, GPS, traverse, levelling and GIS data direct from all Leica instruments.  In built Grid Inquest for GPS reduction.
Coordinate Measurement Systems Committee Albuquerque, New Mexico April 13-17, 2001 Scanners – Robots – Measurement Plans Synergy in Motion Bruce Thomas.
Week 6 - Lecture Product Documentation
Month 200X Use menu "View - Header & Footer" for Presentation title - Siglum - Reference Large Jig Verification Project LVMC 06 Geraint W Jones Engineering.
© 2006, Cognizant Technology Solutions. All Rights Reserved. The information contained herein is subject to change without notice. Automation – How to.
Automation Solutions Scott Sandwith Applications Engineer
Computer Aided Design, Manufacturing & Measurement Integration August Coordinate Measurement System Committee Albuquerque, New Mexico Richey-McIvor-Sandwith.
EF 101 Analysis & Skills Module 1.2 Engineering Graphics - Introduction and Sketching Basics.
What is Business Analysis Planning & Monitoring?
Application Solution 3D Inspection Automation with SA.
Overview of SpatialAnalyzer
Virtual reality. Tasks 3D digital model from planes 3D digital model of existing objects Office work Field observations Solid modeling Photogrammetry.
NCSX Metrology 1/7/04. Short term purchase recommendation Buy the Spatial Analyzer Software package –This software will be the user interface for operating.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Service Transition & Planning Service Validation & Testing
Quality Assessment for LIDAR Point Cloud Registration using In-Situ Conjugate Features Jen-Yu Han 1, Hui-Ping Tserng 1, Chih-Ting Lin 2 1 Department of.
DELMIA DPM Assembly This is the Master “Presentation title” page. Type the title of your presentation in the "Presentation title” field. Cette page est.
Software Engineering Principles Principles form the basis of methods, techniques, methodologies and tools Principles form the basis of methods, techniques,
Inspection & Assembly Solutions for Advanced Manufacturing.
Chapter 1. Introduction.
New Ideas for IA Readings review - How to manage the process Content Management Process Management - New ideas in design Information Objects Content Genres.
Objective Read World Uncertainty Analysis CMSC 2003 July Tim Nielsen Scott Sandwith.
Best-Fit, Bundle, & USMN Using SA to understand measurement uncertainty Zach Rogers NRK, EMEAR Application Engineer.
NCSX Metrology. Goals –Need to accurately make measure measurements for several NCSX systems Modular coil –As-built measurements of coil form –Conductor,
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
New Geometry Fit Relationships Geometry Relationships allow for dynamic fitting and comparison of geometry. Relationships are dynamic in nature and update.
DPT 312 METROLOGY CHAPTER 3 MEASUREMENT AND TOLERANCES
Chapter 6 CASE Tools Software Engineering Chapter 6-- CASE TOOLS
3D Metrology Software Solutions & Services. A powerful and versatile software platform A rich and extensive history 1998 First release as an OEM product.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
MEP Fabrication Detailing in Autodesk® Revit® MEP 2016
What's New in SA Point Cloud Auto Thinning Point Clouds automatically thin for quick rendering when rotation or panning the view with the right.
Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Implementing a Model Based Approach to Design at Wisconsin.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
Tivoli © 2010 IBM Corporation CCMDB New Features for CCMDB August 2010.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
1 MICE CM27 Engineering integration Andy Nichols, STFC 9 th July, 2010.
Recommendations on Supports and Adjustment systems for ESS LINAC Components Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit.
Selecting the Right CRM System at AVEBE Refik Kocak CRM Partners (on behalf of AVEBE) CUSTOMER.
CEA - Irfu – Mois 2011 – 1 Cavity-string alignment experience in the EXFEL prototype cryomodule assembly Michel Fontaine CEA – SACLAY DSM/IRFU/SIS TTC.
PC-DMIS Introduction to GD&T Selection
Optimization. Finding the best fit
Software Requirements
Computer Aided Design and Computer Aided Manufacturing
Application Solution: 3D Inspection Automation with SA
Peak Automation ALM-Mini Automated Test Handler
Scanners – Robots – Measurement Plans Synergy in Motion
CAD Design Part 2 AE460 Greg Marien Lecturer.
© 2014 Autodesk MEP Fabrication Detailing in Autodesk® Revit® MEP 2016 Julien Drouet BIM Technical Specialist – MEP, Construction & MEP Fabrication.
Integrated CAD-Metrology and Alignment of Key Features of A380 Wings
Presentation transcript:

July 2004 Use menu "View - Header & Footer" for Presentation title - Siglum - Reference Integrated CAD-Metrology and Alignment of Key Features of A380 Wings 2004 Coordinate Measurement System Committee Presented by Geraint Jones Airbus UK Lead Metrology Engineer Scott Sandwith New River Kinematics Metrology Software Engineer

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 2 Introduction – A380 Metrology at Broughton Measurement Systems  Laser Trackers –Alignments of kinematic mechanisms  Laser Radar Scanner –Direct measurement of performance and interface features Assembly of the Airbus A380 Wing  Build and Inspect directly to features Integrate Metrology Systems and CAD Optimize Build and Inspection of Wing Performance Features Software Platform  Graphical environment and reports  Relationship Fitting  optimize part alignment to CAD  Confident product configuration and communication

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 3 LSM systems used on A380 and why Current systems used on the A380 Project at Airbus Broughton are Laser trackers (7) and a laser radar (1) The laser tracker instrument was procured because:- It is highly versatile It’s performance is commensurate with the range of design specifications It’s ability to track and therefore build The Laser radar was procured because:- It’s ability to measure in a targetless fashion It’s ability to mostly automate the data gathering process It’s ability to measure large amounts of data quickly It’s performance is commensurate with the range of design specifications

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 4 Measured features on an A380 Wing set A total of 96 planned measurement tasks per wing set! 60% involve building routines as well as inspection SPOILERS x 16 AILERONS x 6 FLAP BEAMS x 10 ENGINE PYLONS x 4 OVERWING PANEL x 2 UNDERWING PANEL x 2 WING ROOT x 2 WING TWIST x 2 FALSEWORK X 4 FLAP TRACK FAIRINGS X 48 Laser Radar Laser tracker

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 5 Measured features on an A380 Wing set Engine Pylon Geometry Forks Thrust Spigot Aft fitting Aims: -To inspect the position of the Forks in the X direction -To inspect the position of the Aft fitting in the Y direction -To inspect the orientation of the Forks to the engine thrust line

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 6 Measured Features on an A380 Wing set Wing Tip Falsework X Z Y Surface A Surface B Aim: To blend profile of surface A into surface B From an initial alignment the relationships function allows a fine adjustment of the translation in Z and rotation around X.

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 7 Stage 02 Measurement requirement LR200 Rear spar Front spar Centre spar Bottom skin profile Top skin profile Junction to Wing box/fuselage Wing Root Measurement Aims: To measure top and bottom skin surface profiles and to measure spar orientation with respect to the CAD model = Datum reference points

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 8 Stage 02 Measurement requirement Wing Incidence Aim: To understand the extent and sense of rotation of the aerofoil - Wing set as well as asymmetrical tolerance - Incidence is measured via 6 opposing pairs of points per wing =Measured points using hidden point device Incidence primary datum Incidence Nose up tolerance Incidence Nose down tolerance

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 9 Future metrology software requirements at Airbus HINGE LINE FITTING TODAY LEAST SQUARES FITTING MULTIPLE SOLUTIONS SKILLFULL OPERATORS REQUIRED HINGE LINE FITTING OPTIMISED ATTRIBUTEY EYES/NO SOLUTION REQUIRED FITTING RESIDUALS STORED FOR LATER USE EASIER AND POSITIVE SCRIPTING OPTIONS & OUTCOME S ELECTRONI C GAUGING SOLUTION = ELECTRONIC GAUGING

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 10 Measurement Control Measurement Control with CAD Model Driven Assembly  Build/Inspect direct to model definition produces common results Minimal secondary support tooling (e.g. Shop Aids and Targeting)  Model controls conformance  Tolerances are relative to features  Pragmatic GD&T with feature to feature relationships Quality Procedures  Graphical Reports  improves communication  SPC Charting yields process control  Unified Spatial Metrology Network to ensure process capabilities Feature based alignment strategies  Relationship Fitting  direct alignment of measurements and instruments to model

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 11 Model Driven Verification with Integrated Metrology Automated inspection of critical interface features with Laser Scanner

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 12 Model Driven Assembly Kinematics mechanism alignment directly to CAD

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 13 Hinge Line Alignment Reporting Working Frame Bull's-eye Charts Showing Hinge Line Tolerances and Results

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 14 Integrating Measurement Technologies - USMN USMN – Network Optimization  Determine real-world uncertainty fields for Points and Features  Characterize actual instrument uncertainty performance from Shop Floor Surveys  Take advantage of relative uncertainty of measurement components Multiple Instrument Network  Scanner + Tracker  Systems operate synchronously in a cooperative network aligned with USMN  USMN orientation produces optimal results  Traceable uncertainty estimates for Points, Instruments, and Features Manage Measurement Uncertainties – Confidence  Graphical Reports  Communicate  Process Improvements  Geometric fitting uncertainty (sphere, line, plane, cylinder, etc)

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 15 Metrology Confidence with USMN on Wing Survey

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 16 Hinge Line Targeting Uncertainty Extrapolation Pt Targeting Expands Uncertainty Uncertainty Expanded by 23%

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 17 Hinge Line Targeting Uncertainty Mid Pt Targeting Reduces Uncertainty Uncertainty Reduced by 16%

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 18 Relationship Fitting Methodology Align critical features within the A380 wing system:  Model interdependence  Relative importance with weighting  Interaction between key kinematic mechanisms and critical interface features  Each relationship has an inherent local reporting frame Best-Fit Weighted Relationships  As-Built configuration is optimized to its nominal CAD model on the shop floor  Simultaneously fits the constraints defined by the relationships  Relative importance of each constraint is controlled using weights set by the production team

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 19 Scanner Survey Optimized to CAD Relationship Fitting: Interface Feature Alignment

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 20 Relationship Fitting: Hinge Line Kinematics Optimize Hinge Line Configuration + Build to Nominal

© AIRBUS UK LTD All rights reserved. Confidential and proprietary document. Month 200X2004 Coordinate Measurement System CommitteePage 21 Q & A session