Montreal AeroPlus Proprietary Information 15 Jan 2009 1 Page 1 Supplied in confidence to Frontier Flying Service Inc. as part of contract specified in.

Slides:



Advertisements
Similar presentations
PIPISTREL d.o.o. AJDOVSCINA GORISKA CESTA 50 A SI-5270 AJDOVSCINA
Advertisements

Rice Cooker Project Integration Phase Integration of Hardware and Software.
Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
Total HVAC Control from anywhere Easy control that can save a fortune
Perspective SR-22 Electrical System
E- P O D I U M (Model : KPC-390 ) Cinesonic Audio Visual Pvt. Ltd.
CAB, CHASSIS, AND TRAILER WIRING SYSTEMS. SUB-SYSTEMS l Main Cab Harness Receives power from Batteries Has Fuses and Circuit Breakers Feeds power to other.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
FEATURES – Displays the job features on the screen. Additional features are available by touching the tabs. TOUCH SCREEN – displays all the available features.
5/13/ Assembling and Testing Your Robot. 5/13/2015 Mounting the Topside Hardware  Parts Boe-Bot Chassis (1) Standoffs (4) 1/4” 4-40 Screws (4)
Power-Fill Operation Demonstration Power-Fill Operation Demonstration (See Installation and Operation Manual for detailed instructions)
Assembly Manual Mike Fortney 04/02/2006 CricketSat Receiver.
REAL-TIME SOFTWARE SYSTEMS DEVELOPMENT Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
1 Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #08 Gateway To Space ASEN / ASTR 2500 Class #08.
3pb Engine Start Battery #1 8d type + - House Battery 12 volt Bank #2 (6 - 6 volt golf cart) + - SW #1 1,2 Both 300A SW #2 1,2 Both 200A AC Gen. Main Eng.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
Frankford Radio Club Antenna Selection via Touchscreen.
Assembly of Conductivity Flow Loop EAS 199B living with the lab (in preparation for calibrating conductivity sensor)
June 2008 R&D Center / BCS HW Team Introduction to iPECS P5 Hardware.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Symmetra ® LX – redundant UPS High performance, redundant.
Remy Product Catalog Product Search/Cross References Product Details Application Search Model Search Service Parts.
Circuit Design Magic of Electrons © 2011 Project Lead The Way, Inc.
The Accentuator A Wireless Annotator on Steroids Projection Perfection A Wireless Remote That Does it All Designed for Professionals.
APPROVED TRAINING MANUAL’S LESSON PLANS AND COURSEWARE STAR MARIANAS AIR, INC. Recurrent – Flight Crew Part III – Aircraft Ground Training Section 2 –
Introduction In this power point I will tell people computer equipment and how you use them and how they work.
First Steps with Eagle PCB by Keith Barrett - Pakuranga College, Auckland, New Zealand v.
Exploring Your Desktop To run presentation, please click on bottom arrow to right to change to next frame.
Page 1 March 2007 CheckSource 2.3 Portable Power Phantom Load.
1 Security Systems ST-CO/GP | 11/21/2006 | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights.
Find the software in the PC  C:/PTmonitor/monitoring.
TITLE: MODEL: DATE: REV. NO.: DRAWING NO.: MRP#: BILGE HARNESS 30 MS PILOT PACER MARINE ENGINEERING, INC APEX RD. SARASOTA, FL PAGE.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Computer Components.
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
Powered Flight Syllabus #1 CAP O-Rides Squadron 85.
1 Security Systems ST-CO/GP | 11/21/2006 | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights.
Template version: 04 Barco LiveDots LCD Kiosks © 2014 Barco LiveDots – All rights reserved - CONFIDENTIAL Sept 2014.
Preliminary Design Review Your Logo Here Team Leader: Thomas C. Null, III Team Members: Andrew Tomlinson, Matthew Gunter Faculty Advisor: Dr. Roger King.
Trey Herrington Electrical Engineer - Backup Power Supply - Backup Power Supply - PCB Design - PCB Design Samantha Prine Electrical Engineer -Enclosure.
Trey Herrington Electrical Engineer - Backup Power Supply - Backup Power Supply - PCB Design - PCB Design Samantha Prine Electrical Engineer -Enclosure.
Design Team : Advisor: Dr. Edwin Project Web Site: Client: Paul
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
News from LAL on Vacuum System Racks for cryotraps: call for tender done provider selected purchase of electro-tech components in progress prototype expected.
Computer Literacy for IC 3 Unit 2: Using Productivity Software Chapter 9: Creating a Presentation © 2010 Pearson Education, Inc. | Publishing as Prentice.
Multimeter. What is it? A multimeter can be a hand-held device useful for basic fault finding and field service work, or a bench instrument which can.
Expectations Be sitting quietly in your assigned seat when the tardy bell rings. This semester you will need a folder to keep up with work for this.
Circuit Design Circuit Design Gateway To Technology®
SC2004 Exhibit Status. Proposed Schedule Exhibit ships from SLAC 7/22 Arrive Fermilab 7/29 Fermilab Quantum Universe display opens 10/1 Ship date to SC2004.
Initial Pilot Ground School
1 ALARMLINC. 2 OVERVIEW Expanding Situational AwarenessOVERVIEW.
MSA Passport  Personal Alarm Combustible gases and vapors Oxygen enriched Oxygen deficient Specific Toxic gases Alarm levels are set at the factory.
Build on a Breadboard Simulator
GLAST Large Area Telescope:
Circuit Design Circuit Design Gateway To Technology®
Integration & Commissioning
installing electrical system
Mobile Cellular Communications System
PLC Hardware Components.
What is Arduino? By James Tedder.
Windows 7                      .
Circuit Design Circuit Design Gateway To Technology®
PLC Hardware Components.
Thales Alenia Space Competence Center Software Solutions
Total HVAC Control from anywhere Easy control that can save a fortune
PSS verification and validation
Green arrows show main exit routes for people leading to congestion
LCLS Undulator System Production Management
Basic Electrical Circuits
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

Montreal AeroPlus Proprietary Information 15 Jan Page 1 Supplied in confidence to Frontier Flying Service Inc. as part of contract specified in QT128 MAP-810F Progress Report for Frontier Flying Service 15 Jan 2008

Montreal AeroPlus Proprietary Information 15 Jan Page 2 Supplied in confidence to Frontier Flying Service Inc. as part of contract specified in QT128 Panel Status Components assembled into Instrument panel in preparation for wiring and testing with X-Plane. Note: Panel will be painted and lettering added following Test assembly of all components to verify position and size of all mounting holes. CDR Panel Baseline (CDR package Slide Section 4b_B #24)

Montreal AeroPlus Proprietary Information 15 Jan Page 3 Supplied in confidence to Frontier Flying Service Inc. as part of contract specified in QT128 Collage showing Panel with representative Monitors and image.

Montreal AeroPlus Proprietary Information 15 Jan Page 4 Supplied in confidence to Frontier Flying Service Inc. as part of contract specified in QT128 New Panel Moved to ATC-810 Base for Integration

Montreal AeroPlus Proprietary Information 15 Jan Page 5 Supplied in confidence to Frontier Flying Service Inc. as part of contract specified in QT128 Interface Boards and Wiring

Montreal AeroPlus Proprietary Information 15 Jan Page 6 Supplied in confidence to Frontier Flying Service Inc. as part of contract specified in QT128 Instrument Panel CDR Baseline Avionics Master Switch Light Controls Master Battery, Master Alternator Left Engine Mags Engine Starter, Right Engine Mags, Left Alt, Right Alt Pitot, De-Ice, Left and Right Fuel Pumps Seat Belts, No Smoking Flap Lever Sim Key Switch and HOBBS Headset Jacks

Montreal AeroPlus Proprietary Information 15 Jan Page 7 Supplied in confidence to Frontier Flying Service Inc. as part of contract specified in QT128 Enclosure Changes Required as provided in CDR package

Montreal AeroPlus Proprietary Information 15 Jan Page 8 Supplied in confidence to Frontier Flying Service Inc. as part of contract specified in QT128 Visual Monitor Setup Visual Arranged for single Pilot. - Field of View Centered on Pilot Eye Point. - Monitors arranged symmetrically around Design eye point. - Field of View = 150 degrees - Monitors arranged with at 30 degrees intervals.

Montreal AeroPlus Proprietary Information 15 Jan Page 9 Supplied in confidence to Frontier Flying Service Inc. as part of contract specified in QT128 Enclosure Concept  Computers Stacked under “Visual Overhang”  KVM and Network switch sit on Shelf above computers.  On-Off Buttons easily accessible for sim start up.  Requires min. 110VAC wall plug

Montreal AeroPlus Proprietary Information 15 Jan Page 10 Supplied in confidence to Frontier Flying Service Inc. as part of contract specified in QT128 Base and Enclosure Design

Montreal AeroPlus Proprietary Information 15 Jan Page 11 Supplied in confidence to Frontier Flying Service Inc. as part of contract specified in QT128 Visual Monitor Current Design Note: Monitor Mounts likely to change to commercially available mounts.

Montreal AeroPlus Proprietary Information 15 Jan Page 12 Supplied in confidence to Frontier Flying Service Inc. as part of contract specified in QT128 Next Steps HW / SW Integration – Finish Fitting of parts – Electrical Wiring Completion – Power testing of interface boards and electronics – Hardware Integration with X-Plane Software Painting and Detailing – Dismantle Assembly – Paint Panel and Silk Screen Lettering. – Re-assembly Testing – Verify performance against requirements Crate and Ship (Date: TBD) On-site Installation and Testing