Advanced Construction & Maintenance Modeling [ARE 520] 1 The Use of AHP in Risk Ranking and Maintenance Planning for Cross-country Pipelines ARE 520 TERM.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

The Robert Gordon University School of Engineering Dr. Mohamed Amish
Engineering Diploma Level 2 Unit 7 Application of Maintenance Techniques in Engineering In this unit you will get involved with both maintenance procedures.
On the way to an effective regulatory framework of pipeline safety The WP-6 sectoral initiative on pipeline safety Prepared by Sergey Mokrousov.
1)List and briefly describe the three project quality management processes. Quality Planning: Identify which quality standards are relevant to project.
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
Software Quality Assurance Plan
Auditing Computer Systems
Engineering Economic Analysis Canadian Edition
Learning Objectives  Recognize the need for an investigation  Investigate the scene of the accident  Interview victims & witnesses  Distinguish.
Overview Lesson 10,11 - Software Quality Assurance
6/23/2015 Risk-Informed Process and Tools for Permitting Hydrogen Fueling Stations Jeffrey LaChance 1, Andrei Tchouvelev 2, and Jim Ohi 3 1 Sandia National.
Chapter 8 Risk Analysis Management of Computer System Performance.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT RISK ACCEPTANCE CRITERION 2.
On Cost-benefit Evaluation Methods of Government- invested IT Projects CNAO's Wuhan Resident Office Haiyan zhang.
Marketing Research Aaker, Kumar, Day Seventh Edition Instructor’s Presentation Slides.
DELIVERING SAFE & RELIABLE OPERATION
Syed M. Ahmed, Ph.D. Department of Construction Management Risk Management in Construction Syed M. Ahmed, Ph.D. Department of Construction Management Florida.
NACMPI November 15-16, 2005 Risk-Based Inspection Dr. Barbara Masters Administrator, Food Safety and Inspection Service Philip Derfler Assistant Administrator,
Computerized Multiple Criteria Decision Making Model for Projects Planning and Implementation By Ali Reda Al-Jaroudi Presented by: Jihad Farhat.
TECHNICAL ASSOCIATION OF THE EUROPEAN NATURAL GAS INDUSTRY Development of a Eurogas-Marcogaz Methodology for Estimation of Methane Emissions Angelo Riva.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
«Enhance of ship safety based on maintenance strategies by applying of Analytic Hierarchy Process» DAGKINIS IOANNIS, Dr. NIKITAKOS NIKITAS University of.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 27 Slide 1 Quality Management 1.
Dr. Engr. Sami ur Rahman Assistant Professor Department of Computer Science University of Malakand Research Methods in Computer Science Lecture: Research.
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
9 Closing the Project Teaching Strategies
Using Network Simulation Heung - Suk Hwang, Gyu-Sung Cho
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
Risk-Informed In- Service Inspection (RI-ISI) Ching Guey.
Aaker, Kumar, Day Eighth Edition Instructor’s Presentation Slides
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Unit 8 Syllabus Quality Management : Quality concepts, Software quality assurance, Software Reviews, Formal technical reviews, Statistical Software quality.
Quality Function Deployment in Maintenance Work Planning by S.O.Duffuaa, A.H.Al-Ghamdi, A.Al-Amer.
Introduction Time Quality Cost Project Constraints Success Introduction.
Guidance Notes on the Investigation of Marine Incidents
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS DHAHRAN, SAUDI ARABIA ARE-512 Life Cycle Costing – Cost Data Bank For By G. C. SOFAT S.K. TYAGI Presented.
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
The aim / learning outcome of this module is to understand how to gather and use data effectively to plan the development of recycling and composting.
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
1 Unit 1 Information for management. 2 Introduction Decision-making is the primary role of the management function. The manager’s decision will depend.
Management & Development of Complex Projects Course Code MS Project Management Perform Qualitative Risk Analysis Lecture # 25.
Engineering Economic Analysis Canadian Edition
Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
9. Applying scientific tools & techniques for improving customer satisfaction.
EQE International The use of Fragility Analysis in Seismic Safety Cases for Nuclear Power Stations.
Project Risk Management Planning Stage
Preliminary Analysis of Alternatives for the Long Term Management of Mercury John Vierow Science Applications International Corp. Reston, VA May 1, 2002.
What’s Wrong with Integrity Management? How Do We Improve Integrity Management? Terry Boss Senior Vice President Safety Environment and Operations PST.
RISK MANAGEMENT YULVI. Introduction Time Quality Cost Project Constraints Success Introduction.
Information Security Governance and Risk Chapter 2 Part 2 Pages 69 to 100.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Risk Assessment and Risk Management James Taylor COSC 316 Spring 2008.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Failure Modes, Effects and Criticality Analysis
A Predictive Maintenance Strategy based on Real-Time Systems
8.1 Plan Quality Management
Overview of Post-Project Evaluation in NEDO
Risk Assessment OSHA 21/09/ WHAT IS RISK ASSESMENT? Risk Assessment is the process of determining the possibility of short and long term unfavorable.
EQE International The use of Fragility Analysis in Seismic Safety Cases for Nuclear Power Stations.
Improvement Selection:
Flooding Walkdown Guidance
Air Carrier Continuing Analysis and Surveillance System (CASS)
Accident Investigation
Presentation transcript:

Advanced Construction & Maintenance Modeling [ARE 520] 1 The Use of AHP in Risk Ranking and Maintenance Planning for Cross-country Pipelines ARE 520 TERM PAPER PRESENTATION (Term 021) PREPARED FOR DR. SADI A. ASSAF BY AHMED D. IBRAHIM (210185) 06 JANUARY 2003

Advanced Construction & Maintenance Modeling [ARE 520] 2 AGENDA INTRODUCTION OBJECTIVE OF THE PAPER PREVIOUS STUDIES RESEARCH METHODOLOGY STUDY DATA DISCUSSIONS OF RESULTS CONCLUSIONS AND RECOMMENDATIONS

Advanced Construction & Maintenance Modeling [ARE 520] 3  Cross-country pipelines are the most efficient, safest, environmentally friendly, and economical way to ship hydrocarbons over long distances.  Transports significant portion of many nations’ energy requirements  Economies depend on their smooth and uninterrupted operation  Failure could lead to substantial losses  to the overall national economy and  may even pose environmental hazards to humans For Example:  Saudi Aramco operates around 17000KM of cross-country pipelines  Most are over 25 years old and passes through residential areas of the Eastern province of Saudi Arabia. Introduction

Advanced Construction & Maintenance Modeling [ARE 520] 4  Failure can be very catastrophic. Hopkins, (1994) reports that:  51 people were burnt to death in Venezuela in 1993  A 914mm pipeline in New Jersey in 1994 caused a loss of one life and injuries to over 50 people  Similar failures have occurred in the UK, Canada, Russia, Pakistan, and India  Operators are continually developing in-house maintenance policies to replace the rules-of-thumb inspection and maintenance practices.  There are modern methodologies which ensure the structural integrity of an operating pipeline without taking it out of service [Jamieson, 1986]. Introduction

Advanced Construction & Maintenance Modeling [ARE 520] 5  Develop a model for ranking the risk level associated with operating cross-country pipelines in order to be able: to predict the likelihood of failure and estimate their severity  For the purpose of annual maintenance planning Objective of the paper

Advanced Construction & Maintenance Modeling [ARE 520] 6 Previous Studies Causes of pipeline failure: Failure causes Outside forcesMechanical damage Ground movement Metal loss corrosion External Internal CracksEnvironmental Materials and fabrication Others (e.g. operational error, mechanical component failure Source: Caseley, 1994

Advanced Construction & Maintenance Modeling [ARE 520] 7 Biagiotti and Goose (2000): Previous Studies Risk-based Decision-making

Advanced Construction & Maintenance Modeling [ARE 520] 8 The total failure cost of pipelines consists of several components:  Cost of lost product  Loss of revenue  Cost of the pipeline repair or replacement  Liability costs  Property damage costs  Socio-political costs  Benefit of replacing the pipe segment. The first six items are added and the seventh is subtracted therefrom. Previous Studies

Advanced Construction & Maintenance Modeling [ARE 520] 9 Methods of risk-based planning of pipeline maintenance The approaches can be classified into two major categories: 1.Subjective Index Methods – qualitative approaches 2.Quantitative Risk Assessment a.Consequence estimation b.Probability estimation Previous Studies

Advanced Construction & Maintenance Modeling [ARE 520] 10 Research Methodology  A comprehensive listing of failure causes were compiled from  Literature  Interview with 5 engineers having over 30 years experience in pipeline engineering, operation and maintenance.  Evaluation data such as repair history, inspection records, design parameters and current operating conditions were collected.  AHP model of these failure causes was built  A top-down pairwise comparison was conducted by the engineers to determine the likelihood of pipeline failure.  Elements at the first criteria level were compared, followed by pairwise comparison at the sub-criteria level and then finally the alternative level

Advanced Construction & Maintenance Modeling [ARE 520] 11 Research Methodology  The costs of failure of the pipelines under study were estimated for each failure cause: Based on previous failure costs Other industry resources  Monte Carlo simulation method, using the RandDiscrete function of a RiskSim spreadsheet, was utilized to determine the total possible cost of failure using Estimated failure costs Probabilities generated for each pipeline by the AHP model

Advanced Construction & Maintenance Modeling [ARE 520] 12 Study Data  The pipelines under study, are operated and maintained by Saudi Aramco.

Advanced Construction & Maintenance Modeling [ARE 520] 13 Study Data The major categories of pipeline failure are: 1.Corrosion – internal or external depending on the location of initiation on the pipeline. 2. Mid-wall defects - stress corrosion cracking and hydrogen induced cracking. 3. External interference – malicious (sabotage or pilferage), third party or natural calamities 4.Construction and Materials defect 5.Operational problems – human and operational error, equipment malfunction. 6. Loss of ground support 7. Others

Advanced Construction & Maintenance Modeling [ARE 520] 14 AHP Model

Advanced Construction & Maintenance Modeling [ARE 520] 15 Results and Discussions  Corrosion contributes 48.3% to the likelihood of a pipeline failure.  This corroborates with the real situation as indicated by the company experts and with global trend.  External interference, sometimes called 3rd party damage, follows with 20.7% likelihood of a failure. Pairwise comparison for the 1st level shows:

Advanced Construction & Maintenance Modeling [ARE 520] 16 Results and Discussions  External corrosion (80%) has more impact on pipeline failure than internal corrosion (20%).  Hydrogen-induced cracking contribute 83.3% of the pipeline failure due to mid-wall defects whereas stress corrosion cracking contributes 16.7%.  Failure of protection devices is more likely to cause a pipeline failure than operational or human error because of sophistication in the protection systems and strong operator training programs  Material defects showed a percentage of 80% over construction defects (20%). This is explained by the strong controls that are well established for pipeline construction industry. Pairwise comparison for the 2nd level shows that:

Advanced Construction & Maintenance Modeling [ARE 520] 17 Results and Discussions Synthesis of the AHP model was performed.

Advanced Construction & Maintenance Modeling [ARE 520] 18 Results and Discussions  Summary of the final outcomes of each pipeline against the risk factors are shown in the next slide  Both the local and global probabilities of each of the nine pipelines were computed against each of the risk factors.

Advanced Construction & Maintenance Modeling [ARE 520] 19

Advanced Construction & Maintenance Modeling [ARE 520] 20 Results and Discussions

Advanced Construction & Maintenance Modeling [ARE 520] 21 Results and Discussions

Advanced Construction & Maintenance Modeling [ARE 520] 22 Results and Discussions Summary of the likelihood and severity (in terms of cost) of pipeline

Advanced Construction & Maintenance Modeling [ARE 520] 23  This paper describes the use of AHP / Monte Carlo simulation to determine the risk level associated with operating the cross-country pipelines.  The study reveals the effect of certain risk factors on the failure of pipelines/pipeline sections.  The developed model will enable management formulate cost-effective, customized, flexible and systematic maintenance program Conclusions

Advanced Construction & Maintenance Modeling [ARE 520] 24 The risk level obtained in terms of monetary values should be a basis for maintenance planning and prioritization of pipelines More attention should be given to pipelines that have higher failure consequences even though they have less likelihood of failure. A semi-annual meeting should be held with representatives of operation, maintenance, and engineering departments to share ideas and in deciding the criteria and for pairwise comparison. A further work on the calculation of the benefits versus cost ratio of the recommended maintenance strategy is recommended. The sensitivity analysis feature available in the expert choice can be used to resolve the conflicts that may occur when a team is assigned to conduct the pairwise comparison. Recommendations

Advanced Construction & Maintenance Modeling [ARE 520] 25 THANK YOU COMMENTS