11-Interest Rate Risk. Review  Interest Rates are determined by supply and demand, are moving all the time, and can be difficult to forecast.  The yield.

Slides:



Advertisements
Similar presentations
CHAPTER 4 BOND PRICES, BOND YIELDS, AND INTEREST RATE RISK.
Advertisements

Interest Rate Markets Chapter 5. Chapter Outline 5.1 Types of Rates 5.2Zero Rates 5.3 Bond Pricing 5.4 Determining zero rates 5.5 Forward rates 5.6 Forward.
Asset/Liability Management
1 15-Option Markets. 2 Options Options are contracts. There are two sides to the contract Long Side (option holder): Pays a premium upfront Gets to “call.
BOND VALUATION AND RISK 1. ■ Bonds are debt obligations with long-term maturities that are commonly issued by governments or corporations to obtain long-term.
Interest-Rate Risk II. Duration Rules Rule 1: Zero Coupon Bonds What is the duration of a zero-coupon bond? Cash is received at one time t=maturity weight.
7-1 CHAPTER 7 Bonds and Their Valuation Key features of bonds Bond valuation(price) Measuring yield(return) Assessing risk.
Interest Rate Risk. Money Market Interest Rates in HK & US.
1 Yield Curves and Rate of Return. 2 Yield Curves Yield Curves  Yield curves measure the level of interest rates across a maturity spectrum (e.g., overnight.
I.N. Vestor is the top plastic surgeon in Tennessee. He has $10,000 to invest at this time. He is considering investing in Frizzle Inc. What factors will.
Bond Price Volatility Zvi Wiener Based on Chapter 4 in Fabozzi
Understanding Interest Rates
Part Two Fundamentals of Financial Markets. Chapter 3 What Do Interest Rates Mean and What Is Their Role in Valuation?
Understanding Interest Rates
06-Liquidity Preference Theory. Expectations Theory Review Given that Expectations Theory: – Given that we want to invest for two years, we should be.
Duration and Convexity
Managing Bond Portfolios
05-Expectations Hypothesis
Managing Interest Rate Risk (I): GAP and Earnings Sensitivity
MANAGING INTEREST RATE RISK: DURATION GAP AND MARKET VALUE OF EQUITY
Pricing Fixed-Income Securities. The Mathematics of Interest Rates Future Value & Present Value: Single Payment Terms Present Value = PV  The value today.
QA-1 FRM-GARP Sep-2001 Zvi Wiener Quantitative Analysis 1.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved Chapter Seven Asset-Liability Management: Determining and Measuring Interest Rates.
Asset and Liability Management Interest Rate Risk Management.
International Fixed Income Topic IB: Fixed Income Basics - Risk.
CHAPTER 15 The Term Structure of Interest Rates. Information on expected future short term rates can be implied from the yield curve The yield curve is.
Pricing Fixed-Income Securities
17-Swaps and Credit Derivatives
Yields & Prices: Continued
Chapter 4 Pricing Fixed-Income Securities
FRM Zvi Wiener Following P. Jorion, Financial Risk Manager Handbook Financial Risk Management.
Managing Liquidity Banks can experience illiquidity when cash outflows exceed cash inflows. They can resolve any cash deficiency either by creating additional.
Copyright 2015 by Diane S. Docking 1 Bond Valuation.
FINC4101 Investment Analysis
Using Options and Swaps to Hedge Risk
Fixed-income securities. A variety of fixed-income securities, I Interest-bearing bank deposit: (1) saving account, (2) certificate of deposit (CD, a.
Copyright © 2012 Pearson Prentice Hall. All rights reserved. CHAPTER 3 What Do Interest Rates Mean and What Is Their Role in Valuation?
Duration and Portfolio Immunization. Macaulay duration The duration of a fixed income instrument is a weighted average of the times that payments (cash.
BOND PRICES AND INTEREST RATE RISK
Managing Bond Portfolio
Week-3 Into to Interest Rates Money and Banking Econ 311 Tuesdays 7 - 9:45 Instructor: Thomas L. Thomas.
Business F723 Fixed Income Analysis Week 5 Liability Funding and Immunization.
Chapter Seven Risk Management for Changing Interest Rates: Asset-Liability Management and Duration Techniques McGraw-Hill/Irwin Copyright © 2010 by The.
Class #6, Chap 9 1.  Purpose: to understand what duration is, how to calculate it and how to use it.  Toolbox: Bond Pricing Review  Duration  Concept.
McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 16 Managing Bond Portfolios.
1 FIN 2802, Spring 08 - Tang Chapter 16: Managing Bond Portfolios Fina2802: Investments and Portfolio Analysis Spring, 2008 Dragon Tang Lecture 12 Managing.
VALUATION OF BONDS AND SHARES CHAPTER 3. LEARNING OBJECTIVES  Explain the fundamental characteristics of ordinary shares, preference shares and bonds.
PRICING SECURITIES Chapter 6
Chapter 4 Understanding Interest Rates. Learning Objectives Calculate the present value of future cash flows and the yield to maturity on credit market.
Exam FM/2 Review Cash Flows, portfolios, duration, & immunization
Intermediate Investments F3031 Passive v. Active Bond Management Passive – assumes that market prices are fairly set and rather than attempting to beat.
Chapter Twelve Asset-Liability Management: Determining and Measuring Interest Rates and Controlling Interest-Sensitive and Duration Gaps.
Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter Three Interest Rates and Security Valuation.
Fixed Income Basics - part 2 Finance 70520, Spring 2002 The Neeley School of Business at TCU ©Steven C. Mann, 2002 Forward interest rates spot, forward,
CHAPTER 5 BOND PRICES AND INTEREST RATE RISK. Learning Objectives Explain the time value of money and its application to bonds pricing. Explain the difference.
Fundamentals of the bond Valuation Process The Value of a Bond.
Fixed Income Analysis Week 4 Measuring Price Risk
Ch.9 Bond Valuation. 1. Bond Valuation Bond: Security which obligates the issuer to pay the bondholder periodic interest payment and to repay the principal.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved Chapter Seven Asset-Liability Management: Determining and Measuring Interest Rates.
Copyright © 2000 by Harcourt, Inc. All rights reserved Chapter 16 Interest Rate Risk Measurements and Immunization Using Duration.
1 Ch. 11 Outline Interest rate futures – yield curve Discount yield vs. Investment Rate %” (bond equivalent yield): Pricing interest rate futures contracts.
1 Not To Be Naïve about Duration 1.The duration D we have been discussing also known as Macaulay duration. 2.First derivative of price-yield curve is and.
Real Estate Finance, January XX, 2016 Review.  The interest rate can be thought of as the price of consumption now rather than later If you deposit $100.
Stock & Bond Valuation Professor XXXXX Course Name / Number.
Chapter 5 :BOND PRICES AND INTEREST RATE RISK Mr. Al Mannaei Third Edition.
Chapter 6: Pricing Fixed-Income Securities 1. Future Value and Present Value: Single Payment Cash today is worth more than cash in the future. A security.
Chapter 3 Understanding Interest Rates. Present Value : Discounting the Future A dollar paid to you one year from now is less valuable than a dollar paid.
INVESTMENT ANALYSIS & PORTFOLIO MANAGEMENT
CHAPTER SIX Asset-Liability Management: Determining and Measuring Interest Rates and Controlling a Bank’s Interest-Sensitive And Duration Gaps The purpose.
Presentation transcript:

11-Interest Rate Risk

Review  Interest Rates are determined by supply and demand, are moving all the time, and can be difficult to forecast.  The yield curve is generally upward sloping  Interest Rate Risk: The uncertainty surrounding future interest rates. Unforeseen parallel shifts in the yield curve Unforeseen changes in the slope of the yield curve Our Focus

Where We are Going  Dollar Gap Method to understand the impact of interest rate risk on bank profits Simple, and requires some ad-hoc assumptions Not discussed in Bodie-Kane-Marcus  Duration Method to understand the impact of interest rate risk on the value of bank shareholder equity More elegant and mathematically intense The focus of the reading in Bodie-Kane-Marcus Used extensively as well by bond traders

Interest Rate Risk  Banks assets Generally long-term, fixed rate  Bank liabilities Generally short term, variable rate  Impact on profits: Rates increase  Interest received stays fixed  Interest paid increases  Profits decrease

Interest-Rate Sensitive  An asset or liability whose rate is reset within some “short period of time” e.g days, 1-year, etc.  Interest rate sensitive assets:  Short-term bond rolled over into other short-term bonds  Variable rate loans  Interest rate sensitive liabilities:  Short-term deposits

Interest-Rate Risk Example  Assets: 50 billion 5B IRS; rate = 8% per year  Liabilities: 40 billion 24B IRS; rate = 5% per year  Profits ($billion) 50(.08)-40*(.05) = 2

Parallel Shift in Yield Curve  Suppose all rates increase by 1%  Assets IRS (5B): rate = 9% Not IRS (45B): rate = 8%  Liabilities IRS (24B): rate = 6% Not IRS (16B): rate = 5%

Profits After Rate Increase  Interest Expenses ($billion) 16(.05)+24(.06)=2.24  Interest revenues ($billion) 5*(.09)+45*(.08)=4.05  Profits Before: 2 billion After: =1.81 billion Decrease: 0.19 billion or 9.5% drop in profits (1.81/2)-1=.095

Gap Analysis  Gap = IRSA – IRSL  IRSA = dollar value of interest rate sensitive assets  IRSL = dollar value of interest rate sensitive liabilities

Gap  From Previous Example IRSA (millions) = 5 IRSL (millions) = 24  Dollar Gap (millions): 5 – 24 = -19  Change in profits= Dollar Gap i  From previous example: Change in profits (millions) -19 .01 = -0.19

Gap Analysis  If the horizon is long enough, virtually all assets are IRS  If the horizon is short enough, virtually all assets become non-IRS  No standard horizon

Dollar Gap Summary Dollar GAPiProfits NegativeIncreaseDecrease NegativeDecreaseIncrease PositiveIncreaseIncrease PositveDecreaseDecrease Zero EitherZero

What is the right GAP?  One of the most difficult questions bank managers face  Defensive Management Reduce volatility of net interest income Make Gap as close to zero as possible  Aggressive Management Forecast future interest rate movements If forecast is positive, make Gap positive If forecast is negative, make Gap negative

Problems with Gap  Time horizon to determine IRS is ambiguous  Ignores differences in rate sensitivity due to time horizon  Focus on profits rather than shareholder wealth

Building a Bank Suppose you are in the process of creating a bank portfolio. Shareholder equity: $25 million You’ve raised $75M in deposits (liabilities) You’ve purchased $100M in 30-yr annual coupon bonds (assets)

Bank Equity and Interest Rates Assets 30-yr bonds – FV: $100M – Coupon rate: 1.8% – YTM=1.8% Liabilities Deposits – $75M – Paying 1% per year Annual profits: $1.8M - $0.75M = $1.05M Rate on bonds is fixed – no matter how rates change. Rate on deposits resets every year.

Gap Analysis IRSA – IRSL = 0 – 75M = -75M Assume rates increase by 10 basis points We must now pay 1.1% on deposits Change in profits: -75M(.001) = -75,000 – Profits down 7% = 75K/1.05M

Gap Analysis One Solution: To protect profits from interest rate increases, sell your holdings in the long term bonds and buy shorter term bonds But since yield curve is usually upward sloping (liquidity risk-premiums), shorter term bonds will usually earn lower yields. Result: Lower profits

Manager’s Objective Managers should probably not be concerned about protecting profits. Instead, should be concerned about protecting value of shareholder equity: the value shareholders would get if they sold their shares.

Market Value of Bank Assets Before Rates Increase: Assets =$100M After rate increase? – Bank is earning 1.8% on 30-yr bonds – Other similar 30-year bonds are paying a YTM of 1.9% - Market value of bank assets: - N=30, YTM=1.9%, PMT=1.8M, FV=100M - Value = $97.73M

Market Value of Bank Liabilities Liability of $75.75M due in one year – Principal and interest – Depositors will “redeposit” principal with you at new rate in 1-year Market Value of liabilities = amount I would have to put away now at current rates to pay off liability in one year = present value Before rates increase: 75.75/1.01=$75M After rates increase: 75.75/1.011=$74.93M

Market Value of Equity PV(assets) – PV(liabilities) One way to think of it: – Assume 1 individual were to purchase the bank – After purchasing the bank she plans to liquidate – When she sells assets, she will get PV(assets) – But of these assets, she will have to set aside some cash to pay off liabilities due in 1 year, PV(liabilities)

Market Value of Equity One way to think of it (continued) – When considering a purchase price, she shouldn’t pay more than PV(assets)-PV(liabilities) – But current shareholders also have the option to liquidate rather than sell the bank – Current shareholders shouldn’t take anything less than PV(assets) - PV(liabilities)

Interest Rates and Bank Equity Before rates increase: equity=$25M After rates increase: =$22.8M Change in equity: 22.8M-25M = -2.2M A 10 basis point increase in rates leads to a drop in equity of 8.8% (22.8/25-1=-.088)

Solutions Sell long term bonds and buy short-term bonds – Problem: Many assets of banks are non-tradable loans (fixed term) – more on this later. – Some bank loans are tradeable: securitized mortgages – How much do we want to hold in long vs. short bonds? Refuse to grant long-term fixed rate loans – Problem: No clients – no “loan generation fees” – Bank wants to act as loan broker

Solutions What should be our position in long versus short-term bonds? How much interest rate risk do we want? Longer term bonds earn higher yields, but the PVs of such bonds are very sensitive to interest rate changes. We need a simple way to measure the sensitivity of PV to interest rate changes.

PV and Yields y PV

Modified Duration Duration: a measure of the sensitivity of PV to changes in interest rates: larger the duration, the more sensitive Bank managers choose bank portfolio to target the duration of bank equity.

Duration and Change in PV Let  PV = “change in present value” The change in PV for any asset or liability is approximately

Example From before: – Original PV of 30-year bonds: $100M – When YTM increased 10 bp, PV dropped to –  PV=97.73M -100M = -2.27M Duration Approximation

Example From before: – Original PV of liabilities: $75M – When rate increased 10 bp, PV dropped to 74.93M –  PV=74.93M -75M = M Duration Approximation

Example Change in bank equity using duration approximation: Before, the change in equity was

Modified Duration Modified Duration is defined as where “D” is called “Macaulay’s Duration”

Macaulay’s Duration Let t be the time each cash flow is received (paid) Then duration is simply a weighted sum of t The weights are defined as

Example Annual coupon paying bond – matures in 2 years, par=1000, – coupon rate =10%, YTM=10% Price=$1000 Time when cash is received: – t 1 =1 ($100 is received), t 2 =2 ($1100 is received) weights:

Example Macaulay’s Duration: Modified Duration: