What is Interest? Interest is the amount earned on an investment or an account. Annually: A = P(1 + r) t P = principal amount (the initial amount you borrow.
INTEREST AND CASH FLOW DIAGRAM
Econ. Lecture 3 Economic Equivalence and Interest Formula’s Read 45-70
1 Warm-Up Review Homepage Rule of 72 Single Sum Compounding Annuities.
Chapter 2 Applying Time Value Concepts Copyright © 2012 Pearson Canada Inc. Edited by Laura Lamb, Department of Economics, TRU 1.
Engineering Economics Outline Overview
(c) 2002 Contemporary Engineering Economics 1 Chapter 4 Time Is Money Interest: The Cost of Money Economic Equivalence Development of Interest Formulas.
Borrowing, Lending, and Investing
Chapter 3 Interest and Equivalence
Recap of Previous Lecture Equivalence Equations Type I Interest rate is fixed or changes a finite number of times within the year Equivalence Equations.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
Module 3 ANNUITY Engr. Gerard Ang School of EECE.
(c) 2002 Contemporary Engineering Economics
Chapter 3 - Interest and Equivalence Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany Presentation.
(c) 2002 Contemporary Engineering Economics
1 Feedback and Warm-Up Review Feedback of your requests Cash Flow Cash Flow Diagrams Economic Equivalence.
EGR 403 Capital Allocation Theory Dr. Phillip R. Rosenkrantz
Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis.
Engineering Economic Analysis Canadian Edition
Lecture 2 Engineering Economics ENGR 3300 Department of Mechanical Engineering Inter American University of Puerto Rico Bayamon Campus Dr. Omar E. Meza.
Equivalence Equations II Infinite number of changes of the interest rate within each year UNLIKE … Equivalence Equations I (where interest rate is constant.
Interest Formulas (Gradient Series) Lecture No.6 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Naval Postgraduate School Time Value of Money Discounted Cash Flow Techniques Source: Raymond P. Lutz, “Discounted Cash Flow Techniques,” Handbook of Industrial.
Intro to Engineering Economy
Summer Time Value of Money Session 2 07/02/2015.
The Time Value of Money, An Overview Prof. Alley Butler Chapter 4 Part 1.
PRINCIPLES OF MONEY-TIME RELATIONSHIPS. MONEY Medium of Exchange -- Means of payment for goods or services; What sellers accept and buyers pay ; Store.
Single-Payment Factors (P/F, F/P)
Copyright ©2012 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fifteenth Edition By William.
Exam I Review Exam is closed text book, no loose sheet paper
CTC 475 Review Cost Estimates Job Quotes (distributing overhead) – Rate per Direct Labor Hour – Percentage of Direct Labor Cost – Percentage of Prime (Labor+Matl)
Economic System Analysis January 15, 2002 Prof. Yannis A. Korilis.
Multiple/Continuous Compounding. Understand Effective Interest Rates Figure out how to use Inflation/Deflation in your decisions.
Chapter 4: The Time Value of Money
Equivalence and Compound interest
Engineering Economic Analysis Canadian Edition
ENGINEERING ECONOMICS Lecture # 2 Time value of money Interest Present and Future Value Cash Flow Cash Flow Diagrams.
Interest Formulas – Equal Payment Series
1 EGGC4214 Systems Engineering & Economy Lecture 4 Interest Formulas.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Factors - Extra Problems Course Outline 3.
Engineering Orientation
Engineering Economic Analysis Canadian Edition Chapter 3: Interest and Equivalence.
ISU CCEE CE 203 EEA Chap 3 Interest and Equivalence.
Equivalence of cash flows Construction Engineering 221.
Financial Mathematics 1. i = interest rate (per time period) n = # of time periods P = money at present F = money in future –After n time periods –Equivalent.
MER Design of Thermal Fluid Systems INTRODUCTION TO ENGINEERING ECONOMICS Professor Bruno Winter Term 2005.
CHAPTER 4 MONEY-TIME RELATIONSHIPS AND EQUIVALENCE.
CTC 475 Review Simple vs Compound Interest Find F given P –(equation and factor form) Find P given F –(equation and factor form) Find i given P, F and.
1 Engineering Economics.  Money has a time value because it can earn more money over time (earning power).  Money has a time value because its purchasing.
Example 1: Because of general price inflation in the economy, the purchasing power of the Turkish Lira shrinks with the passage of time. If the general.
(c) 2002 Contemporary Engineering Economics 1. Engineers must work within the realm of economics and justification of engineering projectsEngineers must.
Chapter 5 Time Value of Money. Basic Definitions Present Value – earlier money on a time line Future Value – later money on a time line Interest rate.
1 Equivalence Between Two Cash Flows Step 1: Determine the base period, say, year 5. Step 2: Identify the interest rate to use. Step 3: Calculate equivalence.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. The Time Value of Money 9.
Chapter 4 More Interest Formulas
LESSON 1 – SUMMARY – TIME VALUE OF MONEY Interest Calculation: Simple Interest Compound Interest Compound and Discount Methods: comparing values ​​ in.
1 Engineering Economics Engineering Economy It deals with the concepts and techniques of analysis useful in evaluating the worth of systems,
Time Value of Money Chapter 5  Future Value  Present Value  Annuities  Rates of Return  Amortization.
Chapter 4: The Time Value of Money
Interest Formulas – Equal Payment Series
Chapter 2 Time Value of Money
Chapter 2 Time Value of Money (TVOM).
Let’s work some problems…
Chapter 4: The Time Value of Money
Let’s work some problems…
Chapter 4: The Time Value of Money
Let’s work some problems…
Presentation transcript:

Engineering Economics I Interest and Equivalence

Engineering Economics Engineering Economics is the application of standard set of equivalence equations in determining the relative economic value of a small set of alternative capital investments that differ in their time streams of costs and benefits. As a civil engineer you may need to determine the financial feasibility of the project or the most economical design alternative. The information covered here is needed for the (FE) and the (PE) exams.

Cash Flow Table and Diagram To illustrate the time stream of costs and benefits. Receipts are positives and disbursements are negatives End-of-period convention applies Time 0 is the present Arrows in a diagram are not to scale but they represent the relative magnitude. The sign of the cash flow depends on the view point taken

A person borrowed $10,000 and has agreed to pay back as shown below Receipts (+) 1,000 1,000 1,000 Disbursements (-) 11,000

Simple Interest and Equivalence Principal: the amount given by the lender to the borrower. Interest: the payment we provide for the use of money. Simple annual interest: the interest computed only on the principal outstanding for a year. The previous example was about 10% simple interest on a $1000 loan for 4 years. The current arrangement is equivalent to the best arrangement that either part could obtain elsewhere Equivalence may breakdown if the interest rate is changed.

Compound Interest-Single Payment Compound interest: computed on both the principal and the interest outstanding for a given time period. Define: i: compound interest rate for a period of time expressed as a decimal n: number of time periods. P: present amount of money. F: future amount of money at the end of period n F = P(1+i)n or F = P(F/P, i, n) “the future amount, F, equals the present amount, P, times the factor for F given P compounded at interest rate i for n periods.

Present worth P can be computed from F the same way: P = F(1+i)-n or P = F (P/F, i, n) Tables for the factors (P/F, i, n) and (F/P, i, n) are given in Appendix B in Engineering Economy (online). You do not have to remember the formulas, just remember the the factors, e.g: (P/F, i, n). The first term refers to what you want to compute and the second refers to what is invested. How much will you invest today to receive $1000 after 7 years assuming interest rate of 11%? P = F (P/F, i, n) = 1000 *(1.11)-7 = $481.658 or from the table page 556: P/F = 0.4817 Keep 6 decimal places in your computations

Nominal and effective interest rate Rule of 72: if (i X n = 72), future factor is » 2, money will double Nominal and effective interest rate the nominal interest rate for a time period ignores the effect of any subperiod compounding. effective interest rate takes into account the accumulation of interest: 4% computed quarterly means that the interest is computed and added to the principal every three months. if r is the nominal interest rate per time period; and m: number of compound subperiods per time period. then effective annual interest rate iy = (1+ )m - 1 What is the effective annual interest rate of 7% nominal interest compounded monthly? the answer is 7.23%

Standard Cash Flow Series To compute the future or present value of periodic payments. E.g.: 1) what is the present value of a $1000 annual maintenance fees paid for 7 years assuming 5% interest rate? 2) how much do I deposit each year into an account to receive $100,000 after 15 years if the interest rate is 6%? 3) a dam will cost $10 million every 50 years for renovation purposes. If the interest rate is 10%, how much should we set aside now?

1- Uniform Series Present worth formula: (A is the periodic payment) P = A or P = A(P/A,i,n) Capital recovery formula: the opposite A =P or A = P(A/P,i,n) Answer to question (1) : 1) Use the first formula, the answer is $5786.37? P=? n A P n A=?

Compound amount formula: F = A OR F = A(F/A,i,n) Sinking fund formula A = F OR A = F(A/F,i, n) Answer to question (2) 2) Using the sinking fund formula: A = $4,296.28 F=? n A A= ? n F

2- Arithmetic Gradient Series How much should we invest today to provide for the repairs over a period of time given that repair costs increase with time? Present worth formula: P = G or P = G(P/G,i,n) where G is the gradient. Payment at the end of period 1 is 0, period 2 is G, period 3 is 2G,..., period n is (n-1)G. . P=? n G 2G (n-1)G

Example Convert the following series to its equivalent future worth, F, when I is 12%. Compute the present worth and then convert it to future worth

3- Capitalized Cost When it is necessary to assume that a certain structure or service will provide for ever. E.g..: highways, pipelines, and dams. The goal is to compute the amount of money that need to be set aside now to provide a fixed payment at certain intervals, for repairs ? If we know the annual amount needed (A), the present investment P = A/ i .......(1) If we know the amount needed each set of years (F), 10million every 50 years for example, we first compute the annual payment A = F(A/F,i,n) then use formula (1) Example 13-8

Example A dam initially costs $30 million and must be renovated every 50 years at a cost of $10 million. Interest is 8%. Find the capitalized cost sufficient to construct and maintain the project in perpetuity.