ERECTING CANOPY NET The following eight slides show the sequence of erecting canopy net.

Slides:



Advertisements
Similar presentations
1 R&M FO Patch Panels Splice Version The convincing way to terminate fibers.
Advertisements

DCN286 Introduction to Data Communication Technology Session 5.
ULTIMATE PORTABLE WORKSTATION Produced by Gavin Weyrich.
AnaSonde Assembly. What is the AnaSonde? *Reads temperature, pressure, and humidity data from the atmosphere *After it is sent into the atmosphere, it.
Technician License Course Chapter 9 Lesson Module 22 Mechanical Safety.
Gate Latch The hook is inserted into the eye screw to latch.
Place AS-2259 Antenna into Service
Load the Crimp into the jaws of the Crimper/Tensioner instrument.
Session 8 Type IX Crash Cushion CAT-350 Trinity Highway Products.
Supported Scaffold Safety
Static Equilibrium KEY
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Holiday Lane Batting Cage Set-up Instructions July 2007 In-ground Posts (6 places) Upright Poles (qty 6) Cross Piece (2) – Short (1) - Long Frame Assembly:
Instructions 1.  SITING YOUR TRAMPOLINE  Your trampoline works best and is safest if it is dead level. If your trampoline is fitted.
Condensation Piping and Installation Drain Pans
A 2 element 6 Meter Quad Made from PVC pipe and capable
Greenhouses limit increase: GCE Greenhouse Greenhouse: Building used to house and grow plants -Climate can be controlled -Amount of water.
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
Nutrient Network Building an Exclosure March 2008.
-Beam -Truss -Arch -Suspension -Cable Stayed
1 66 blocks are prevalent in the telecommunications industry Today they are used primarily for phone applications only 66 blocks are prevalent in the telecommunications.
Chap 9 Structure Cabling Project Andres, Wen-Yuan Liao Department of Computer Science and Engineering De Lin Institute of Technology
Preparing for fencing Make sure that appropriate fencing tools are selected for job to be performed Fencing work procedures can be separated into the following.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
Setting up the Ricoh C305 Press F5 to start the Presentation
Team Highlander Week 7 Presentation Ideation Initial CAD.
Welcome To The Benton County Radio Operators Monthly Get Together.
PC Maintenance: Preparing for A+ Certification Chapter 8: Installing and Troubleshooting the Basic Components.
Connectors Slide 42 of 191 Service cable connector Slide 43 of 191.
Mounting System for new modules Module AIT-PL-6. Mounting way The mounting system for new frameless modules AIT PL-6 was designed and is produced by Spanish.
Speed-Mount™ Switch Boxes Crouse-Hinds Training Module.
SARDAR PATEL INSTITUTE OF TECHNOLOGY, PILUDARA Rakholiya bhavdip : [ ] Gevariya balkrushn : [ ] Patel parth : [ ] ( Branch:
Class Discussion Item 2.1 Proper Car Jump Start. Schematic of a Proper Car Jump.
Boosting a Car Battery Cables should have sufficient length (12-16-ft) with #6 gage stranded wire and well-designed clips. Follow the proper sequence of.
Theatre Safety A quick guide to avoiding accidents in class.
What Is A Network A network is a group of computers interconnected with communication lines which allows users to share information and resources.
2.? Calculus Drill 1/11/10 zFind two positive numbers that satisfy the given requirements z(a) the product is 192 and the sum is a minimum z(b) the product.
INSTALLING HARDRIVES AND FLASH DRIVES Objective: install a flash drive and test the installation. How is a Flash drive different to a Hard Drive? Hard.
How to move your horn.. 1.This one is a shot of the horn with the acorn nut removed. STEP 1.
Basic Slide Show Under Tile Spooled Heating Installation Guide.
Slide 1 Insert your own content.. Slide 2 Insert your own content.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
To install the four wires from the back of the coil machine, loosen the four knobs. Keep each wire in center under each knob, off to the side will allow.
Ultracorr® Installation Process
Service channels between Tracker and PP1
Best Racket.
continued on next slide
GrainPro® SBD™ Solar Bubble Dryer25™ Doc. Code: TSD-PP003.
HUMAN FAILINGS.
                                                                                                                                                                                                                                                
continued on next slide
continued on next slide
ANNEX E PRESENTER WINSTON THOMAS
Fred Carlton Field Turf Renovation
RV Solar Panel Installation
Web Sling & Tie Down Association
Electrical Wiring Single Pole Switches.
Step-by-step assembly instructions
זכויות סוציאליות.
Slide 1 Insert your own content.. Slide 1 Insert your own content.
Wire Wrap Pipe Base Well Screens. Pipe Based Well Screens.
Slide 1 Insert your own content.. Slide 1 Insert your own content.
Slide 1 Insert your own content.. Slide 1 Insert your own content.
C 4 Insulator Changeout With Hoists
Here ‘s the work of some of our classes on street games….
Where to Use Warning Lines
continued on next slide
Repairing the Electrical Components
continued on next slide
Presentation transcript:

ERECTING CANOPY NET The following eight slides show the sequence of erecting canopy net.

Slide 1 The standing cables have been erected, a wire has been inserted into the selvedged edge and the net laid out on the ground.

Slide 2 The loose netting is now run out over the cables. Note the PVC pipe to help the net over the cross cables

Slide 3 The wire in the edge of the net is now starting to be attached to the standing cables

Slide 4 Spreading the net

Slide 5 Attaching the net

Slide 6 Attaching the net.

Slide 7 The net is now attached at the corners and the wire tensioned.

Slide 8 The tensioned net is now attached to each post. All that remains is for the edge wire to be attached to the cable using special clips.

HAIL NET This hail net installation has reached the same stage as the last slide. It now needs to be clipped off.

CLIPS These clips attach the edge wire to the cable. They are designed to fail before the cable and structure in extreme circumstances. Thus you don’t lose everything and the net can be re-clipped.

QUAD NET Often used by lychee and stone fruit growers, it is NOT hail net but can give some hail protection.

6mm SPLICE A pair of these splices are the easiest way to join cable and wire.