Lesson 11.  Timber framed structures are common in New Zealand. They comprise of timber studs, plates, bearers, beams, rafters, purlins and custom fabrications.

Slides:



Advertisements
Similar presentations
Construction Explanation.
Advertisements

Dr. Ruth Collins TrinityHaus
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 10 Improvement Analysis.
Unit 2 Construction Process Part Illustrated Words and Concepts Figure 2-1 Schedule of Stages in Typical Single House Construction Figure 2-2 Approvals,
Roofs are one of a building’s primary elements and play a major part in giving a building its character. There are several different types of roof in.
Portal Framed Construction
An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Measuring Carpentry and Miscellaneous Items
eQuest Quick Energy Simulation Tool
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Update on FCPS Construction/Renovation Projects August 2009.
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
Walls Ron Gatepain constructionsite.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Skyscraper Construction
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Miscellaneous Details. u May have special or unusual conditions –inside or outside structure u Approach same as before –analysis of how specific detail.
NGfL CYMRU GCaD STRUCTURAL TIMBER FRAMING.
PERMITS & INSPECTIONS DEPARTMENT 2003 INTERNATIONAL RESIDENTIAL CODE IRC.
Foundation Systems.
After the foundations have been completed the walls are set out and construction commences. wall structures.
Estimating Waste Week 3 CTC-415. What is waste Waste is material that needs to be supplied but may not be used All material items except steel beams and.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Topic C1 Superstructures - walls
Lesson 2.  Estimating Techniques ◦ Internal finishes.
ASSIGNMENT Begin on page 197 “The Foundation”.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
HVACR116 – Trade Skills Mechanical Drawings.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
Balloon Frame North-American invention, 1833
Energy Performance and Moisture Control of Ceilings and Roofs 1.
RESIDENTIAL CONSTRUCTION UNIT Grade 10 Construction Technology TCJ200.
Wall and Ceiling Construction
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Click here for Game Rules & Instructions: Copyright © 2009, Steve Beutler, All rights.
Finishing the Building
CONSTRUCTION Objective You will need to write all the information down but you need to highlight, mark, or note that the items in yellow are important.
Light Wood Frame Construction
Wall Framing Grimsby Secondary School Technology Dept.
Chapter 28 Structural Components of Framed Construction.
Unit 6/P6 – Timber Frame Construction Name ________________
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
Chapter 7 : Construction 1. Adobe – a mixture of clay and straw used as a structural material in the Southwestern United States.
Framed Structures Luisana Hernández.
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
Lesson 5.  The carpentry trade covers many items. That is, it is not confined to a few specific items such a reinforcing steel, painting etc.  Common.
Drafting 2 (Arch) Quiz Review #6 Quiz Review. 1.To anchor a stud wall to the subfloor, carpenters nail through the: Sole plate Header Jamb Joists Quiz.
Learning Outcome Lesson Objective
Learning Outcome Lesson Objective
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
CAD-Architecture Inst: Mr. Johnston Logan High School
Foundation – jay Desai.
Framing Vocabulary Stud: upright beams in the framework of a building
Major Steps In Building a SFR
External Walls Carl James.
How Completed Interiors Are Achieved: Designing & Building
Pritesh h prajapati Arvind g prajapati Arvind m prajapati Arvind khata.
Objective 6.02 part 1: Recognize components of construction
Pre-Contract Cost Control
Arch205 building construction Windows- glazed curtain wall, skylights
Building Construction I Sofia Sebastian 1
STRUCTURAL TIMBER FRAMING
How & When to Get Permits for Work in Your Home
Arch205 building construction Introduction
House Construction Budget Plan
Arch205 Materials and building construction I
Timber Frame Panel with opening Typical panel comprises a series
Presentation transcript:

Lesson 11

 Timber framed structures are common in New Zealand. They comprise of timber studs, plates, bearers, beams, rafters, purlins and custom fabrications at the connection points i.e joist hangers, bolts

 If the building is predominately timber framed a price can be sought for a prenail construction. This is where the frames are constructed off site and then installed as component elements.  Alternatively the each piece of timber is measured and then priced on a unit rate estimate

 Small v large quantities  Consider the overall project. There maybe lots of repetition but production rates can be affected by the complexity of the project and the connection details  Geographic location Availability of material and delivery charges are affected by the location of the project. You must also consider if the material needs to be protected/ stored when it arrives on site

 Labour availability  Skilled craftsmen are required to efficiently erect a timber framed structure. Need to consider availability of labour and travel times when pricing projects

 Seasonal affect on work  Timber framed structures can be erected in all seasons however the weather can effect the method of installation and erection Excessive moisture may cause the effect the wood to swell making proper fitting difficult Hot dry weather lower moisture content and causes to shrink which causes connections to be excessively tight when moisture content is returned to the wood.

 Scope of works  As an estimator you need to understand the full extent of the works. Consideration must be taken for phasing work, working with other trades, temporary utility locations and access.

 Calculating labour constants  Depending on the labour constants used either price as individual rates or average cost per man hour Lead carpenter $55.00/hr Carpenter (2 no)$100.00/hr Labourer (2no)$56.00/hr Total$211.00/hr Average cost/man hour $42.20/hr

 Calculating material costs  These are typically sourced from timber merchants or the contractors main database. Special CSQ’s can be offered for larger projects.  Calculating equipment costs  Most skilled carpenters will provide their own equipment ie nail guns, drop saws etc. However specialist equipment will either be costed under carpentry items or in the p & g section of the tender

Example  If the length and height of a wall is known and the centres of the studs are known then the quantity of timber can be calculated if the m2 area of the wall is the only item given  The following method can be used for calculating the number of bolts or other connections

Example  The length of a wall = 20m  The height is 3.0m  The centres of the studs are at 600 c/c No of studs required are 3.0/.60 = 5+ 1 for the end TOTAL = 6 no studs

Example  If bolts are required at 1200 c/c along the base plate.  Total no of bolts required 20/1.2 =  = end  = 18 no  If joist hangers are required for rafters at 400 c/c along a roof line of 15m

Example  If joist hangers are required for rafters at 400 c/c along a roof line of 15m  Total no of joist hangers 15/0.40 =  = end  = 39 x 2 both ends

Example  If bolts are required at 1200 c/c along the base plate.  Total no of bolts required 20/1.2 =  = end  = 18 no  If joist hangers are required for rafters at 400 c/c along a roof line of 15m

 100 x 50 timber joist fixed to timber plate  Materials  100 x 50 $3.00/m  Nails allow 2kg/m3 ($1.20 kg/m3)  2 x $1.2 x.05 x.1 $0.01/m  Sub total $3.01/m  Delivery say 5 % $0.15/m  Sub total $3.16/m  Wastage 7.5% $0.24/m  Total $3.40/m

 100 x 50 timber joist fixed to timber plate  Labour  0.14 $42.20 = $5.98/m  Total $9.31/m

 Other considerations  Unloading and distributing is included in the labour rate or it is an additional item in the p&g section  Nails are included in each individual unit rate or are allowed for as a percentage of the total carpentry costs (typically 10%)  Delivery can be costed separately and not included in the unit rate

 Cost estimates are broken down into different sections. The main ones are trade or elements.  Construction costs are segregated into these components for cost comparison or analysis.  Understanding what each component comprises of helps to ensure that all items have been included in the cost estimate

 Summary of trade items  Site preparation and Demolition Demoliton, shoring of existing buildings General site grading to required subgrades Removal and relocation of ultility lines Retaining walls to protect adjoining properties

 Foundations Excavation of site subgrade and disposal of excavated materials, backfilling and removal of surplus material All necessary temporary work to support the sides of the excavation and removal of ground water All pile caps, tie beams, trenches, pad foundations that are not part of the flooring system  Vertical Structure All columns and structural walls with the roughest finish acceptable Any necessary fire proofing

 Floor and roof structure Floor slabs on grade including sand blinding and vapour barriers but not waterproof membranes All beams, trusses etc supported by the vertical structure Structural framing joist, rafters and decking of all supported floors and roof – rough structural finish only Necessary fire proofing

 Exterior Cladding Any non structural skin or curtain wall added to the structure to enclose or finish the building Any supporting framing or connections required for the cladding Any insulation Waterproofing or damp proof membranes above grade Non structural balconies, paparpet walls Fascias, decorative bands or friezes External window and doors/louvres including glazing and hardware

 Roofing and waterproofing Waterproof membranes on floors and walls including skylights Exterior and interior roofing insulation Exterior applied membranes All flashings and gutters/downpipes  Interior partitions, doors and glazing Non load bearing partitions Sound insulation to partitions Balustrades, rails screens All interior doors and windows including glazing and hardware

 Floor, wall and ceiling finishes Floor coverings of all types Bases or skirtings including finish Any special finishes Suspended ceilings and insulation above ceiling Painting and other decorations  Function Equipment and specialities Any built in shelving and cabinetry Protective guards and barriers Prefabricated compartments and accessories

 Stairs and vertical transportation Staircases and ramps complete with landings and balustrading Lifts and moving staircases/ramps Dumb waiters or hoists  Plumbing system All sanitaryware and specialist plumbing items Waste,soil pipes connected to the inside and outside of the building Drainage including sewer systems Floor and roof drains and piping Water treatment and storage including circulation

 Heating, ventilation and air conditioning Heating, cooling and air cleaning equipment All pipework and ducting associated with the above Grills, dampers and exhaust fans  Electrical systems Main service from transformers, switch gear, panels etc required for the building All lighting fixtures, wiring and power circuits Data cabling, sound and communication systems Emergency power BMS systems

 Fire protection system Automatic fire protection and sprinkler systems  Site paving, structures and landscaping Retaining walls to support landscaping Paving and curbs Landscaping and irrigation Site furniture Fencing and rails Lighting and drainage

 Contractors overheads and profit  P&G for the project – site establishment, storage facilities, supervision, temporary services, security insurance, bonds, permits  Margin – contractors margin for the total cost of the project  Contingency for design development  Fluctuations