1 Broadcaster Relocation Fund Workshop Expanded Presentation June 25, 2012 Presented by: Jay Adrick, Vice President Broadcast Technology.

Slides:



Advertisements
Similar presentations
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
Advertisements

Wireless LANs in the office. Stewart Sharpe.. Key Benefits. Wireless LANs within an office allow users to roam freely around the office. No issues of.
Agenda Super-Cells Multi-Cells
1.  The Australian Radio Communications Industry Association represents some 300 commercial entities including approximately 1500 industry professionals.
NJ SmartStart Buildings New Jersey Higher Education Partnership for Sustainability (HEPS) January 20, 2012 Presenter: BPU President Robert Hanna.
NTIA Translator & Low-Power Television Digital Programs NATIONAL TRANSLATOR ASSOCIATION May 16 – 18, 2008.
MOTOROLA and the Stylized M Logo are registered in the US Patent and Trademark Office. All other product or service names are the property of their respective.
MaxxCasting™ Alfredo Avalos Navarro. What is MaxxCasting™? Historically, broadcasters have used single booster sites with relatively high antenna heights.
Economic Advantages of DAB+
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Airmux 400 Version Slide 2 Airmux-400 in Brief Airmux-400 is a point-to-point radio solution for combined Ethernet and TDM traffic.
NTIA Translator & Low-Power Television Digital Programs NATIONAL TRANSLATOR ASSOCIATION May 15 – 17, 2009.
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
Copyright : Hi Tech Criminal Justice, Raymond E. Foster Police Technology Police Technology Chapter Three Police Technology Wireless Communications.
Improving Capacity in Cellular Systems
Wireless & Mobile Networking: Cellular Concept
NTIA Low-Power Television Digital Programs June 22, 2007.
Presented by Donald P. Archiable Vice President – Director of Technology National Design Practice Area Leader Mark G. Fehlig, P.E., CPBE Senior Engineer.
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
SHORT WAVE SERVICES: The Gateway to Africa August 2012.
The magic of radio Terms to know, regulation and ownership.
Terrestrial Microwave TK2133 A Lee Hau Sem A Lai Horng Meau.
Radio Frequency Safety. Purpose Provide: Basic Technical Understanding Overview of FCC Regulations and Compliance Issues Hazard Recognition Skills Awareness.
BSAD 221 Introductory Financial Accounting Donna Gunn, CA.
Wireless Fundamentals Lesson 2: Implementing A New Wireless System Bellevue Community College Bob Young, Instructor.
Jobs and Unemployment CHAPTER 6 EYE ONS Aggregate hoursFull employment Labor forceDiscouraged worker Working age populationFull-time worker Unemployment.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
UNSD/ International Trade Statistics Section 1 Case study 5: Insurance services, Financial services and Other business services Workshop on Statistics.
1 DCPR Power Ranges Proposed for CS v.2.0 DCS Manufacturers Meeting June 13, 2007 Peter Woolner Noblis
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
A SUMMER INDUSTRIAL TRAINING PRESENTATION ON SIGNALLING & TELECOMMUNICATION TAKEN AT NORTH WEST RAILWAY -JAIPUR
Is It Worth It? The Cost of Insurance. Insurance Terms Premium Deductible Underwriting.
SCHOOL BUILDING AID PROGRAM CHANGES 2014 AND BEYOND.
Streamlined Environmental Requirements for Distributed Antenna Systems (DAS) and Small Cells.
Senior Project – Electrical Engineering Amateur Radio Repeater Daniel Harkenrider Advisor – Professor James Hedrick Abstract There are a number.
Designing for High Density Wireless LANs Last Update Copyright Kenneth M. Chipps Ph.D.
Obsolescence Impact on Configuration Management
NTA FCC Media Bureau (202)
Chapter 3 : The Electromagnetic Spectrum
DOLLARS AND SENSE SALVAGE Spawning Economic Development from Material Recovery.
©Ofcom Spectrum reform in the UK: The development of Spectrum Usage Rights Professor William Webb 2006.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
KTH ROYAL INSTITUTE OF TECHNOLOGY Cellular network dimensioning Amirhossein Ghanbari
Retrofitting and Maintenance. Regular Maintenance is Necessary Failure to Perform Maintenance Leads to….. Diminished Performance Deterioration Failure.
Doc.: IEEE /0974r2 SubmissionShusaku Shimada 1 Consultation Summary of Japanese 920MHz Band Rules and Conditions Date: Authors: Note:
Copyright © 2005 Heathkit Company, Inc. All Rights Reserved Automating and Integrating Residential Systems Presentation 4 – Control of Entertainment Equipment.
Law Changes Affecting Commercial Drivers Presented by: PennDOT’s, Bureau of Driver Licensing Stephen P. Cantini | CDL Manager PA Department of Transportation.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
WOU Radio Station A non profit student radio system.
Eeng360 1 Chapter 1 INTRODUCTION  Propagation of Electromagnetic Waves  Information Measure  Channel Capacity and Ideal Communication Systems Huseyin.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
Innovation, Science and Economic Development Canada (ISED) 600 MHz Repurposing RABC 600 MHz Working Group Meeting Innovation, Science and Economic Development.
Computer Technology: Your Need to Know Chapter 1 Slide 1.
Preparing for Change TV Stations Are Moving Frequencies
Plan to Rescan TV Stations Are Moving Frequencies
600 MHz – Proposed TV Transition Objectives and Methodology
Plan to Rescan TV Stations Are Moving Frequencies
Plan to Rescan TV Stations Are Moving Frequencies
Plan to Rescan TV Stations Are Moving Frequencies
Location Analysis and Planning Chapter 8
SOLAR POWER – BOONVILLE WWTP CASE STUDY September 19, 2018 Charles R
Terrestrial Microwave
White Space Regulatory Issues
IMPLEMENTATION ,EVALUATION AND MAINTENANCE OF MIS
Plan to Rescan TV Stations Are Moving Frequencies
Communicating in the IT Industry
NATE Tower Site Hazard Recognition Guide
Terrestrial Microwave
Cellular Systems.
Presentation transcript:

1 Broadcaster Relocation Fund Workshop Expanded Presentation June 25, 2012 Presented by: Jay Adrick, Vice President Broadcast Technology

2 Likely Scenarios for Station Channel Changes Channel change within the technical limits of the existing transmitter and antenna –Transmitter employs currently supported technology –Estimated that <5% of stations in this category Channel change beyond the technical limits of the existing supported transmitter and antenna –Transmitter employs currently supported technology –Estimated about 40% stations in this category Channel change beyond the technical limits of the existing un-supported transmitter and antenna –Transmitter is no longer supported due to technology obsolescence –Estimated about 55% stations in this category

3 Station Issues During Channel Change How to remain “On Air” during a channel change? –Typical effort to change channel on transmitter in most cases will require multiple days of down time Either a temporary transmitter or a new replacement transmitter will be required – most probably a new transmitter will be required In limited instances there may be two transmitters –Tower structures must be able to support the addition of temporary antennas and feed lines during the transition Revised EIA specs show that many towers will be overloaded –Is building space and power available for a second transmitter during transition?

4 Station Issues During Channel Change Addressing local zoning law and regulations related to facilities modification and antenna/tower changes. –Issues are both timing and cost Engineering considerations related to building modifications, site surveys, tower loading evaluation, etc. –Issues are both timing and cost How to reimburse if a station has 2 transmitters…1 main and 1 alternate or multiple sites?

5 Industry Issues During Channel Change Limited number of qualified tower crews to change out antennas and feed lines –See next slide for more details Limited number of technical crews to retune existing or install new transmitters Manufacturing capacity for replacement antennas, channel filters, RF line systems and transmitters How to deal with and compensate stations when a common antenna facility is involved How to deal with and compensate stations located at a common antenna site that do not change channel but are impacted by adding a first adjacent channel station to the common site

6 Industry Issues During Channel Change There is a total of 14 tower crews in the US that have the skills, training, equipment and insurability to remove and replace heavy television transmitting antennas on tall towers The typical broadcast TV antenna replacement job including a temporary antenna will take from 3 to 6 weeks to complete –Average 5 weeks including travel –Working 52 weeks per year for 3 years, the 14 crews could do a maximum of 434 stations

7 Issues Presented by the Laws of Physics Moving to lower frequency channel assignments will mean larger antennas for equal gain or lower gain for equal sized antennas –Tower loading limitations may impact the size of antenna or drive additional cost to reinforce the tower structure –Lower gain antennas will require higher transmitter power to provide equal coverage –Ties back into industry issues (i.e., limited number of tower crews)

8 What We Do Not Know How many stations will move and to what frequencies? What will be the impact of the move for each individual station based on their unique equipment and needs? Over what period of time will the channel change process occur? –Start date –End date –Transition period Will the channel change process take place across a region, by DMA or by auction market?

9 Where Reimbursement May Be Needed Engineering study Transmitter(s) Transmitter installation Channel filter Antenna Tower rigging Permits Building modifications Electrical service modifications Leasing temporary antenna and transmission line Tower loading study Proof of performance testing Coverage verification Transmission line Channel combiners at common sites Constructing a new tower if needed Legal services for filing Clean up and removal of old equipment

10 Channel Change – Least Impact ( <5%) Retune transmitter to new channel Replace Output Mask Filter Conduct Proof of Performance testing Begin operation on new channel

11 Channel Change – Moderate Impact (15%-25%) Install temporary antenna and transmission line Retune existing transmitter to new channel Replace Output Mask Filter Conduct Proof of Performance testing Cut over to new channel Remove original antenna Install new antenna Cut over to new antenna Remove temporary antenna and transmission line

12 Channel Change – Likely Impact (45%-55%) Install temporary antenna and transmission line Modify building and electrical for additional transmitter Install new transmitter Install new channel mask filter Remove original antenna Install new antenna Conduct system proof tests Cut over to new channel Remove temporary antenna and transmission line Remove original transmitter or convert to new channel as back up transmitter

13 Channel Change – Almost Worst Case Impact (20%-25%) Install temporary antenna and transmission line Modify building and electrical for additional transmitter Install new transmitter Install new channel mask filter Remove original antenna Remove original transmission line Install new transmission line Install new antenna Conduct system proof tests Cut over to new channel Remove temporary antenna and transmission line Remove original transmitter or convert to new channel as back up transmitter

14 Channel Change – Worst Case Impact (10%-15%) Acquire new site for tower and transmitter Make site improvements Build new building for transmitter Erect new tower structure Install new transmission line Install new antenna Install new transmitter Conduct system proof tests Cut over to new channel Remove old antenna and transmission line Remove old transmitter and associated equipment Restore old site

15 Cost Factors for High TPO UHF Stations Existing Transmitter3-Tube IOT Upgrade in-band*$300,214 Upgrade out-of-band*$429,548 New Transmitter$1,633,214 Antenna$168,000 RF Line (1200')$392,160 Antenna change out$140,000 RF Line Installation$225,000 Note: These examples show “Hard” equipment costs only Not included are permits, legal fees, engineering studies, disposal of old equipment, building modifications, tower modifications, etc. Total with New Transmitter: $2,558,374 * If possible

16 Cost Factors for Medium TPO UHF Stations Existing Transmitter2-Tube IOT Upgrade in-band*$249,976 Upgrade out-of-band*$339,310 New Transmitter$1,158,976 Antenna$168,000 RF Line (1200')$222,811 Antenna change out$140,000 RF Line Installation$195,000 Note: These examples show “Hard” equipment costs only Not included are permits, legal fees, engineering studies, disposal of old equipment, building modifications, tower modifications, etc. * If possible Total with New Transmitter: $1,884,787

17 Cost Factors for Lower TPO UHF Stations Existing Transmitter1-Tube IOT Upgrade in-band*$101,429 Upgrade out-of-band*$226,333 New Transmitter$619,429 Antenna$72,000 RF Line (1200')$144,046 Antenna change out$140,000 RF Line Installation$150,000 Note: These examples show “Hard” equipment costs only Not included are permits, legal fees, engineering studies, disposal of old equipment, building modifications, tower modifications, etc. Total with New Transmitter: $1,125,475 * If possible

18 Questions?