Winter 2015 ECEn 490 Lecture 10 Prototyping 1 Prototyping and Design Standards.

Slides:



Advertisements
Similar presentations
CH 4: Finding Your Unique Selling Point 14 January 2014 Lectured by: OR Vitou.
Advertisements

Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Winter Development Processes and Product Planning Phase 1 Concept Development Phase 2Phase 5Phase 4Phase 3 System-Level Design Detail Design Testing.
(Insert team name) (insert your names) Homework worksheets ONE PER TEAM Send this powerpoint to india- by Tuesday, June 25.
Multimedia Games Development COM429M2 Week 2 Early game development.
Project Management.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Modelling.
Tattletale Toy Company ®
Rational Unified Process
Technical Writing II Acknowledgement: –This lecture notes are based on many on-line documents. –I would like to thank these authors who make the documents.
Conceptual Design.
For use only with Perreault and McCarthy texts. © The McGraw-Hill Companies, Inc., 1999 Irwin/McGraw-Hill Chapter 10: Product Management and New-Product.
Notion of a Project Notes from OOSE Slides - modified.
CS350/550 Software Engineering Lecture 1. Class Work The main part of the class is a practical software engineering project, in teams of 3-5 people There.
Development Processes and Product Planning
SE 555 Software Requirements & Specification 1 SE 555 Software Requirements & Specification Prototyping.
Systems Engineering Management
Product Design and Development Chapter 12, 13 & 14 – Prototype, Robust Design & Patent and Intellectual Property.
ES305: Virtual Tools in Engineering Design: The Eng. Design Process James Carroll, Associate Professor Electrical and Computer Engineering.
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
Teaching materials to accompany:
Introduction to Computer Technology
The Design Process By Mr. BZ Engineering and Design Fall 2011.
The New Product and Services Development Process By SK Winning Innovations for Tomorrow (WIT)
Section 30.1 Product Planning, Mix, and Development
Shad Valley MUN Introduction to Product Design and Development
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Business Plan Advanced Business Technology. Part I – Cover Page Your Name Business Name Company Logo Address Telephone Number Fax Number Address.
IGEM Project Technology Name Presenter’s Information and Title Title of Industry Contacts and University Contacts.
BAB 11 : Prototyping. Dira Ernawati, ST. MT - P3 2 Prototyping An approximation of the product along one or more dimensions of interest –Industrial designers.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4.1.
Prototyping Integrated Product and Process Design ME 475 |
Entrepreneurship Opportunities
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
5.1 Understand the process and value of conducting a feasibility analysis for your business Key Terms: Industry Target customers Competitive grid Prototype.
Computers Are Your Future © 2006 Prentice Hall, Inc.
Product Planning Section 8.1. Product Planning, Mix, and Development The nature and scope of product planning The concept of product mix The different.
Product Planning.  Product Planning  Decisions about the features and services of the product  Ideas that will help sell the product  Packaging /
Product Planning, Mix, and Development
Engineering Design Introduction to Mechanical Engineering
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
111 Notion of a Project Notes from OOSE Slides – a different textbook used in the past Read/review carefully and understand.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
What Makes a Good Project Michael A. Mackey August 27, 2004.
Computers Are Your Future © 2008 Prentice Hall, Inc.
AP-1 5. Project Management. AP-2 Software Failure Software fails at a significant rate What is failure? Not delivering it on time is an estimation failure.
Three Approaches to New Product Development Consumer Driven Competition Driven Technology Driven Idea generation Concept development and consumer screening.
Chapter Small Business Basics. Small Business Ownership ► Small Business-is an independent business with fewer than 500 employees ► The owner is.
4-1 Copyright © 2009 Pearson Education Canada CHAPTER 4 Strategic Planning Concepts for Marketing Communications.
Spring ’2014 New Product Development
Development of Athletic Statistical Analysis Tools (ASAT) ETM5121 Proposal Submitted by Kenny Coker.
May, 2005(c) 2005, US Civilian R&D Foundation1 The U.S. Civilian Research and Development Foundation (CRDF) Industry Partner Development Program (PDP)
Chapter 12 EIN 6392, Product Design summer 2012
Fall 2015 ECEn 490 Lecture #8 1 Effective Presentations How to communicate effectively with your audience.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Read to Learn Describe the kinds of market research a company may use. Identify the steps in developing a new product.
Read to Learn Describe the kinds of market research a company may use. Identify the steps in developing a new product.
Standard 5 - Product Management. Standard 5 Day 1 Students will be able to: Understand the importance of generating product ideas to the ongoing success.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
Operations Management Lesson 3 Product Design and Process Development.
Proposing Client Solutions Sherran S. Spurlock January 10, 2006.
Reform Groups and Analyze Preliminary Designs. Schedule Week 6 Lab Small Group Presentations Form into three large teams Agree on problem statement and.
A WebQuest By Carol Jennings START Introduction Assignment 1 Assign. 1 cont. Assignment 2 Process Description of Business Marketing Finances Management.
Lecture 3 Prescriptive Process Models
Computer tools for Scheduling
Chapter 2 The Process of Design.
Chapter 12 EIN 6392, Product Design Fall 2009
Presentation transcript:

Winter 2015 ECEn 490 Lecture 10 Prototyping 1 Prototyping and Design Standards

Winter 2015 ECEn 490 Lecture 10 Prototyping 2 Iomega HipZip Case Study History: 1998 events Iomega had been successful designing and selling the Zip drives, but sales had begun to fall. They were using the “razor and razor blade” product concept. The media was the big money maker. Their core technology was designing contact recording heads that could “fly” over flexible magnetic discs. Marketing was trying to get into another mass consumer market. Engineering prototyped a miniature Zip like drive, code named Clik! Clik! had a 40 MB disc capacity in a PCMCIA Type II card slot. What other product ideas come to mind? Engineering prototyped an audio player called HipZip built around the Clik! mechanism. Analyze the product potential. What are the strengths, weaknesses?

Winter 2015 ECEn 490 Lecture 10 Prototyping 3 Iomega HipZip Case Study Cont. What steps would you take in developing a product build around this technology? In depth customer needs evaluation! Thorough competitive benchmarking! What did the development team miss? The semiconductor technology was continuing to improve areal density at the rate of ~ 2X every 18 months. (Moore’s Law) There wasn’t a simple source for generating music content. Actual results; Product was introduced, but never really went into high volume production. Product was dropped within 9 months due to lack of market interest. Estimated that this project cost Iomega over $25 million

Winter 2015 ECEn 490 Lecture 10 Prototyping 4 Prototyping Concepts A Prototype is “an approximation of the product along one or more dimensions of interest.” What are prototypes used for? Learning. How well does it meet the customer needs? Communications. Help to visual the product or key components. Integration. Ensure that the components work together as planned. Milestones. Illustrate that the product has reached a certain level of functionality.

Winter 2015 ECEn 490 Lecture 10 Prototyping 5 Other uses of Prototypes Often we don’t know enough about the final design. We may be using a new technology that hasn’t been proven. We may have two or more concept alternatives that are “too close to call”. You may have designed an expensive subsystem that requires a long lead time for fabrication.

Winter 2015 ECEn 490 Lecture 10 Prototyping 6 Prototyping Concepts Physical Analytical Comprehensive Focussed Not Generally Feasible Production Prototypes Component Evaluation Component Modeling

Winter 2015 ECEn 490 Lecture 10 Prototyping 7 Why not prototype everything? –Costs prototypes can be a major development cost 10,000 unit prototype run!!! –Time it takes time to build prototypes and time to evaluate them. –Risk prototypes often don’t represent the final product, and decisions made on prototype performance may be wrong.

Winter 2015 ECEn 490 Lecture 10 Prototyping 8 When to build Prototypes Technical or Market Risk Cost of Comprehensive Prototype Analytical Prototypes used extensively Carefully planned comprehensive prototypes Often sell the prototypes Very few comprehensive prototypes built. Few prototypes may be built for verification Many comprehensive prototypes built

Winter 2015 ECEn 490 Lecture 10 Prototyping 9 How to save time by Prototyping –Identify long lead time assemblies that are part of the critical path –Prototype in parallel with actual part development –Use prototype to help detect unanticipated design problems. You can’t model everything. –Most prototypes allow the designer to make quick changes.

Winter 2015 ECEn 490 Lecture 10 Prototyping 10 Prototyping Concepts How do you keep your project from being caught up in the “hardware swamp”? (prototypes that do not really contribute to the goals of the project. Define carefully what each prototype will be. Purpose. Why are we building this prototype? Level of approximation required. How close do we need to come to the final design? What experiment are we trying to perform, and how does the prototype fit into this plan. Develop a schedule for construction and test. Prototype with a plan

Winter 2015 ECEn 490 Lecture 10 Prototyping 11 Prototyping Concepts Physical Analytical Comprehensive Focussed Analyze your project concepts and decide what prototypes you will need. Place the prototypes on this chart.

Winter 2015 ECEn 490 Lecture 10 Prototyping 12 Design Standards What are ‘Design Standards’? Specifications or values that have become generally accepted as common for similar designs. Where did they come from? General use, industry committees, market success, government agencies, etc. List some examples. How do they impact your design? Are Design Standards a constraint or an advantage to the designer?

Winter 2015 ECEn 490 Lecture 10 Prototyping 13 Design Standards Assignment for the final report. Include a section in your final report that includes a list of the industry standards that impact your project, and how each standard affected your design.

Winter 2015 ECEn 490 Lecture 10 Prototyping 14 Homework Assignment: Continue to work on the project schedule. It will be due Tuesday Feb 17th. Also, begin to look at a Test Plan for at least one of the major design criteria for your project. This should include the test set up, procedures and expected results Next lecture is on “Managing your boss” or How to survive in any work group.