ENERGY CONSERVATION RULES, 2012 (PAT RULES) Bureau of Energy Efficiency Ministry of Power, Govt. of India.

Slides:



Advertisements
Similar presentations
WTO, Trade and Environment Division
Advertisements

Rule-Making Book II EU Administrative Procedures – The ReNEUAL Draft Model Rules 2014 Brussels, May th Herwig C.H. Hofmann University of Luxembourg.
Auditing, Assurance and Governance in Local Government
Module 13 Oversight Assessment of Auditor Authentication Bodies
Ensuring Effective Monitoring, Certification and Verification of Emissions by Jed Jones Lloyd’s Register.
Implementing the SET-plan proposed Energy Efficiency Directive The proposed Directive establishes a common framework for promoting energy efficiency in.
Accreditation 1. Purpose of the Module - To create knowledge and understanding on accreditation system - To build capacity of National Governments/ focal.
ISO 9001 : 2000.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
PERFORM, ACHIEVE AND TRADE Bureau of Energy Efficiency India.
Perform, Achieve and Trade
Trading of ESCerts on Power Exchanges.
CLAUSE 41 OF THE LISTING AGREEMENT Prepared by: Tarang Doshi M. V. Damania & Co. Chartered Accountants.
Office of Inspector General (OIG) Internal Audit
ASPEC Internal Auditor Training Version
Accounting of Emissions and Assigned Amount under the Kyoto Protocol Clare Breidenich UNFCCC Consultant.
Quality Representative Training Version
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Corporate Governance & Role of Cost and Management Accountants in the backdrop of Companies Bill, 2012 CS. Bilu Balakrishnan 6 th April, ICAI Cochin.
AMAI.  A Regulation of Government of India.  A market based mechanism to enhance the cost effectiveness in improving the energy efficiency in energy.
The Payment Of Bonus Act, 1965
Tax Administration of Self Assessment System
1 PUBLIC EXPENDITURE AND AUDIT COMMITTEE Jānis Reirs Member of Public Expenditure and Audit Committee Public Expenditure and Audit Committee.
The role of ERE in Costumer Protection Eduard Elezi Albanian Regulatory Authority ERE Conference “Albanian Energy Sector, Challenges and Regulation” Tirana,
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Monitoring & Verification of Energy Efficiency Programs in India
Copyrights I Global Manager Group | Revision 0.1 Feb 2009 | 1 GMG DEMO OF ISO: ENERGY MANAGEMENT SYSTEM AUDITOR TRAINING PRESENTATION KIT.
PROCEDURAL ASPECTS OF VOLUNTARY COMPLIANCE ENCOURAGEMENT SCHEME, 2013 VATSAL KAKKAR B.com., LL.B.
Private & Confidential1 (SIA) 13 Enterprise Risk Management The Standard should be read in the conjunction with the "Preface to the Standards on Internal.
PROCEDURE FOR LAUNCHING PROSECUTION. After identification of potential cases for prosecution by the CPC – TDS in case of mandatory processing or otherwise,
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Introduction to company ,types
© Mahindra Satyam 2009 Configuration Management QMS Training.
Company Confidential Registration Management Committee (RMC) AS9104/2A Presentation San Diego, CA January 17, 2013 Tim Lee The Boeing Company 1 Other Party.
MARKET BASED MECHANISM Perform, Achieve and Trade A.K.ASTHANA Sr. Technical Expert, GIZ, India.
S15: Supervision and review. Objective of supervision and review  To ensure that the audit is done efficiently and effectively so that the audit opinion.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 6-1 Chapter 6 CHAPTER 6 INTERNAL CONTROL IN A FINANCIAL STATEMENT AUDIT.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
1 National Accreditation Board for Hospitals and Healthcare Providers THE ROADMAP TO NABH.
Perform Achieve And Trade (PAT) Mechanism
Policy and Procedure for the Handling of Complaints against the AG Consultation with the Standing Committee on the Auditor-General 9 April 2008 Wandile.
By CA. Atul Kumar Gupta FCA, FCMA, MIMA. Page 2 Scheme Applicable from when? Benefit available?Who can apply? What is the Procedure?
Internal Audit & Internal Controls Companies Act 2013.
BY: CMA SUKRUT MEHTA KIRIT MEHTA & COMPANY COST ACCOUNTANTS Pre-Audit Preparation and Documentation 1.
Renewable Energy Certificates in Himachal Pradesh Role of HP regulator and Government By : Navneet Khokhar
Energy Energy comes in many forms including electricity, gas, oil and steam and is a resource used by organisations worldwide Energy is becoming increasingly.
Regional Accreditation Workshop For Asia and Eastern Europe Manila, Philippines th March, 2012.
Internal Audit Section. Authorized in Section , Florida Statutes Section , Florida Statutes (F.S.), authorizes the Inspector General to review.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 6 – Company Law Bilateral screening:
Harmonised use of accreditation for assessing the competence of various Conformity Assessment Bodies Dr Andreas Steinhorst, EA ERA workshop 13 April 2016,
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
mm Circular No. 17 of Income Declaration Scheme 2016
Improving Compliance with ISAs Presenters: Al Johnson & Pat Hayle.
Work shop on Procurement Key-performance indicators with selected implementing entities Public procurement and property administration agency August 2016.
Presentation to the Portfolio Committee on Communications on the:
Seminar On Energy Audit Submitted To: Submitted By:
ISO/IEC
ACCREDITATION PROCESS
Structural Funds Financial Management and Control, Romania
GST AUDIT (SEC: 65-66) -Hans Raj Garg Retd Addl Commr Customs & GST.
Document 3:12 (2011–2012) Published 5/31/2012
MINISTRY OF ECONOMY AND FINANCE
The evaluation process
How to conduct Effective Stage-1 Audit
Pedro Cruz Yábar Brussels, 21st June 2016
ACCREDITATION PROCESS
2012 Annual Call Steps of the evaluation of proposals, role of the experts TEN-T Experts Briefing, March 2013.
The meeting of INTOSAI Working GROUP on Public Procurement Audit July 4-5 Lisbon Abstract of State Audit Bureau of Kuwait in conducting the public procurement.
Nonconformity Writing
Presentation transcript:

ENERGY CONSERVATION RULES, 2012 (PAT RULES) Bureau of Energy Efficiency Ministry of Power, Govt. of India

Definitions Act: Energy Conservation Act, 2001 Baseline Year: The year in which the base level of Energy Consumption is used as reference. Target Year: Year by which a DC shall achieve compliance with Energy consumption Norms & Standards Cycle:Period of 3 years available for DC to comply with the consumption norms and standards. Certification: Process of Certifying the verification or check verification report by the Accredited Energy(AEA) Auditor Verification: The evaluation by the AEA of the activities undertaken by DC for compliance with EC Norms & Standards. Check Verification: The evaluation by Bureau through AEA in any of 3 year of activities undertaken by DC for compliance with EC Norms & Standards. EC Norms & Standards: SEC of Baseline year notified under clause (g) of Sec 14

Stakeholders Administrato r MoP/Centr al Govt Nodal Agency Bureau of Energy Efficiency Implementer Designated Consumer State Administrato r State Designated Agency Verifier Accredited Energy Auditor

TARGET SETTING PHASE 1. Establishment of Baseline 2. Review of Baseline 3. Finalization of SEC reduction Targets

Role of BEE 1. Establishment of Energy Consumption Norms & Standards for DCs Establish Baseline Mandatory Energy Audit has been Completed Mandatory Energy Audit hasn’t been completed Based on timely submission of Form 2 & Form 3 as per Rule 2008 (i)Avg. Rate of reduction in SEC across all the DC sectors determined on avg. of last 3 yrs data (ii)Policy objectives of keeping the target a few % point above the avg. rate of reduction keeping in view the incentive provided through ESCerts

Procedure for establishment of Energy Consumption Norms & Standards Technical Committee set up by BEE shall: Calculate net energy input to the plant (taking into account various factors) Calculate annual SEC in baseline year by verifying the data in the previous 3 years submitted by the DCs under rules Calculate the effect of capacity utilization and other factors if any, on the SEC for the previous 3 yrs. Calculate the SEC in the baseline yr and projected SEC in the Target yr on a gate-to-gate basis. Take account of effects caused by following factors namely: Natural Disaster Rioting or social unrest Major change in Govt. policy including environmental standard Impact of market &Shortage of raw material or sales) in any of previous three years. The Technical Committee shall prepare a report and Submit to BEE

NOTIFICATION PHASE 1. Recommendation by BEE to Central Govt. 2. Notification by Govt. 3. Formal intimation to DCs

Role of BEE 2.The Bureau shall examine the report and recommend the report to Central Govt. The Central Govt. shall by notification : 1.Establish and specify the energy consumption norms & standards for every DC’s plant under clause(g) of section 14 2.Give direction to all DCs for compliance with the energy consumption norms and standards under clause(n) of section 14 and inform the Bureau & all the SDAs Role of Central Govt.

IMPLEMENTATION PHASE 1. Reporting to BEE / SDA 2. Energy Audit 3. Compliance Mechanism

Role of DC 1.Preparation of scheme for implementation of efficient use of energy and its conservation Every Designated Consumer, within three months (30 th March, th June,12) of the issue of notification under sub-rule (6) of rule 4 shall submit a scheme to State designated agency with a copy to Bureau, which may include: - Action Plan containing inter- alia, a brief description of identified energy saving measures to comply energy consumption norms and standards by the target year. The estimated cost of each identified energy saving measures. Implementation plan to achieve energy consumption norms and standards through implementation of energy saving measures or through purchase of energy savings certificates.

Role of DC 2. Procedure for monitoring and verification preparation and maintenance of quarterly and yearly data reports by the designated consumers for following: – on the performance of plant and production processes; – on the outcome of internal field audits of plant and production processes – regarding a year-wise report on production achieved, energy consumed, and specific energy consumption achieved, specific energy consumption reduction achieved, measures adopted for energy conservation and quantity of energy saved

Role of DC 3.Assessment of Performance Every DC within three months of the conclusion of the target year from the baseline year shall submit to the SDA with a copy to the Bureau, the performance assessment document (PAD) in Form ‘A’, duly verified together with certificate in Form ‘B’ given by the Accredited Energy Auditor (AEA). The DC within 3 months after the end of first or second year of the cycle may submit PAD in Form ‘A’ to the SDA with a copy to BEE for issuance of proportionate energy saving certificates covering the performance for a period not less than one year from the date of notification specifying the energy consumption norms and standards duly verified together with form ‘B’ given by AEA along with documents mentioned in sub-rule(1).

Role of AEA for verification of Form A Shall assess the correctness of the information provided by the designated consumer regarding the compliance with energy consumption norms and standards. Shall report the results of assessment and his opinion along with the supporting documents. In case the AEA records a positive opinion in his report, BEE shall consider that all the requirements with regard to the compliance with energy consumption norms and standards, entitlement about issue or liability to purchase energy savings certificate have been met.

Role of SDA After submission of duly verified Form ‘A’ by designated consumer, state designated agency may will convey its comments, if any, on Form ‘A’ to the Bureau within fifteen days of the last date of submission of Form ‘A’

Recommendation for issue of energy savings certificates The Bureau on satisfying itself about the correctness of verification report, and check-verification report, wherever sought by it, send its recommendation to the Central Government, based on the claim raised by the designated consumer in Form ‘A’, within ten working days from the last date of submission of said Form ‘A’ by the concerned state designated agency, for issuance of energy savings certificates.

Formula for determining no. of ESCerts For Thermal power plant sector: No of ESCerts = (heat rate notified for target yr- heat rate achieved in target yr) X production in baseline yr in million kWh/10 For other sectors : No. of ESCerts = (SEC notified for target yr.- SEC achieved in target yr) X production in baseline yr. Note: DC may seek issue of ESCerts not more than 80% in proportions of its performance achieved during 1 st or 2 nd yr.

Procedure for issue of ESCerts Central Govt. after receiving recommendation from Bureau issue ESCerts of desired value to DC within 15 working days. ESCerts shall only be in electronic form 1 ESCerts= 1 toe The DC who has been issued energy savings certificates may sell them through the power exchange. ESCerts issued in current cycle shall remain valid till complience period of next cycle. ESCerts purchased by DC for compliance shall after their submission to Bureau stand expire.

Accredited Energy Auditor for Verification and Check Verification Registered under Partnership act 1932 or Company act 1956 or any other legal entity competent to sue or to be sued shall be entitled to undertake verification or check verification process if it: o Has at least 1 AEA o Has 3 energy auditors o Has expertise of field studies o Has minimum turnover of 10 Lakh rupees in at least one of previous 3 years or in case of newly formed organization, a net worth of 10 Lakh rupees. Bureau shall invite applications from the firms for the work of verification and check verification Selected applicants shall be issued a certificate of empanelment and unique identification number.

Obligation of AEA AEA shall constitute a team comprising team head and other members including experts. A person who was employed in DC within previous 4 yrs shall not be eligible Any firm or company or other legal entity who was involved in energy audit in any DC within previous 4 yrs shall not be eligible for such DC AEA shall ensure team members must be impartial & free of potential conflict of interest AEA shall have documented system for preparing the plan for verification or CV which should contain the task required to carried out in each type of activity, in terms of mandays.

Obligation of AEA The name and Bio data of team members shall be provided by AEA to concerned DC in advance Team shall be provided by AEA with concerned documents indicating their full responsibilities with limitations to concerned DC AEA shall ensure the confidentiality of all information & data obtained or created during verification or check verification AEA shall submit the check verification report together with certificate in Form-C to Bureau.

Check Verification The Bureau may on its own or receipt of a complaint within 1 yr from date of submission of compliance report or within six month from the date of issue of ESCerts whichever is later shall initiate action for review of compliance report which includes: a) Issuing a notice to DC and AEA asking for comment within 10 working days. b) Within 10 working days from receipt of comment, Bureau shall after taking into consideration the said comments, decide to undertake or not to undertake review and the Bureau shall record the reasons in writing for its decision;

BEE DC SDA AEA Complain Copy Issue of Notice. Comment Within 10 days Reply

Check Verification If Bureau decides to take review: it shall appoint an AEA who has not performed the verification functions with respect to the concerned DC to conduct the check- verification. on a complaint, the said check-verification shall be carried out at the cost of the complainant. The said accredited energy auditor shall assess and verify that the activities performed by the DC for compliance with the energy consumption norms and standards are in accordance with these rules. The DC shall furnish full and complete data, provide necessary documents and other facilities required by the AEA for the purpose of performing the function of check-verification under these rules.

Check Verification The AEA in-charge of check-verification function shall report the results of his assessment in a check-verification report to BEE. If he has a positive opinion, it shall be concluded that all the requirements have been met. If he has a negative opinion the effect of such opinion on the energy consumption norms and standards, issue or purchase of energy savings certificate, the liability of the AEA giving the verification report and amount of the unfair gain gained by the DC as a result of such verification report shall be calculated by the AEA conducting the check-verification. The AEA in-charge of check-verification shall submit his report with due certification in Form ‘C’ to the Bureau and the concerned State Designated Agency.

Check-verification report (Form- ‘C’) Check-verification report (Form-’C’) + ve Opinion-ve opinion All requirement regarding ECN&S & issue or purchase of ESCerts met. Effect of such opinion on ECN&S, issue or purchase of ESCerts, liability of AEA in giving verification report, amount of unfair gain gained by DC shall be calculated by AEA Amount Payable by DC

Details provided by Bureau to SDA No. of ESCerts wrongfully obtained by DC No. of ESCerts which DC was liable to purchase for non-compliance Details of misrepresentation & unfair gain due to misrepresentation. Cost of check verification

Amount Payable by DC Value of amount payable by DC shall be as worked out in report PLUS 25% of such value because of unfair practice used by DC Amount of toe of energy specified because of unfair gain Cost of check-verification

Penalties Proceedings (After Check Verification) Within 2 month from data of receipt of Form C shall initiate: Action to recover from DC the loss to central Govt. by unfair gain Penalty proceedings against persons mention in report under intimation to BEE Register complaint for unfair gain if DC doesn’t pay penalty & loss to exchequer in specified time

Timeline & activity chart TimeActivityWhereRelated work of DENA/SDA Within 3 month from Notification Action plan submissionSDA/BEE Within 3 month from conclusion of target Form A, Form B along with others documentsothers documents SDA/BEE Within 3 months after end of 1 st or 2 nd year of cycle Form A, Form B along with others documentsothers documents SDA/BEE After Completion of relevant cycle Monitoring & verification Plant Within 10 working days from date of receipt of notice Check VerificationBEEAEA

THANK YOU