April 2013 Programme and Response Analysis Workshop Windsor Hotel Nairobi, Kenya April 29 to May 1, 2013.

Slides:



Advertisements
Similar presentations
1 of 20 Information Dissemination Audiences and Markets IMARK Investing in Information for Development Information Dissemination Audiences and Markets.
Advertisements

Subsidy measurement and classification: developing a common framework Workshop on Environmentally Harmful Subsidies, Paris, 7-8 November 2002 Ronald Steenblik.
Hazard and Risk Analysis What are the socio-economic and political trends? Consider recent assessment / reviews / baseline studies / analytical exercises.
Health impact assessment explained
Performance Management within a Self Regulating FE System Phil Cox Senior Project Leader FE Self Regulation Project June 2008.
Identify Problems, Planning Objectives and Constraints.
WASH Cluster – Emergency Training S WASH STRATEGY Session 3 Strategic Planning S3 1.
The Aged Care Standards and Accreditation Agency Ltd Continuous Improvement in Residential Aged Care.
RESTRICTED Adapting to Climate Change in the UK. RESTRICTED Summer 2007 floods in the UK: 55,000+ homes and businesses flooded 140,000+ homes in Gloucestershire.
UNESCO Centre Marina Monteith and Dr Una O’Connor Bones.
Working with the Teachers’ Standards in the context of ITE. Some key issues for ITE Partnerships to explore.
Department of Tourism Department of Tourism NTSS DRAFT REVIEW FRAMEWORK NTSF MEETING 17 SEPTEMBER 2014.
Strategic Planning in Pharmacy Operations
Successor to the Strategy for Science, Technology and Innovation HRB and Department of Health Consultation Workshop 11 March 2015 Dermot Curran Assistant.
TRANSFORMING CAPABILITY SUPPORT MATERIALS LEADING VISION CREATION Scenario Planning Introduction Scenario Planning has its origins in the Shell organisation.
Improvement Service / Scottish Centre for Regeneration Project: Embedding an Outcomes Approach in Community Regeneration & Tackling Poverty Effectively.
Identify Problems, Planning Objectives and Constraints
Vulnerability and Adaptation Assessments Hands-On Training Workshop
Diabetes Programme Progress Report Dr Charles Gostling, Joint Diabetes Clinical Director October 2013.
SWOT ANALYSIS A short- hand summary of a Situational Analysis.
Africa RISING Research Framework. Research output 1: Situation Analysis and Programme-wide Synthesis. Includes the activities that are necessary to.
Richard J.T. Klein Stockholm Environment Institute and Centre for Climate Science and Policy Research, Linköping University.
Developing the Logical Frame Work …………….
Selecting a Topic. Introduction l In this presentation we will: l Introduce the process of selection of a topic; l Consider the contents of a research.
Overview of NIPP 2013: Partnering for Critical Infrastructure Security and Resilience October 2013 DRAFT.
Integrating Statistics in Development PLANNING 18 June 2014 High Level Seminar and Workshop on ACSS Strategic Plan Hotel Salak, Bogor Indonesia.
Building Strong Library Associations | Regional Convenings DAY 1 Session 5 Analysis of Constraints and Opportunities (using SWOT) and determining Outcomes.
Lecture 4 Transport Network and Flows. Mobility, Space and Place Transport is the vector by which movement and mobility is facilitated. It represents.
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
Background to the Generic Statistical Information Model (GSIM) Briefing Pack December
Local Transport Plan 3 Vision and Issues. The Local Transport Plan Will replace LTP2, which expires 31 March must have LTP3 approved and operative.
IW:LEARN TDA/SAP Training Course
SESSION 1: SETTING PRIORITIES – SITUATION ANALYSIS.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 10 Risk Management Proactively managing the positive.
Sub-Regional Workshop for GEF Focal Points in Eastern and Southern Africa Nairobi, Kenya, May 2009 Leveraging national communications to integrate.
Julie R. Morales Butler Institute for Families University of Denver.
Revising priorities in the statistical programme Management Group on Statistical Cooperation * 24 & 25 March 2011 * Carina Fransen.
CRUISE LINER STUDY – PHASE II ECONOMIC BENEFITS NATIONALLY AND REGIONALLY FIRST STEERING COMMITTEE MEETING OF CRUISE LINER TOURISM 24 MARCH, 2009.
UNESCO/IFLA Workshop on Development of Information Literacy through School Libraries in Southeast Asia September 2005 SWOT ANALYSIS.
Update on HTP Module 22 Gender-Responsive Nutrition in Emergencies GNC Annual Meeting 9 th to 11 th July 2013.
1 Policy Analysis for RISPO II National Workshop XXXXX 2006.
Integrating DRR into the CCA/UNDAF Process Introduction of new guide.
Chapter 1 The Nature of Strategic Management
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Innovative Schools toolkit Strategic Workshop 5 Project implementation, tracking and management.
By: Dr. Sumaya Ahmed Zakieldeen Institute of Environmental Studies (U OF K) National Adaptation Plan Project (NAPP) workshop November.
The Multi-Sectoral Provincial Strategic Plan for HIV & AIDS, STIs & TB of KwaZulu-Natal Presentation to PEPFAR all partners meeting Monday 28.
Role and Responsibilities of the Joint Budget Committee A conceptual framework 3 June 2003.
Food Security Response Analysis: Definitions, Tools and Potentials Overview FSNWG workshop Nairobi 29 April – May
Building Strong Library Associations | Library Associations in Society: An Overview DAY 1 Session 6 Analysis of Constraints and Opportunities (using SWOT)
Investment decision making
Advanced EFSA Learning Programme Session 4.3. Forecast Analysis & Scenario Development.
URBAN STREAM REHABILITATION. The URBEM Framework.
TCRF Strategic Planning Process A Stakeholders’ Consultative Retreat- Morogoro 26 th -27 April 2013.
SITUATION ASSESSMENT FOR HIV PROGRAMMING DR. S.K CHATURVEDI DR. KANUPRIYA CHATURVEDI.
Linking SEA and City Development Strategy (CDS) in Vietnam Maria Rosário Partidário, Michael Paddon, Markus Eggenberger, Minh Chau, and Nguyen Van Duyen.
The Manager as a Planner and Strategist. Managerial Objectives and Planning If you don’t know where you are going, any road will take you there.
CHANGE READINESS ASSESSMENT Measuring stakeholder engagement and attitude to change.
CAREER AND SKILLS TRAINING STRATEGIC FRAMEWORK Planning is key to success.
Tools for Mainstreaming Disaster Risk Reduction: Guidance Notes for Development Organisations Charlotte Benson and John Twigg Presented by Margaret Arnold.
AGRO PARKS “The Policy Cycle” Alex Page Baku November 2014.
STRATEGIES TO IMPROVE SYLLABUS DESIGN Mr. Philip Montgomery.
Chapter 2 Bring systems into being April Aims of this Lecture To explain what is “System Life-Cycle” To understand the systems engineering process.
Analisis Bisnis.
SESSION 3a Tuesday 12– Risk Allocation.
SYNTHESIS OF RESULTS - WORK IN GROUPS
Decision Framework for Prioritization of Anemia Action
URBAN STREAM REHABILITATION
Investing in Source Water Protection
Mainstreaming Climate Change Adaptation
Presentation transcript:

April 2013 Programme and Response Analysis Workshop Windsor Hotel Nairobi, Kenya April 29 to May 1, 2013

April 2013 A suggested Framework Begin with a simple conceptual model 3 main problems: Continuity (between situation analysis and planning) Consensus (relief/development; government/non-government; different sectors) Alignment (which changing livelihoods) The suggested framework has 3 main components: Population of Concern Critical Pathways Planning

April 2013 Component 1: Population of Concern People Focused Planning? Identify your area of analysis – and the clients who your planning serves Step 1Unit of Analysis (i.e. district, county) Step 2Population of Concern – it will depend on why you are tasked to support the planning Broad Groups: livelihood group, age group, sex, flood affected, drought affected, etc Step 3 Disaggregate Broad Groups (age, wealth group, sex, others?) – groups are not homogenous Identify the future state, objective or vision for the target population Step 1What is the long-term vision for this population group or sub- groups of this group?

April 2013 Component 2: Pathways Strategic analysis of moving from the current to the future? Identify potential pathways that connect the current state of the population of concern to the desired future state Step 1What are different pathways so that they can realise that vision? Step 2Prioritise: Of those different pathways, are some better than others? Are some more practical, greater benefit? Within those pathways maybe there are common elements for several of them? Conduct critical analysis of those pathways to understand the opportunities and challenges of each pathway Step 1Refer to previous critical pathway analyses or problem tree, objective tree, VCA, CBDRR etc or similar analysis to understand why the population of concern is in their current condition, what constraints or threats they will encounter on their pathway, how they will be overcome. If none has been done, do one. Identify critical elements (success or challenges) of the pathway which will form the intervention points of the plan Step 1Re-analyse the pathway to identify critical success factors and critical threats Step 2What are options for interventions to enable either the success of a critical factor or which can reduce the negative impact of a threat?

April 2013 Component 3: Plans Good plans built on broad input, experience but also need a common focus – at which point does response analysis pass the baton to the operational planners? Generate short and long-term options – addressing critical success factors and challenges – with the input of from a wide range of expertise and experience Step 1Review critical factors and options with others (sectors, experience, etc.) to get a broad perspective on how to best ensure the success of that pathway, prioritise options – and to increase consensus. Rank those options against a criteria (congruence with pathway analysis, existing plans/policies, current activities) Step 1Review experiences – why hasn’t this been done in the past? What has worked? What hasn’t worked? What’s actually made an impact? Step 2Review existing plans policies/priorities etc – to find existing actions, plans, activities which could be linked to the population of concern Outline a plan – which can be further developed within operational or contingency planning structures Step 1Hand over this planning outline to those directly involved in the planning process for detailed examination, input, guidance, etc.