Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations The planning concept - current status Detlef Koschny Space Science Department ESA/ESTEC.

Slides:



Advertisements
Similar presentations
Model Specification Requirements MSRATF Meeting – Mar 11, 2013 Stephanie Lu, MVWG Chair Seattle City Light.
Advertisements

Construction process lasts until coding and testing is completed consists of design and implementation reasons for this phase –analysis model is not sufficiently.
Configuration Management
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
WebEOC Training Spring 2013
Chapter 15 Design, Coding, and Testing. Copyright © 2005 Pearson Addison-Wesley. All rights reserved Design Document The next step in the Software.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
© 2005 by Prentice Hall Chapter 4 System Testing & Implementation Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F. George Joseph.
Lecture 7 Model Development and Model Verification.
Open Cruise Requirements status and planning LSWT#4, Venice 30/03-01/ LSWT#4.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
JPL Autonomous Space Mission Simulation Flight Team Bob Hoffman Josh Ruggiero Adam Nikolic Dusty Terrill.
09 May 2014page 1 ROCC to PPL ICD Initial Definition ExoMars Rover Operations Control Center ROCC.
Working with SharePoint Document Libraries. What are document libraries? Document libraries are collections of files that you can share with team members.
EMC Quiet Planning During Science Operations Andrew Walsh & Chris Watson Solar Orbiter SOC, ESAC, Madrid EMC Working Group #12, Imperial College,
Compliance Monitoring Audit Tutorial Version 1.0 April 2013.
System Implementation. System Implementation and Seven major activities Coding Testing Installation Documentation Training Support Purpose To convert.
RSOC System Testing Status - 1 RSOC System Test Concept –Covered in RO-EST-PL-5013 –Status to be presented at key system reviews (GSRR) Connectivity Tests.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Available Tools for planning and Data Processing I. Musso.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Site DB creation and updates 05/08/2006 by Performance Team.
SOPS: The Science Operations Planning System for the first ESA Lunar Mission SMART-1.
SGS: Activities and Requests Helen Middleton. Hermean Environment Working Group Meeting | SGS Team | Key Largo | 16/05/2013 | Slide 2 Contents 1.ESAC.
MG 1/10/01 1 PCS SMOV-3B Review Objectives Overview Activity Descriptions Requirements.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
.1 RESEARCH & TECHNOLOGY DEVELOPMENT CENTER SYSTEM AND INFORMATION SCIENCES JHU/MIT Proprietary Titan MESSENGER Autonomy Experiment.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Artificial Intelligence Research Center Pereslavl-Zalessky, Russia Program Systems Institute, RAS.
Planetary Missions Division Dvk, 16 Jul 2002 Interfaces - presented at the SWT #10 To clarify the situation with interfaces, formats, etc. Summary: There.
Planetary Missions Division Dvk, 26 Jun 2002 Pointing scenario - presented at the SWT #10 Daily schedule Overall status/How to proceed Status of inputs.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
NASA Update NDIA PMSC Quarterly Meeting August 26, 2010 NDIA PMSC Quarterly Meeting August 26, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis.
1/15/02Bowman/Harch1 CONTOUR Science Ops Update Ann Harch Cornell University (607) Alice Bowman Applied Physics.
1 Proposal and Observation Handling Ravi Sankrit (User Support Scientist) SSSC May 11, 2011.
CIVA Status Venezia, Palazzo Cavalli Franchetti March 31, 2009 Philae Science Team Meeting.
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations Experimenter to RSOC interfaces Detlef Koschny Space Science Department ESA/ESTEC
1/106 December 2001Rosetta SOWG Status of the Rosetta Project TestBed (PTB) P. van der Plas Modelling and Simulation Section ESA/ESTEC ESA/Estec 6 December.
P. Mokashi IES Team Meeting, SwRI 29 May IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.
Background  EM16 SGS+TEC met with FD 1 year ago  Both sides agreed that there was a “performance gap:  SGS prepared a TN with 2 main options to bridge.
ESA UNCLASSIFIED – For Official Use HSO-OP - Solar and Planetary Missions Division Solar Orbiter Instrument Operations, Data Handling and FDIR Ignacio.
INFO 638Lecture #91 Software Project Management Conclude Adaptive Project Framework INFO 638 Glenn Booker.
Joint Research Centre the European Commission's in-house science service NON-EXHAUST PARTICLE EMISSIONS.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Mission Planning Concepts
The road to the first E2E tests
Rosetta Science Working Team Meeting #26 Working Group #1
19 May 2010, ESOC Eberhard Grün and Harald Krüger
RSOC Overview at SWT #26, 11/12 June 2009
Instrument Teams to SOC Test Specifications
ROSETTA SWT 27th ESOC, 2-4 December 2009
WG1 Report Osiris Lander delivery Support and Science activities during Comet approach.
Pre-landing Orbiter Observations
Geometric information for VIRTIS-M data
Lutetia geometry and timeline
Mars Swingby (MSB) information
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
RLGS Status / LCC B. Pätz, DLR/MUSC.
GLAST Large Area Telescope:
GIRO usage and GSICS Lunar Observation Dataset Policy S. Wagner
IS442 Information Systems Engineering
SDO Flight Dynamics Subsystem
Carbon Action Items Status
What is Project Cost Management?
LAT Operations Scenario Subsystem Meetings
PSS verification and validation
Presentation transcript:

Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations The planning concept - current status Detlef Koschny Space Science Department ESA/ESTEC Naming conventions Science operations planning - general remarks The three planning cycles Presented at the Rosetta Science Operations Working Group Meeting (SOWG) #5, 11 Jul 2001

Solar System Division DVK, 10 Jul 2001 Naming conventions - I Mission phase:  Based on the CREMA but subject to modifications depending on the activities to be performed in the individual phases, defined in the EID C  Major time division of the Rosetta mission  Mission phase has a definite start event and end event  Example: Far approach phase (FAT) - starts when Comet Acquisition Point (CAP) is reached, ends when Approach Transition Point (ATP) is reached Mission scenario:  A part of the mission fulfilling a certain set of science goals  Typically requires a dedicated trajectory  Within one mission phase, mission scenarios can be repeated more than one time  Example: Dust/gas jet sampling, Interference scenario

Solar System Division DVK, 10 Jul 2001 Naming conventions - II Science Activity Plan (SAP):  A list of mission scenarios for the complete mission phase  ESOC expects one SAP before each mission phase Master Science Plan (MSP):  The MSP describes the science operations for one given mission scenario on top level  Contains a list of the planned experiment operations, at least down to mode level (see tutorial on EPS, mode transition diagram, later in this meeting)  Contains the requested trajectory of the spacecraft  Contains the requested pointing of the spacecraft

Solar System Division DVK, 10 Jul 2001 Science operations planning - general remarks  In commissioning phase: “procedural” approach with Flight Control Procedures (FCPs)  Cruise, fly-bys: Transition to usage of Orbiter Instrument Operations Request (OIOR) and Lander Operations Request (LOR) files  Latest in comet phase: A three-step approach will be used (contents of the three cycles slightly changed as a result of the last review, especially lessons learnt from NEAR-Shoemaker and Cassini):  Long-term planning  Medium-term planning  Short-term planning  All operational timelines will be uploaded to the spacecraft in a “Mission Timeline” which will be executed autonomously on board. The Mission Timeline is valid for typically a few days.

Solar System Division DVK, 10 Jul 2001 The three planning cycles - I Long-term planning:  Goal: A baseline SAP shall be available before each mission phase.  Activities:  Scenario development (scenario description, Master Science Plan)  Science Activity Plan (SAP) development  Schedule: Has started already (see “Pointing Scenario” discussion, this meeting). Covers the complete mission Medium-term planning:  Goal: Ensure that the planning process was done at least once in all detail (fly-bys, comet phase)  Activities:  For each mission scenario, generate baseline POR file (based on baseline SAP, baseline scenarios)  Build up a “library” for operations  Schedule: ca. 2 years before Comet Acquisition Point is reached. Covers the comet phase (fly-by phases)

Solar System Division DVK, 10 Jul 2001 The three planning cycles - II Short-term planning:  Goal: To actually perform the science operations at the comet  Activities:  POR file generation  Update SAP and scenario plans only if needed  Schedule: After Comet Acquisition Point is reached, until end of mission. Typically one planning period will cover one week

Solar System Division DVK, 10 Jul 2001 PTB simulations EPS mode level checks Long-term planning - scenario development Experi- menter RSOC RMOC Produce science requests, document in EID-B, UMs,SWT... Group science requests, formulate science goals for given scenario Produce Scenario Para- meter List (SPL) Create a sample trajectory, pointing, slewing Flight Dynamics Team to comment Compile baseline scenario document with descriptive text, trajectory, mode- level ops, pointing, events, detailed ops where needed Provide inputs Iterate FDT and FCT to provide inputs SOWG Meeting Final scenario description, Master Science Plan

Solar System Division DVK, 10 Jul 2001 Long-term planning - Science Activity Plan development Experi- menter RSOC Trajectories from scenario studies Prioritise scenarios, put low-risk items in beginning Science requests vs. time in mission, document in EID-B, UMs,SWT... Order scenarios Compile draft Science Activity Plan (SAP) Iterate Provide inputs SOWG Meeting FDT and FCT to provide inputs Baseline Science Activity Plan (SAP) RMOC

Solar System Division DVK, 10 Jul 2001 Medium-term planning - POR file generation Experi- menter RSOC RMOC Update Scenario Parameter List (SPL) FDT produces new predicted trajectory info: -> pointing + slewing boundaries -> event file -> trajectory (x/y/z) Update Master Science Plan (MSP) with new pointing; propose changes to mode level ops of experiments Fill in detailed ops, possibly update pointing requests -Update final pointing requests -Update consolidated POR file -Check for conflicts Iteration Provide inputs Final PTR POR FDT produces final real pointing Iteration Provide inputs Final POR to Flight Control Team FDT = Flight Dynamics Team

Solar System Division DVK, 10 Jul 2001 Short-term planning - POR file generation Experi- menter RSOC RMOC Update Scenario Parameter List (SPL) FDT produces new predicted trajectory info: -> pointing + slewing boundaries (FTL file) -> events (OEF) -> trajectory (x/y/z) Update Master Science Plan (MSP) with new pointing; propose changes to mode level ops of experiments Fill in detailed ops, possibly update pointing requests -Update final pointing requests -Update consolidated POR file -Check for conflicts Iteration Provide inputs Final PTR POR FDT produces final real pointing, update FTL Iteration Provide inputs Final POR to Flight Control Team NOTE: The dotted boxes will be done under major time pressure (lesson learnt from NEAR experience) FDT = Flight Dynamics Team

Solar System Division DVK, 10 Jul 2001 Mission scenarios – Tutorial examples Pointing scenario  “Science” goal: (a) Point to a certain star, the Earth, or the Moon. This will allow the experimenter to calibrate their experiments. (b) Measure the co-alignment of the Navigation Cameras (CAM), the Star Trackers (STR), and the remote-sensing experiments.  Trajectory: Don’t care.  Priority experiments: All remote-sensing instruments Interference scenario  “Science” goal: To operate experiments in parallel to find potential conflicts.  Trajectory: Don’t care.  Priority experiments: Depends on details.