2014 State Veterans Homes VA Survey Deficiency Overview Valarie Delanko JoAnne Parker Office of GEC Operations (10NC4)

Slides:



Advertisements
Similar presentations
Elements of an Effective Safety and Health Program
Advertisements

The Regulatory Perspective
Facilities Management and Design Chapter 4 Safety and Security systems.
Emergency Preparedness and Response
Fire and Environmental Safety Health, healing and hope.
Initiating Devices Manual Fire Alarm Boxes Ionization Smoke Detectors
NFPA 72 and NFPA 101 Supervised Automatic Sprinkler System Overview
Improving outcomes for older people: Monitoring and regulating standards Ann Close 8 th June 2011.
Safety and Health Management Program
© Wipfli LLP 1 Date or subtitle © Wipfli LLP Jeff Bramschreiber, CPA, Partner Wipfli Health Care Practice Iowa Association of Rural Health Clinics RHC.
Restrictive Procedures Certification Certification required. A license holder who wishes to use a restrictive procedure with a resident must.
Rural Health Clinic Survey and Recertification Presented by: BethAnn Perkins, RN, Principal IRHA June 11,2014.
25 TAC Quality Assurance in a licensed ASC
DEVELOPING A COMPREHENSIVE CARE PLAN PRESENTED BY LEAH KLUSCH EXECUTIVE DIRECTOR THE ALLIANCE TRAINING CENTER.
School Safety Training
Regulatory Body MODIFIED Day 8 – Lecture 3.
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Palliative Care in the Nursing Home. Objectives Develop an awareness of how a palliative care environment can be created. Recognize the need for changes.
Course Code: SW-SFTY.  Sizewise Rentals is committed to working with our employees to provide a safe work place.  It is our policy that employees should.
STATE VETERANS HOME Program Updates Nancy Quest Office of Geriatrics and Extended Care Patient Care Services Department of Veterans Affairs.
Ted “Smitty” Smith  This slide show contains multiple timed questions. All questions can be answered using the International Fire Code, The National.
Chapter 14: Inspection and Maintenance
Surviving Survey and Re-certification. Rural Mississippi Mississippi Stats ◦116 Hospitals ◦154 RHC’s (MSDH website) ◦28 CAH’s (35miles or “necessary.
The Medical Director F Tag-501Guidance* Kurt Hansen MD, CMD Douglas Englebert RPh September 29, 2005.
EGRESS AND FIRE PROTECTION
2015 State Veterans Homes VA Survey Deficiency Overview Valarie Delanko JoAnne Parker Office of GEC Operations (10NC4)
Minimal Standards Using NYSOFA Regulations Presented January, February, March and April 2013 at the NYSADSA/FPWA Social Adult Day Services Events.
Xavier Castorena, MSW Social Work Consultant III Children’s Medical Services OVERVIEW OF PARTNERS FOR CHILDREN WAIVER HEALTH AND WELFARE STANDARDS.
Lisa Thomas RN-BC State Training Coordinator November 6, 2014.
Appendix B: Restorative Care Training Presentation Audience: All Staff Release date: December

2013 State Veterans Homes VA Survey Deficiency Overview Valarie Delanko JoAnne Parker Office of GEC Operations (10NC4)
JCAHO UPDATE June The Bureau of Primary Health Care is continuing to encourage Community Health Centers to be JCAHO accredited. JCAHO’s new focus.
2012 State Veterans Homes VA Survey Deficiency Overview JoAnne Parker Kelly Mingle Office of GEC Operations (10NC4)
# 1: F 282 The services provided or arranged by the facility must be provided by qualified persons in accordance with each resident’s written plan of.
2015 State Veterans Homes VA Survey Deficiency Overview For NASVH Summer Conference Sandusky, OH Valarie Delanko JoAnne Parker Office of GEC Operations.
National Association of State Veterans Homes State Veterans Home Program Office of Geriatrics and Extended Care, Patient Care Services, Department of Veterans.
FIRE DRILLS David McMahon, RS, MPH Phoenix Area Indian Health Service.
COMPLAINT INVESTIGATION UNIT(CIU) Bureau of Health Systems Division of Operations Department of Community Health.
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
STATE VETERANS HOME Survey Process Updates Nancy Quest Office of Geriatrics and Extended Care Patient Care Services Department of Veterans Affairs.
Partners for Children Quality Improvement Health & Welfare Jill Abramson, MD MPH February15, Training.
Division of Nursing Home Monitoring Promoting quality of care and quality of life for Michigan’s Nursing Home Residents (517) Fax (517)
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
06/01/20161 Benny Hoff TÜV NORD Sweden AB AFS 2002:1 Use of pressure equipment.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
National Association of State Veterans Home Winter Conference National Association of State Veterans Home Winter Conference Jo Anne Parker, MHSA Program.
Safety and Health Program Don Ebert- Risk Manager (509)
The purpose of installing fire fighting equipments is to protect the public, property, and assets in fire emergency. Manufacturers of fire protection.
State Veterans Homes VA Survey Overview Valarie Delanko JoAnne Parker Office of GEC Operations (10NC4) Winter Conference 2016.
Prepared by: Imon Rahman Lecturer Department of Pharmacy BRAC University.
NANCY CHOBIN, RN, AAS, ACSP, CSPM, CFER CHOBIN & ASSOCIATES CONSULTING HOT TOPICS IN STERILIZATION AND DISINFECTION.
Safety and Infection Control: Reporting of Incident / Event / Irregular Occurrence / Variance & Safe Use of Equipment Lorelei Sepulveda 1.
Overview Role and function of the Authority
CMS Requirements for Life Safety Code (LSC).
Medical Directors Meeting
Post Survey Protocol Kenny williamson keith Harbuck keith & holmes llc
2015 Nursing Home Survey and Enforcement Actions
Clinical Engineering Lecture (3).
Fire Alarm Systems for Emergency Operations of Elevators
Hot Topics and Trends in LTC
Lucrecia Johnson MSW, LSW Mary Bartlett MSW, LISW-S
Electrical Receptacle Testing
MINNESOTA STATE FIRE MARHSAL DIVISION HEALTHCARE TEAM
CMS Update October 6, 2013 Steven Chickering
Emergency Preparedness Requirements
Elements of an Effective Safety and Health Program
National Fire Protection Association Update
Elements of an Effective Safety and Health Program
Presentation transcript:

2014 State Veterans Homes VA Survey Deficiency Overview Valarie Delanko JoAnne Parker Office of GEC Operations (10NC4)

Discussion Topics Top Deficiencies cited: January 2014 thru May 2014 for Nursing Home Care and Domiciliary. Recognition survey updates 2

SVH Program Census Current SVH Program Structure offering three levels of care: – 149 State Veterans Home Facilities 140 Nursing Home Care programs (24,163 beds) 54 Domiciliary Care programs (5,865 beds) 2 Adult Day Health Care programs (85 participant slots) 3

Surveys Types (May) 4

Totals FunctionJan – May Number of nursing home care surveys7197 Number of surveys with deficiencies47 (66%)68 (70%) Number of nursing home care deficiencies Avg. number of deficiencies per survey Number of domiciliary surveyed3054 Number of surveys with deficiencies10 (33%)23 (42%) Number of domiciliary deficiencies2856 Avg. number of deficiencies per survey

IJs to present Total Cited Accidents #108 (4): Coffee burn; widespread falls; eating vs NPO; safe smoking practices Necrotic tissue; Dish machine temperatures; Foley catheter Staff/resident incident; elopement risk; drug/drug interaction 6

Top NH standards Line # Regulation Number Standard Frequency % a. Facility meets applicable provisions of the 2009 Life Safety Code of National Fire Protection Association. 9443% b. 1-4 An emergency electrical power system is provided in accordance with NFPA; on-site emergency standby generator of sufficient size to serve connected load. 167% i Ensure environment remains free of accident hazards as is possible and residents receive adequate supervision and assistance devices to prevent accidents. 199% e. 2 Comprehensive care plan is: developed within 7 calendar days after assessments, prepared by an interdisciplinary team and periodically reviewed and revised after each assessment. 136% e. 3 Services provided or arranged by facility must meet professional standards of quality and by qualified persons in accordance with the care plan. 136% e. Comprehensive care plan is: individualized that includes measurable objectives and timetables to meet residents physician, mental and psychosocial needs that are identified in the comprehensive assessment. 63% d Pressure sores: Based on comprehensive assessment, resident enters facility without sore does not develop one unless clinical condition is unavoidable and having one receives necessary tx and services to promote healing. 42% c. Facility management must ensure all alleged violations are reported immediately to administrator/officials per state law; have evidence violations are thoroughly investigated; results reported back to administrator with appropriate corrective action if verified. 42% 7

Top DOM standards Line # Guideline Number Standard Frequency % Safety C. There is evidence reported that reported life safety deficiencies have been or are being corrected. 1968% Safety D. Facility has available an emergency source of electrical power to provide essential service when normal electricity supply is interrupted. 311% Medical D. A patient treatment plan is established and maintained for each domiciliary patient. 14% Medical E. Primary Care medical services are provided for domiciliary patients as needed. 14% Pharmacy D. Patient on self-medication are instructed by qualified personnel on proper use of drugs. 14% Nursing D. Nursing Service participates in the establishment and maintenance of a treatment plan for each domiciliary patient. 14% Dietetics E. Dietetic Service personnel practice safe and sanitary food handling techniques. 14% Pharmacy F. There is an established system for monitoring the outcome of drug therapy or treatment. 14% 8

NH Line # Regulation Number Standard a. Facility meets applicable provisions of the 2009 Life Safety Code of National Fire Protection Association. YEAR: # Deficiencies: Examples: Automatic fire alarm control panel (FACP) reports a supervisory visual notification trouble signal on the panel, but no action taken. Fail to maintain the automatic sprinkler systems, complete and document required inspection, testing, and maintenance services in accordance with established code inspection frequency. No documented weekly no-flow churn test for the fire pump. No documentation of biannual smoke detector sensitivity testing for the smoke detectors. Fail to maintain smoke barrier doors that would close and resist the passage of smoke and provide rated doors for hazardous areas - edge gaps on doors exceeding the permissible 1/8” inch clearance, doors fire ratings are insufficient for a hazardous area. Exits shall terminate directly at a public way or at an exterior exit discharge that is safe. Fail to provide a Digital Alarm Communicator Transmitter (DACT) system in an area where the alarm is likely to be heard by staff. 9

NH Line # Regulation Number Standard b. 1-4 An emergency electrical power system is provided in accordance with NFPA; on- site emergency standby generator of sufficient size to serve connected load. YEAR: # Deficiencies: Examples: Fail to perform the weekly inspection and document monthly load tests of the Emergency Power Supply System (EPSS). Generator did not have a remote manual emergency stop station installed outside of the generator compartment as required by code. Generators load bank test not completed. 10

NH Line # Regulation Number Standard i. 1-2 Ensure environment remains free of accident hazards as is possible and residents receive adequate supervision and assistance devices to prevent accidents. YEAR: # Deficiencies: Examples: Fail to provide adequate supervision and/or safety devices. Fail to provide adequate supervision/monitoring of the proper feeding techniques specified by Speech Therapy to prevent aspiration. Fail to ensure that adequate supervision provided while attempting to self- transfer and left unattended in the bathroom. 11

NH Line # Regulation Number Standard e. 2 Comprehensive care plan is: developed within 7 calendar days after assessments, prepared by an interdisciplinary team and periodically reviewed and revised after each assessment. YEAR: # Deficiencies: Examples: Fail to review and revise the resident care plan to prevent accidents i.e., adjust for dysphasia. Failed to revise care plans, i.e., resident’s inappropriate behaviors that caused the burn with interventions to prevent re occurrence, as needing close monitoring to prevent altercations with other residents. 12

NH Line # Regulation Number Standard e. 3 Services provided or arranged by facility must meet professional standards of quality and by qualified persons in accordance with the care plan. YEAR: # Deficiencies: Examples: Interventions on resident care plan were not being followed, i.e. failed to provide toileting assistance as care planned, failed to ensure the fall alarm equipment functioned properly, failed to utilize hipsters as care planned and failed to provide appropriate monitoring for safety after administration of an as needed medication during an acute episode of anxiety. Fail to ensure assessments met professional standards of quality and were provided in accordance with each resident’s written plans of care; i.e. shunt not assessed returned from dialysis, no monthly labs, pressure ulcer tx not provided as ordered. nurse failed to document the nature of the burns, failed to complete an incident report to include measures to prevent further occurrence of such accidents, and failed to report to the physician for examination of the injury and possible treatment orders. 13

DOM Line # Regulation Number Standard Safety C. There is evidence reported that reported life safety deficiencies have been or are being corrected. YEAR: # Deficiencies: Examples: Does not have quarterly automatic (wet & dry) sprinkler system's inspection and test reports. Fail to properly maintain the automatic fire sprinkler system fire pump, complete or document weekly inspection services, and recalibrate or replace system pressure gauges. Fire pump pressure gauges overdue for a 5 year calibration or replacement inspection. No weekly fire pump inspection services. No-flow churn test were not being performed. No documented fire drills for each shift in each quarter. Fail to establish an inspection, testing and maintenance program for the battery-powered illumination devices installed within the facility - no monthly 30 second or annual 90 minute program for the inspection. Lack of annual inspection, testing and maintenance services for the portable fire extinguishers. 14

DOM Line # Regulation Number Standard Safety D. Facility has available an emergency source of electrical power to provide essential service when normal electricity supply is interrupted. YEAR: # Deficiencies: 1043 Examples: Fail to perform the weekly inspection and document monthly load tests of the Emergency Power Supply System (EPSS). Generator did not have a remote manual emergency stop station installed outside of the generator compartment as required by code. Generators load bank test not completed. 15

Recognition to New State Veterans Homes Effective Per Diem Date Date Letter Signed SVHBeds 11/06/1301/07014Payson, UT108-BED NHC 10/17/1301/06/14Kinston, NC100-Bed NHC 10/24/1302/24/13Ivins, UT108-Bed NHC Changes to Existing State Veterans Homes 08/15/1306/13/14Bennington, VT171-Bed NHC (6-Bed Reduction) Recognition Packages in VA Concurrence Redding, CA90-Bed DOM West Los Angeles, CA84-Bed DOM Addition Marshalltown, IA509-Bed NHC (64-Bed Reduction) 16

Contacts Valarie Delanko, RDN, LDN, CPHQ National Program Manager SVH Quality & Survey Oversight Jo Anne Parker, MHA National Program Manager SVH Survey Process 17