Containment and Disposal of Waste Water in HP and UHPWJ Operations Richard A. Burgess KTA-Tator, Inc.

Slides:



Advertisements
Similar presentations
Removing Coatings and Cleaning Masonry Substrates
Advertisements

Preparing a Coating Inspection Plan
LOCAL IPP REGULATIONS SEWER USE ORDINANCES Sandra Diorka Director of Public Services Delhi Charter Township.
Calculating Coating Lifetime Costs
Industrial Graphic Solutions Designed to Meet Your Sophisticated Markings Needs. EXPECT MORE FROM MUIR..
TRP Chapter Chapter 6.3 Biological treatment.
Treatment of Slaughterhouse Wastewater
Steps to a More Effective UHP Waterjetting Operation Presented by: Rick Dupuy UHP Projects, Inc.
 Carry both sewage and storm water.  During average rainfalls the volume of water is 5-15 times greater than normal.  Sewage treatment plants are not.
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Fleet Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental.
Waterjetting—New Standards for Assessing End Condition Cleanliness
THE TEXTILE CLEANING PROCESS CHARLES L. RIGGS, Ph.D. Texas Woman’s University.
Petrotech Southeast, Inc. Oil Water Separator Maintenance.
Oil The Problem: Crude oil tank bottoms contain settled inorganic particles which create a very tacky sludge at the bottom of storage tanks. The inorganics.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
SYNTHETIC RED OXIDE METAL PRIMER It has good anti-corrosive properties. It contains Zinc-chrome. Recommended for agricultural, steel structures & other.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Steps to a More Effective Power Tool Cleaning Presented by: Earl Bowry, Jotun Paints, Inc.
Power Washing and Overcoating is Effective and Much Less Expensive than Sandblasting and Completely Repainting a Bridge by Wayne Senick, Technical Director.
Maximize Effectiveness and Protect the Environment IV Pest Control Operators of California.
On-Site Leachate Management RM of Tache Pilot Study.
Standards, Training, and Certification in the Oil and Gas Industry Presented by: Ernst Toussaint, TransCanada.
ICIS © Copyright , All Right are reserved.
Hydraulics.
Wednesday, 12/12/2007, FYROM Prevention of Contamination from Mining & Metallurgical Industries in FYROM Strategic Plan for Prevention of Contamination.
Busting The Myths of Wet Abrasive Blasting
Flotation Flotation involves separation of solids from the water phase by attaching the solids to fine air bubbles to decrease the density of the particles.
Applying Coatings over Flash Rust in a Marine Environment
Introduction to Environmental Engineering Code No. (PE389) Lec. 5 and 6.
Advanced Machining Processes
Lease Automatic Custody Transfer
Water Supply.
Bangkok, Thailand June Measures for the Safe Removal, Collection and Disposal of Harmful Anti-fouling Systems Edward Kleverlaan IMO-Technical Officer.
P H S A U T O M I V E ALS Lubrication.
Nutrient Inventory and Storage and Handling (Planner Training) John W. Worley.
HYDRAULICS & PNEUMATICS
Engineering Controls for Silica Art Wickman, CIH Georgia Tech Safety & Health Consultation Program.
Pollutants in wastewater -- Revisited Ammonia Organic matter Nutrients Pathogens Color Metals and SUSPENDED SOLIDS.
LEAD SAFETY PROGRAM. REFERENCES 29 CFR CFR MCO F CHAPTER 17 BASE INSTRUCTION Lead Abatement 29 CFR MCO F HUD.
Presented by: Tony Serdenes, Greenman-Pedersen
(U-shaped tank) WATER TANK SLUDGE TANK This system makes it possible to recover the liquid part of the suctioned material in the sludge compartment.
Advanced Aeration, Inc. Presentation of Vacuum Bubble ® Technology.
Electrochemical Machining (ECM)
Impairments to Water Quality. Module Topics What is Water Quality? What are Pollutants? Types of Water  Stormwater  Wastewater  Process water.
Application of Thermal Spray
Paint Removal from CMU and Brick Kenneth A. Trimber KTA-Tator, Inc.
Standards, Training, and Certification in the Wastewater Industry Presented by: Bob Murphy, Sherwin Williams.
Vessel Wash Wastewater Management – Options for Marinas Presented by: Michael J. Danko New Jersey Sea Grant Consortium Virginia Marine Trades Conference.
Unit A 6-4 Mechanical Systems and Technology. Problem Area 6 Agricultural Power Systems.
15 Water Supply. 15 Objectives (1 of 2) Discuss rural water supplies. Describe how portable tanks are used to supply water for firefighting. Describe.
Separators Types of Dust Separator Cyclone Separator working & types Critical Parameters Advantages Disadvantages Applications maintenance.
Engineered systems for wastewater treatment and disposal.
Village of Morton Wastewater Treatment. The Village of Morton Wastewater Treatment Department duties Operate and maintain 2 treatment plants (Biosolids.
Learning Objectives ˗ Specification Components ˗ Consideration of Variables.
CTC 450 Review WW Sludge Processes.
PNEUMATICS Chapter 5 Secondary Air Treatment
How to Select and Optimize Abrasive Blasting Equipment
Advanced Aeration, Inc. Presentation of Vacuum Bubble® Technology
Wastewater Treatment.
SURFACE PREPARATION BY BLAST-CLEANING
NACE SPECIFICATION White Metal Blast Cleaning
Wastewater Treatment.
Specification Components Consideration of Variables
Darin Boling / CorrStream Technical Specialist
Wastewater Treatment.
John Kern SSPC Technical Services Dept.
Wastewater Treatment.
Wastewater Treatment.
Objectives of Pollution control o Prevention of nuisance o Prevention of physical damage to property o Elimination of health hazards to plant personnel.
Pneumatic System Conditioning
Presentation transcript:

Containment and Disposal of Waste Water in HP and UHPWJ Operations Richard A. Burgess KTA-Tator, Inc.

Containment and Disposal of Waste Water in HP and UHPWJ Operations Overview of HPWJ & UHPWJ Surface Preparation Waste Generation Issues Unique to HPWJ & UHPWJ General Containment Design Considerations- Guide 6 Management of Wastes Generated Disposal Options

Overview of HPWJ & UHPWJ Surface Preparation Equipment Definitions and Terminology Cleanliness Standards

HPWJ Ship’s Hull with Lances

Jetting Lance Rotating Barrel and 5 Jet Tips

Remotely Operated Unit- Ship

Different Design of Remotely Operated Waterjetting Unit

Hand Held Shrouded WJ Unit

Definitions and Terminology Waterjetting (WJ): Use of standard jetting water discharged from a nozzle at pressures of 70 MPa (10,000 psig) or greater to prepare a surface for coating or inspection. Water Cleaning (WC): Use of pressurized water discharged from a nozzle to remove unwanted matter from a surface.

Definitions and Terminology Low-Pressure Water Cleaning (LP WC): Water cleaning performed at pressures less than 34 MPa (5,000 psig). This is also called “power washing” or “pressure washing.” High-Pressure Water Cleaning (HP WC): Water cleaning performed at pressures from 34 to 70 MPa (5,000 to 10,000 psig).

Definitions and Terminology High-Pressure Waterjetting (HP WJ): Waterjetting performed at pressures from 70 to 210 Mpa (10,000 to 30,000 psig). Ultrahigh-Pressure Waterjetting (UHP WJ): Waterjetting performed at pressures above 210 Mpa (30,000 psig).

Cleanliness Standards Joint Surface Preparation Standard SSPC-SP 12/NACE No. 5 Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating Revised July 2002 Approved 1995

Cleanliness Standards WJ-1 Clean to Bare Substrate: A WJ-1 surface shall be cleaned to a finish which, when viewed without magnification, is free of all visible rust, dirt, previous coatings, mill scale, and foreign matter. Discoloration of the surface may be present.

Cleanliness Standards WJ-2 Very Thorough or Substantial Cleaning: A WJ-2 surface shall be cleaned to a matte (dull, mottled) finish which, when viewed without magnification, is free of all visible oil, grease, dirt, and rust except for randomly dispersed stains of rust, tightly adherent thin coatings, and other tightly adherent foreign matter. The staining or tightly adherent matter is limited to a maximum of 5% of the surface.

Cleanliness Standards WJ-3 Thorough Cleaning: A WJ-3 surface shall be cleaned to a matte (dull, mottled) finish which, when viewed without magnification, is free of all visible oil, grease, dirt, and rust except for randomly dispersed stains of rust, tightly adherent thin coatings, and other tightly adherent foreign matter. The staining or tightly adherent matter is limited to a maximum of 33% of the surface.

Cleanliness Standards WJ-4 Light Cleaning: A WJ-4 surface shall be cleaned to a finish which, when viewed without magnification, is free of all visible oil, grease, dirt, dust, loose mill scale, loose rust, and loose coating. Any residual material shall be tightly adherent. (Dull Putty Knife Test)

Cleaning a Tank Interior

1.4 Visual Reference Photographs: SSPC-VIS 4/NACE VIS 7, “Guide and Reference Photographs for Steel Surfaces Prepared by Waterjetting,” provides color photographs for the various grades of surface preparation as a function of the initial condition of the steel. The latest issue of the reference photographs should be used.

Initial Condition H Deteriorated brittle multi- coat painting system

Pressure and Flow Rate Pressure at Nozzle 70 MPa (10,000 psig) Flow 12.9 L/min (3.42 gpm) Pressure at Nozzle 140 MPa (20,000 psig) Flow 8.3 L/min (2.2 gpm) Pressure at Nozzle 280 MPa (40,000 psig) Flow 2.0 L/min (0.52 gpm)

Energy 70-MPa (10,000-psig) Jets may not significantly erode the coatings- they are typically used for partial removal or for cleaning loose detritus

Energy 140-MPa (20,000-psig) Jets erode the coatings fairly rapidly- typically used for partial removal.

Energy 280-MPa (40,000-psig) Jets erode and destroy coatings very fast - typically used when most or all of the coating is to be removed

Quantity of Waste Water PSI GPM Lbs/Hr a Ft 3 /Hr 10, , ,000 b a-A gallon of water weighs 8.34 lbs. b-At this level of energy surfaces dry quickly due to heat

Production Rates Selective stripping of outer hull coatings open- cycle, hand held lance- 39 ft 2 /hr/gun - 89 ft 2 /hr/gun. Sweep and spot “water-blast” inside of tanks with hand-held lances- 157 ft 2 /hr/gun ft 2 /hr/gun

Production Rates Sweep and spot “water-blast” of outer hull coatings with hand-held lances – Average, 198 ft 2 /hr/gun Complete removal of severely damaged outer hull coatings with hand-held lances- Average, 152 ft 2 /hr/gun

Production Rates Automated Complete removal of non-skid flight deck to bare metal closed loop machine- Average, 134 ft 2 /hr/unit. Complete removal of outer hull coatings to bare metal open-cycle machine- Average, 471 ft 2 /hr/unit.

Waste Stream Characteristics Influenced by The condition of the existing coating Pressures employed Volume of water used

Waste Generation Issues Unique to HPWJ & UHPWJ Mists and Gravity Quantity-Flow Rate and Volume Energy- Fluids Slurries Sludges Solids

Mists and Gravity Mists, droplets of water suspended in the air that can contain small particulates including pigments and particles of coating Water flows due to gravity, just like abrasives- but water will find and collect in the lowest point- seeks it own level.

Fluids Slurries Sludges Solids Fluid, liquid water where the solids content does not influence the flow or movement Slurry, liquid water with suspended insoluble solids being carried and influencing flow Sludge, wet or moist solids that settle and resist flow Solids, mostly caked particles with little moisture content

General Containment Design Considerations, SSPC-Guide 6

Containment Classes Materials, Penetrability and Permeability

Containment Classes Ventilation

Table W Containment Notes Note 1: When designing a ventilation system, care must be taken to balance the static pressure with the input airflow to avoid collapsing the containment or ductwork due to high negative pressure. Note 2: The table occasionally identifies two options for a given component. For example, containment materials (5.3.1) are shown as being either rigid or flexible. If the specifier requires the use of rigid materials only, this restriction must be specified separately. Note 3: Class 4W will capture dislodged paint chips and debris, but will not contain the water used for cleaning. * When vacuum shrouded waterjetting is employed, ground covers or free-hanging tarpaulins may provide controls equivalent to Class 1W.

Management of Wastes Generated What are the characteristics of the Coating (brittle, soft, loose, thick or thin, layers) Constituents of Coating (lead, no-Lead, other metals, asbestos, etc. ) Service Environment (urban, watershed, public use, industrial use, etc.) Waste stream characteristics (liquid, slurry, sludge, solids)

Total and Dissolved Heavy Metals Separating Lead in Wash Water by Physical Means Example- All Lead 100 grams in Wash Water100% 80 grams in Screened Wash Water 80% 18 grams in Filtered (5µ) Wash Water 18% 0.24 grams are dissolved metal 0.24% Dissolved Metals, 0.45µ filter

Full Containment and Collection Designed to keep water from storm drains and running off site- portable containment pools or pits Manufactured wastewater collection systems- pits to close-loop self contained units Wet/dry vacuums, sump pumps, diaphragm pumps

Collection and Handling Options No collection required, separation of solids from the liquid by screen or geo-textile. Retention requirement for solids. Collection required, separation of large solids, filter to remove small solids. Test and open discharge. Collection required, separation of large solids, filter to remove small solids. Test and controlled discharge.

NON-LEAD BASED PAINT REMOVAL PROJECTS (Example) Water washing of the bridge for the purpose of removing chalk, dirt, grease, oil, bird nests, and other surface debris can be performed without additional containment provided paint chips and removed debris are removed and collected prior to washing or are cleaned from the site after cleaning is completed each day. At the Contractor’s option, SSPC Class 4W permeable containment materials described above under “Water Jetting or Wet Abrasive Blast Cleaning for the Removal of Paint” can be used to collect the debris while the washing is underway.

LEAD BASED PAINT REMOVAL PROJECTS (Example) Water washing of the bridge for the purpose of removing chalk, dirt, grease, oil, bird nests, and other surface debris, and water jetting or wet abrasive blast cleaning for the purpose of removing paint and surface debris shall be conducted within a containment designed, installed, and maintained in order to capture and contain all water and waste materials. (SSPC Class 2W-3W) When water is used for surface cleaning, the collected water shall be filtered to separate the particulate from the water. Recycling of the water is preferred in order to reduce the volume of waste that is generated. The water after filtration shall be collected and disposed of according to the waste handling portions of this specification. When a slurry is created by injecting water into the abrasive blast stream, the slurry need not be filtered to separate water from the particulate.

LEAD PAINT REMOVAL PROJECTS (Example) Waste water generated from bridge washing, hygiene purposes, and cleaning of equipment shall be filtered on site to remove particulate and disposed of at a Publicly Owned Treatment Works (POTW) according to State regulations. The Contractor shall provide the Engineer with a letter from the POTW indicating that they will accept the waste water. If the POTW allows the filtered water to be placed into the sanitary sewer system, the Contractor shall provide a letter from the POTW indicating that based on the test results of the water, disposal in the sanitary sewer is acceptable to them. Water shall not be disposed of until the above letter(s) are provided to, and accepted by, the Engineer.

Recycling Water Minimize water consumption Minimize waste quantities Cleaning Recycled Water

Waste Streams Waterjetting Waste Water Hygiene Water Screened solids Filtered Solids, Filters

Hand Wash Station- Hygiene Water

Inline Water Filters Sequentially Smaller Filter Sizes

Water Storage Following Filtration

“Gray” Water Storage

Waste Water Disposal Most Common Practices Permission to discharge to a POTW sanitary sewer line- Discharge limits (0.4 to 1.0 mg/L) Permission to truck water to the POTW Obtain Permit to discharge to stream, creek, etc.- not likely to be feasible- Client’s permit does not necessarily cover contractors waste stream

Waste Water Disposal Some Uncommon Practices Fixed Facility Operations Natural Evaporation of Waste Water (CAP) On-site Treatment and discharge (Treatment Plant) Drying, Sludge Cake

Disposal of Waterjetting Waste Solids Solid Waste- Sample, Test and Classify Hazardous Waste Non- Hazardous Waste Special, Industrial, Restricted Wastes (State regulations)

Containment and Disposal of Waste Water in HP and UHPWJ Operations THANK YOU QUESTIONS?