© ABB Group April 29, 2015 | Slide 1 Overhauling kit for ED Breaker.

Slides:



Advertisements
Similar presentations
Seminar on Circuit Breaker
Advertisements

Your Intelligent Robotics Partner Adept Service & Support Design Us In CD 2007 Design Us In CD 2007.
Meets DOT 106 & SAE J1402 Meets DOT 106 & SAE J1402 Both Ends Swivel After Installation Both Ends Swivel After Installation Factory or Field Assembly Factory.
Handle Hinge Lane Dowel Stand Pack 1421s Pinewood Derby Start Gate Slide 1 of 5 Basic Start Gate.
Inspection & Preventive maintenance of breakers
MY1C Series Rodless Cylinder
Here is the broken line. Step 5: Break loose encasing seal. With bar in vice as show, hit with hammer to break loose. Usually 2 or 3 hits will break loose.
Hydraulic Cylinders Actuators
The Swagelok® SK series and AFS Multipurpose Ball Valves
© Copyright year ABB. All rights reserved /1/2015 VBF OUTDOOR VACUUM CIRCUIT BREAKER 36kV PRODUCT INFORMATION.
1 GE Digital Energy Instrument Transformers, Inc. Test Switches & Plugs Type FT Type RT Type PK-2.
GCB Service Earthing Switch Retrofit Kit for HGC-3 & HEC 3..6 ABB High Current Systems Services © ABB Group April 15, 2017 | Slide 1.
© ABB Group May 15, 2015 | Slide 1 The MotorAdvantage – how to save UK industry Steve Ruddell, Division Manager, Discrete Automation and Motion, ABB Ltd.
ADB 1560 Air Disc Brake This training session will review common problems in the field and general maintenance procedures.
Slide 1 of 58  Worked Examples Follow:. Slide 2 of 58.
Introduction Dr. Farid Farahmand CET 323. Introduction Electricity is everywhere! But what is it? –Movement of electrons through a conductor metal –Electrons.
SF6 load-break switch-disconnector
Installation. Indoor Unit Installation Typical Installation.
Kombis 8003 Index block Overview Principle Function
Turbo mousetrap cart: Need for cheese!
Asahi/America Type 21 Ball Valves Type 21 Ball Valves.
FABRICATION OF SPRING WINDING MACHINE
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guide for Methods of Measurement.
Submitted by Waris jamal Praveen kumar gautam Shiv pratap singh Ramashwar kumar singh Under the guidence of Prof.safiulla khan.
OIL & GAS FIELD SUPPLIES DIVISION Oil & Gas Field Supplies Division deals in supply of Gate Valves, Ball Valves, Butterfly Valves, Control Valves, Check.
1 Lecture 3.9: RFP, SOW and CDRL (SEF Ch 19) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Installation. Indoor Unit Installation Typical Installation.
Vacuum system.
Replacement of BLK152 to BLK 222 Drive for LTB 145 D1/B Breaker
Medium Voltage Outdoor Apparatus Portfolio
Photovoltaic By: Matheiu Alexandre Aaron Burrell Sam Didinsky Michael Mauri.
JCC Handbook Agile Contracting Support…Anytime…Anywhere Standardized Contingency Contracting Training Module Current a/o 10 Dec 08 Standardization is the.
Divide Paper into 4 Columns Labels: Conductors, Insulators, Semiconductors, Superconductors.
2015 RESAP Onsite Observations Using… “Site Audit Pro” Cal Williams…Retired Manager of Vegetation and Safety, Corn Belt Energy Corporation.
INDUSTRIAL TRAINING AT
Jyh-Tzong Hwang Section Chief Department of Nuclear Regulation Atomic Energy Council Follow Up Measures for Maanshan Unit 1 Station Blackout Incident.
Hydraulic System Components
ABSTRACT Now a days generating the required electrical energy for the street light from non-conventional source i.e.,speed breaker is the latest trend.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
PARTS.CAT.COM CLIENT TRAINING SIS – With 1.4m parts FOL – Frequent Order Lists Core Tracking Part Lookup Quick Order Quoting Setting Defaults Need.
Area Covered. Work Done Quantity Financial Progress of work.
GENERAL CAUTION TOOLS REQUIRED ASSEMBLY AND INSTALLATION
PROTECTION AGAINST INDIRECT CONTACT
Power | Case Study The Client
Molecular Beam Epitaxy Shutter System
Landing gear systems.
Actuators and output devices
What’s in Front of Your Electrical Panels
PRESENTATION ON SUMMER TRAINING PROGRAM
Fans & Heaters technical seminar
Focused on your needs. Welcome to Staples Business Advantage!
PPHV Services Sales & Marketing Amber Fort, Jaipur
Quick Reference Parts Guide Introduction
Lot No - WL1 - SCRAP RADIATOR
SF6 Live tank circuit breakers
SF6 Live tank circuit breakers
SF6 Live tank circuit breakers
FSA Drive of EDF Breaker
Review of semiconductor physics
Informal document GRE-79-04
Screw-in cartridge adapter kit
Story Contracting – Our 5S Journey
4D-100, 4D-600 2½”- 10”.
Development of Export Import Price Indices
719 ½”-2”.
Pole of EDF Breaker © ABB Group May 2, 2019 | Slide 1.
SMALL BUSINESS SUBCONTRACTING PLANS
Informal document GRE-79-xx
Fluid Power System Maintenance and Troubleshooting
Presentation transcript:

© ABB Group April 29, 2015 | Slide 1 Overhauling kit for ED Breaker

Overhauling kit for ED Breaker Customer Benefit  ABB Recommended Overhauling of ED breakers as per Document no 1HDU01002-YN of maintenance practice of product mannual.  Typically Overhauling of pole & drive takes 16 Hours & can be done on site.  Overhauling of pole & drive increases the service life & reduces cost of unwanted breakdown. © ABB Group April 29, 2015 | Slide 2

© ABB Group April 29, 2015 | Slide 3 Overhauling kit for ED Breaker Overhauling kit for pole Sl NoDescriptionDrg.NoQty Per Breaker 1Double ring1HSB Double ring1HYB O ring dia19.2x31HML400063P25i3 4O-ring1HML400063P28i3 5Seal ring for gas valve1HYN400591P1i6 6O-ring for gas valve1HML400063P40i12 7O-ring11.3x2.41HML400063P16i6 8O-ring1HML400063P20i6 9Cover complete1HML400408R16 10Desiccant1HYN400562P16 11LOCTITE 242 (1 bottle of 10 ml)HAGT P51 12Fomblin grease(1 tube of 100 gram)1HYN600023P11 13Fluortek Grease TP-55(50 GM)1HYN600024P13 14MOBIL 28 GREASE (1 tube of 75 gram)1HYN700012P101 Overhauling kit for 3 POLE COLUMN FOR ONE BREAKER(CODE:PTHV-EDEX01-R3)  O/H Kit for Pole column consist of following items

© ABB Group April 29, 2015 | Slide 4 Overhauling kit for ED Breaker Overhauling kit for Drive SI NoDescriptionDrg NoQty Per Breaker 1O' RINGSWT P42 2DAMPER - SHOCK ABSORBER (FOR 3 POLE BREAKER)EXIN R11 3COUPLING PINHATH P21 4S.S. HEX SCREW M6 X 129ARA BELLEVELLE WASHER M6AG P31 6WASHERSWT P11 7SPRING(FOR CLOSING BLOCK & INDICATING LEVEREXIN P12 8SPRING (FOR TRIP BLOCK)EXIN P12 9SPRING (FOR TRIPPING LATCH)1HYN400148P11 10SPRING (FOR TRIPPING LATCH BLOCK)1HYN400149P11 11RUBBER BELLOW (FOR EYE BOLT)1HYN400086P11 12MOBILE 28 GREASE1HYN700012P103 Overhauling kit for spring stored energy actuator (CODE:PTHV-EDEX03-R1)  O/H Kit for Drive consist of following items

© ABB Group April 29, 2015 | Slide 5 Overhauling kit for ED Breaker Scope of offer.  Supply of Complete Overhauling kit  Overhauling field Breakers(option of doing form PSC or LSC )

© ABB Group April 29, 2015 | Slide 6 Overhauling kit for ED Breaker Reference List of drive despatch from 2010 CustomerPO No & DateOrderSupply PeriodABB Reference Quantity BROWN ELECTRICAL ENTERPRISESBEE/EB/PO178/ /13/ S.S.EnterprisesSSE/WBSETCL/ABB/10-11/001812/11/ ELECTRO SERVICESES/ABB/PTHV/10-11/01012/25/ ELECTRO SERVICESES/PO/PTHV/ /1214/27/ SWATI SALESSS/23/DEV&YA/ /15/ Torrent Power Ltd,ES/PO/ABB/PTHV/10-12/02105/27/ S.S.Enterprisessse/wbsetcl/abb-oRD/11-12/000517/18/ NDPL,Central Procurment Plant Hv48/17/ Shashank Enterprises /9/ SelmoreSM/Stock/ABB-248/252/253/03310/19/ TamilNadu Gen.& Distru.Corpn.TANGEDCO.SE/PEDC/N-IMS-04/ /24/ M/s. S S Enterprises,SSE/WBSETCL/ABB-ORD/11-12/ /22/ Spectrum ConsultantsPO/ /20/ ELECTRO SERVICESES/ABB/PTHV/11-12/06111/19/ ELECTRO SERVICESES/ABB/PTHV/11-12/0721/20/ Spectrum Consultants /20/ ELECTRO SERVICES /11251/27/ ELECTRO SERVICESS04/ /24/ Eastern Trade & AgenciesETA/PGCIL/332/ /7/ TRIDENT LIMITED /10/ Shashank Enterprises /15/ The Manager (T)IIMPL/EPPHV-S/BB/ /20/ STEEL AUTHORITY OF INDIA LIMITEDPU-H07/ 0044/0134/17/ SelmoreSM/ABB-0831/27/  Continue……….

Overhauling kit for ED Breaker Reference List of drive despatch from 2010 CustomerPO No & DateOrderSupply PeriodABB Reference Quantity SelmoreSM/ABB-0831/27/ S.S.EnterprisesSSE/WBSETCL/ABB-ORD/001615/19/ HVPNL12913/12/ Eastern Trade & AgenciesETA/PGCIL/362/ /20/ United Phosphorus Ltd,ES/ABB/09-10/07.12/13/ SEMI-CONDUCTOR LABORATORY /23/ ELECTRO SERVICESES/ABB/PTHV/09-10/0811/13/ M K ENGINEERSMKE/09-10/ABB/69434/16/ Godown Delivery,AllahabadREC/09-10/157710/7/ M K ENGINEERSMKE/09-10/ABB/817105/20/ SelmoreSM/ABB-1368/19/ SWATI SALESSS/130/KPTCL-M/9-1014/21/ Shashank Enterprises /22/ DE CONTROLSDEC/K/PO/PT /26/ SelmoreSM/Stock/ABB-199/200/202/204/205/14210/25/ ELECTRO SERVICESES/ABB/PTHV/10-11/00319/25/ SWATI SALESSS/13-B/KPTCL/ /16/ ELECTRO SERVICESES?ABB/PTHV/10-11/004110/27/ Shashank Enterprises /20/ SelmoreSM/Stock/ABB-17110/25/ Total101 © ABB Group April 29, 2015 | Slide 7  And many more……….

© ABB Group April 29, 2015 | Slide 8