H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE.

Slides:



Advertisements
Similar presentations
Nucorhighway.com Nucor Steel Marion, Inc. What makes us special? Simple System Line Posts Cable Hook Bolts Turnbuckles End treatment.
Advertisements

3M Plastic Repair System – Back Side/Front Side Repair.
Artificial Teeth Arrangement and Denture Base Waxup
Instructions for making plunger fork tool. Drawing for the trigger assembly.
James Rasmussen.  Original dash was made from sheet metal, foam, and vinyl  Was too heavy for its purpose  Didn’t offer standard gauge sizes  Didn’t.
K&W Permanent Metallic ® Block Seal
Civil Engineering Specifications for the Water Industry
Permanent Head Gasket & Block Repair w/Nanotechnology, 32 Fl Oz
Changing the Oil in a 2006 Mitsubishi Eclipse. Introduction Changing the oil in your 2006 Mitsubishi Eclipse is easier than you may think. With a few.
Lesson Working with Copper Tubing. Interest Approach n Why is copper tubing only used for water and fuel lines?
Car Manufacture How organizations use ICT. Objectives Have an understanding of how organizations use ICT. Be able to describe a number of uses, giving.
How to install the Insert Alpha Q Tutorial Bert Hull Feb 8, 2005.
1 UBC International Training Fund Presents. Tensioning.
Cutting Machines Foldable Information. DRILL PRESS Related Terms  Center punch  Cutting Oil.
Release 01/10/051 DUCOSUN F WITH FIXED COVERPLATES ASSEMBLY INSTRUCTIONS.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
SYNTHETIC RED OXIDE METAL PRIMER It has good anti-corrosive properties. It contains Zinc-chrome. Recommended for agricultural, steel structures & other.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
New Mexico FFA Agricultural Mechanics Career Development Event Engine Power.
1B-1 Fire Engine Maintenance Unit 1B – Pump Inspections and Maintenance.
Environmentally Conscious Design & Manufacturing (ME592) Date: April 24, 2000 Slide:1 Environmentally Conscious Design & Manufacturing Class 20: Remanufacturing.
External nut type series 43
New Mexico FFA Agricultural Mechanics Career Development Event Plumbing.
Step 1 Park vehicle on a level surface then engage the parking brake and turn off engine. If you cannot comfortably get under the car, raise the front.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Small Engine Reassembly Briggs & Stratton OHV
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
Joining Metals.
PROSTHETIC PROCEDURE MANUAL BR SYSTEM. CEMENTED RESTORATION Impression Copings Set Screw Pick-up Transfer Implant Analog Cemented Abutment Angled Abutment.
Release 01/10/051 ASSEMBLY INSTRUCTIONS DUCOSUN F MULTIFIT.
New Mexico FFA Agricultural Mechanics Career Development Event Engine Power.
1 Basic Hand tools Basic Tools. 2 3 Objectives Upon completion of this class and activities, you will be able to: –Recognize basic hand tools. –Identify.
Planning Manufacture TaskEquipmentQC/QA Mark out the shape of the speaker front and back Tri square, pencil, ruler, tape measure.
BondChem TECHNICAL DATA Roll-a-crete ( Three Component Cementitious Waterproof Coating ) Page 1 / 2. DESCRIPTION BondChem’s Roll-a-crete is a three component.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
Stycast Insertion Part 3 and preliminary glue picture on samples
Getting Ready Gather tools, oil and filter. If you plan to change your oil regularly, consider investing in jack stands, a socket set and an oil drain.
1 A/C Pressure Test and Evacuation. 2 Leak Detection Leak detection must be done after every repair job. It must also be done anytime the appliance can.
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
Biodiesel Test-Batch Mini-Processor For One or Two Liters.
Student– UNSW Mining Engineering
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
Holding Down and Chocking The engine must be securely fixed to the ship. For this the engine is mounted on resin or cast iron chocks and bolted to the.
Principles of Manufacturing Copyright © Texas Education Agency, All rights reserved 1.
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 13 Fastening Metal.
Cold Metalworking Processes TSM 233 Unit 10. TSM 233 Metallurgy and Welding Processes Cold Metalworking Those metalworking processes where the base metals.
Ziplock Container and 2L Bottle System. Bill of Materials –3 screw top Ziplock Containers –3 empty 2L soda bottles –Aquarium tubing –Aquarium pump –4.
© Goodheart-Willcox Co., Inc.. Compressed Air  Air compressor provides compressed air  Turns on and off automatically to maintain a preset pressure.

AfterSalesTraining Welcome to AfterSalesTraining.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
A SEMINAR PRESENTATION ON EICHER ENGINE
Description of Hand Tools Tools help us do work and make things. Tools.
Paint bottom first. Two coats of paint Paint the top last.
36 GASKETS AND SEALANTS GASKETS AND SEALANTS.
Warm Vessel Leveling Islands (Piers)
Processing Of The Denture (Flasking)
Wood Glue & Preserving and Finishing Products
Tool Assembly Procedure
Rapid Tooling.
Far Detector Activities Late 2017 – Early 2018
Joining Metals.
Zinc Powder for Coating - Protective Primer on Metal Surfaces Zinc Powder For Coating.
Running moulding on a bench
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
Joining Metals.
Servo Pilot SFP-150 to 1500.
Presentation transcript:

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE.

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE. TheProcedure

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE. Alignment of Engine The chocks may compress times the chock height when the holding down bolts are tightened. èper 10 mm of chock height align the engine 0.01 mm higher...but maximum 0.05 mm èAlign close to the top of the allowed coupling tolerance èObtain satisfactory alignment and crankshaft deflections èCheck deflections after the job is finished when temperatures have returned to ambient

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE. Preparing of chocking area èFinish all welding on the foundation èAll bolt holes should be drilled èFit the reamer bolts inside before pouring èCheck ship trim

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE. Check all materials and tools are available EPOCAST 36 resin and hardener Foam Rubber StripsRubber TubeSealing Compound (Mastic) Non-Melt Grease F36 Release Agent Spray FT36 ScissorsMixing Tool with Mixing Blade HeaterDigital Temperature Gauge Barcol Hardeness Tester

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE. Cleaning of chocking area èClean the foundation from rust, oil, grease, mill scale, paint NOTE: Epoxy Primer (20-25 µm) is allowed èFor deck machinery a thin coat of inorganic zinc or similar is acceptable

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE. Damming procedure (Part I) èInsert the flexible damming between bedplate and topplate

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE.

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE.

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE.

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE. Damming procedure (Part I) èInsert the rubber tube into the bolt hole

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE.

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE. Damming procedure (Part I) èSpray release agent slightly into the mould

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE.

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE. Damming procedure (Part II) èTack weld front metal dam in place

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE.

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE. Damming procedure (Part II) èSeal the front metal dam with sealing compound

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE.

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE. Damming procedure (Part II) èComplete the foam damming on both ends of the metal dam

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE.

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE. Damming procedure (Part II) èSpray release agent to the inside of the front metal dam

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE.

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE. Mixing procedure èAdd hardener according to mixing and pouring guide into the resin can èPlace the switched-off mixing tool inside the resin can

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE.

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE. Mixing procedure èMix the resin/hardener between rpm for 2-3 minutes èSwitch off the mixing tool and take out of the resin can

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE.

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE. Pouring procedure èEnsure that all damming is complete èPour the resin shortly after mixing into the lower end of each chock èHeight of overpour for static pressure should be min. 20 mm min. 20 mm min. 20 mm

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE.

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE.

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE. Test piece èPreparing of test piece for each batch number Spray release agent Metal front damming 2. Pour EPOCAST Sealing mastic

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE. After pouring Curing time: è< 13 °C :no cure è14-17 °C:approx. 48 hours è18-20 °C:approx. 36 hours è> 20 °C :approx. 24 hours

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE.

H.A. SPRINGER marine + industrie service RESEARCH MAKES THE DIFFERENCE. Barcol hardeness test èRemove the heaters èRemove the front metal dam and rubber tube èCheck the barcol hardeness on the side of each chock NOTE:min. 40 Barcol èRemove the wedges or back-off the jacking screws Insert the foundation bolts and tight them according to the approved documents