Estimating Dozer Operating Costs ©2005 Dr. B. C. Paul.

Slides:



Advertisements
Similar presentations
 Without reference, identify principles relating to Fixed Radiological X-RAY PM with at least 70 percent accuracy.
Advertisements

Loading and Hauling.
County Road Administration Board Presenters: Mike Hasslbauer Technology Solutions Manager Western States Equipment Company
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 2 Fundamental Concepts of Equipment Economics.
Split steering gaiter (nearside) this is an MoT failure.
Front End Loader Costs ©Dr. B. C. Paul 2000 Start Detailed Economic Comparison of 3 machines l Strategy Go Through Each Machine and Figure the Cost Compare.
Handling Solution in a Heap Leach ©2009 Dr. B. C. Paul.
10-KEY Adding Machines Cash Registers Computer Number Pad.
Matching An Excavator to Our Trucks ©2009 Dr. B. C. Paul Note – These Slides contain tables and information found in the Caterpillar Performance Handbook.
SOIL … It’s more than just dirt!
Erosion Bust a move!.
Factored Cost Estimates (With Inflation Indexing) ©2002 Dr. Bradley C Paul.
Chapter 3 Lesson 3 Essential Question: What is soil made up of? TYPES OF SOIL & PARTICLES.
Tire Safety. Running to Destruction Its not a safe practice –Potential for loss of control –Potential for debris to injure personnel if tire ruptures.
Truck Fleet Costs ©Dr. B. C. Paul 2000 Revised 2008, 2009 Note – This presentation includes screen shots from the Caterpillar Performance Handbook, Catapillar’s.
Bicycle Mechanics and Repair Decal Mechanical Engineering 98/198 Spring 14 Lecture 2.
Tire Heating – The TMPH Rating ©Dr. B. C. Paul 2000 revised 2008 Note- These slides demonstrate the use of the FPC computer program developed by the Caterpillar.
Education for Sustainability Flemington School 2007 Our Visit to the Omaranui Landfill, AllBrites and PanPac.
Chapter 10 Pricing Equipment. Renting Equipment There can be advantages to renting rather than owning construction equipment; including: –The builder.
Adjusting a Mine Cost Service Model. A Note About MSOPIT Compatibility Mine Cost Service Expressed Mining Costs as Costs Per tonne of Ore Mined MSOPIT.
How To Replace Your Fuel Filter On a 1998 Mustang GT.
My Fault Line At Work Setefano A. Malieitulua. Water and Fault Line This is a 10” water pipe mainline break on 9400 S 1300 E. In this video at :14 seconds,
Lecture 6 Loading and Hauling
Checking for Tire Heating ©2009 Dr B C Paul Note – These slides contain material from slides dating back to 2000 and also contains screen shots from the.
Step 5 Truck Fleet Costs ©Dr. B. C. Paul 2000 Revised 2008 Note – This presentation includes screen shots from the Caterpillar Performance Handbook, Catapillar’s.
January 18, 2013Q-2 Pg. Daily Goal: We will be able to articulate the difference between erosion and deposition. We will demonstrate how geographical features.
Basic Tool Safety and Equipment
Entering My Haul Road Profile ©2009 Dr. B. C. Paul Note- This presentation draws on previous notes developed as early as 2000 and contains numerous screen.
7-8 SCHEDULED MAINTENANCE AND REPAIRS OBJECTIVES: 1. TO FIND THE COST OF SCHEDULED CAR MAINTENANCE 2. TO FIND THE COST FOR CAR REPAIRS Example 1 p 280.
 Purpose: To present DOT an overview of the costs that we incur as grading contractors.  Goal: To foster a basic understanding of these costs and relate.
Equipment Costing: What You Don’t Track Can Hurt You (The Devil is in the Details)
Lecture 2 Introduction to Earthmoving
Computerized Tillage System Calculator Help Manual Created by: Jake Walker, Aaron Weinhold, Adam Duff Agricultural Systems Management Copyright 2004 Purdue.
Maintenance & Rehabilitation Strategies Lecture 5.
Matching Shovels ©Dr. B. C. Paul 2000 revised 2008 Note – Matching procedures depicted in these slides are widely understood among those schooled in the.
RIPPING Many contractors, when investigating a project, ask the question “Do I have to blast?” That is the wrong question. What we should investigate is.
Step #1 Matching ©Dr. B. C. Paul 2000 revised 2008 Note many of the ideas expressed in these slides can be found in Surface Mining Manuals, the Book Surface.
Cable Shovel Costs ©Dr. B. C. Paul 2000 Do the Cable Shovel l Have a 12 yard P+H Examine Cable Shovel Cycle Time Chart Predicted 26 seconds.
Make a Great Map of Your Engineering Building Traverse ©Mar Dr. B. C. Paul Note – This presentation contains screen shots from the Mine Sight and.
Design of Belt Conveyors Step #3 Checking Out the Power ©2012 Dr. B. C. Paul Note – Material in these slides include screen shots from the program “Belt.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 7 Dozers.
Horticulture II - Landscape UNIT C LANDSCAPE INSTALLATION AND MAINTENANCE.
How does water underground reach the surface? Freshwater flows underground.
What is Friction? How does it work?
Entering Our Choices into FPC ©2009 Dr B C Paul Note – This slide series contains screen shots of the computer program FPC developed by Caterpillar Equipment.
Get the Ground Water Picture. Individual Questions The horizontal scale of the cross section is 1 inch = 1 mile. The vertical scale is 1 inch = 50 ft.
BY: Jeremy Violette.  In this marketing plan I will be explaining my woods products business.  My business is Lake View Harvesting, a wood operating.
Surface Water Movement SWBAT explain how surface water can move weathered materials; explain how a stream carries its load; describe how a floodplain develops.
A Heap Leach Plan. My Concept I’ll build one great big pad I’ll fill it in with rows of material about 40 feet high I’ll then fill in between the rows.
Chapter 25 Wheel Alignment. Objectives Define the term “wheel alignment” Inspect tires, steering, and suspension systems before alignment Check and adjust.
Obtaining Moving Cycle Times ©Dr. B. C. Paul 2000 revised 2008 Note – The methods shown in these slides are adapted to use FPC, a program produced by.
MIGHTY AUTOMATIC MIGHTY AUTOMATIC BELT TENSIONERS.
Soil Texture Testing Highland High School Property Ms. Norris Highland High School Earth Science 2015.
1/20/2016Minimizer Confidential1. 1/20/2016Minimizer Confidential2.
SAFETY RULES AND PROCEDURES FOR POWER TOOLS INDEPENDENCE MIDDLE SCHOOL TECHNOLOGY EDUCATION DR. HURD 2010.
Checking On Production ©2009 Dr. B. C. Paul Note – These slides contain material from slides dating back to 2000 and also contains screen shots from the.
Adding Machines Cash Registers Computer Number Pad
An opposing force that effects us everyday
Safely Climbing Up & Down on Machinery
Vehicle Maintenance.
Types of Blades used on Cutoff Saws and Tips on using Saws
Power Tool Safety Don’t operate a machine until:
Washing Machine Maintenance in Dubai | Al Nadeem
ITTS FEAT Tool Methodology Review ITTS Member States Paula Dowell, PhD
How to Use Flash Cards.
Safely Climbing Up & Down on Machinery
Lecture 5 Dozer TSP-308 MPK Ferdinand Fassa.
An opposing force that effects us everyday
Presentation transcript:

Estimating Dozer Operating Costs ©2005 Dr. B. C. Paul

Application Notes Severity of Duty –Medium duty Push loading scrapers Land clearing Pushing up soils and clays (such as trapping soil) –Heavy duty Rock ripping Working on rock surfaces Dozing Rock Push loading scrapers through rock

Cost Component Fuel D11 in heavy conditions uses gallons (see Cat Handbook 35 th ed page 20-13) –Idle time –Time in reverse –Down hill all reduce fuel consumption –Our conditions probably lower end 30 gallons per hour Cost for diesel (red dog) –$1.85/gal –30gph*$1.85 = $55.5/hour

Cost Component Tires Sucker! –This is a track dozer

Undercarriage On dozers tracks and underside are so condition dependent that they need to be calculated separately Step #1 –Look up a basic cost per hour in Cat Tables 35 ed page For my D11 basic factor is $18/hour Step #2 pick adjustment factors for impact, abrasiveness, and Z

Impact Factor High corresponds to –Impenetrable surface with 6 inch or greater bumps (such as working on shot rock) Moderate corresponds to –Partially penetrable surface with 3 inch bumps Possibly trapping rocking transition Low corresponds to –Completely penetrable surface few bumps Possibly trapping top soil My Dozer is working on rock pile High –High is 0.3 (mod is 0.2 and low is 0.1) see Cat Handbook ed 35 pg

Abrasiveness Factor High –Saturated conditions with sand or sharp rock particles (like working on shot rock) Moderate –Intermittently damp with few angular rock particles (soil work might be like this) Low –Involves dry conditions with few rock particles The dampness issue causes things to stick and work into the joints of the treads Number is H=0.4, M=0.2, L=0.1 (Cat Handbook ed 35 pg 20-28) –My dozer is working on shot rock 0.4

The Z factor About 50% of Z factor is maintenance –Range about 0 for absolute top maint –0.5 for maintain if it breaks –I’ll go 0.25 for moderate About 30% of Z factor is conditions –Abrasiveness and impact with a little gut feel for how rough –I think this is rough 0.3 About 20% on operator temperament –Race track backing, tight turns, running to side angle are bad –I’ll go middle of the road 0.1 Total up for my Z factor –0.65

Step 3 in Undercarriage Cost Add up your 3 factors –Impact 0.3 –Abrasive 0.4 –Z 0.65 –Total 1.35

Step #4 for Undercarriage Cost Multiply the Basic Cost by the total of the 3 factors $18/hr * 1.35 = $24.3 Breakdown on dollars (may be important for indexing) –70% parts, 30% labor Labor was $60/shop hour –High compared to about a $25/hr wage with 60% burden –If I consider it includes my parts warehousing, secretarial and supervision its probably reasonable I better make sure I don’t count the personnel twice Parts – Steel has gone up severely –I’m going to allow about 20% here –24.3 * 0.7 = $17.01 –$17.01 *1.2 = –Add back the labor unaltered $ $7.29 $27.70/hr for Undercarriage Cost

Repair Reserve for Machine Cat Handbook ed 29 pg –D11 is $19/hour for first 10,000 hours –But D11 has 30,000 hour life under my severe duty –Multiplier for extended life is 1.3 –$24.70/hr

Lubricants Cost D11 uses about 0.25 gallons/hr –At $9.00/gallon lube $2.25/hr 13.5 lubricant changes/2000 hrs –2 labor hour per change at $60/hr –27*60/2000 = $0.81/hr 816 grease fittings/2000 hrs –About 75 cents/fitting with labor –816*.75/2000 = $0.31/hr Hourly Filter Cost $0.62/hr 53 Filters/2000 hrs –5 minutes per filter –4.42 hours/2000 hours –At $60/hr $0.13/hr Total it up $4.12/hr

Operator Cost $25/hr with 60% burden $40/hr Assuming that machine only runs when operator is not on break (no hot seat change out for 10 minute breaks)

Total Operating Cost/hr Fuel $55.50 Undercarriage $27.7/hr Repair Reserve $24.7/hr Lubricant $4.12 Wear parts $1.25 (guessed from other examples) Labor $40/hr Total $153.27/hr