P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

Saga of the IBL Staves Franck Cadoux on behalf of the ATLAS IBL engineering team (and Eric Vigeolas in particular)
1 IBL Stave & loading tools University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber The main goal for today…  Review.
Stave -1 status and other reports Stave Loading Meeting, November 8 th 2011 G. Barbier, F. Cadoux, A. Clark, D. Ferrère, C. Husi, G. Iacobucci, A. La Rosa,
IBL Loading Activity Overview Franck, Maarten, Coralie, Didier Loading tool workshop University of Geneva, Aug 31 st 2011.
Stave loading with Si-heaters at UniGe with jigs v-1 August 2011 Maarten, Coralie, Franck, Didier.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
1 Module and stave interconnect Rev. sept. 29/08.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
IB stave assembly A. Di Mauro, C. Gargiulo, J. Van Beelen ITS-MFT mini-week
Status and outlook of the Medipix3 TSV project
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Back up stave test program status Eric VIGEOLAS Pixel week December 2000 Pre production status Assembling phase comments Geometrical control Stave Qualification.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
WP6 status report A. Di Mauro (CERN) ITS plenary meeting
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
Atsuhiko Ochi, Kobe University 16/04/2014 MM PCB WG CERN.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Marcello Lunardon - ALICE Gluing Meeting 010/03/2003 Study of glues for the assembly of the ALICE Silicon Pixel Detectors Status at The PADOVA.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
CALICE SiW EcalAboud Falou/ LAL-Orsay Detector SLAB Integration EUDET Prototype Slab cross section, thickness budget Space Frame Ladder {Step.
Microchannel cooling Alessandro Mapelli CERN PH-DT EPFL-LMIS4 Reporting on behalf of D. Bouit, J. Daguin, L. Kottelat, J. Noel, P. Petagna – CERN PH-DT.
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Valencia Report 5 Pre-qualification (2 mechanical + 3 electrical) All inside mechanical specification in XY after assembled. However, Pre3-Pre5 bad planarity.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Loading and QA activities Introduction, Workflow, Tooling, Tasks UniBe – UniGe regular IBL-Upgrade meeting D. Ferrère Aug, 11 th 2011.
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status anvil new welding configuration software for on-line seam quality control conclusion.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Stave Tooling & Plans for Future Stave-building (Tim)
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
RPC Production status for Engineering Module & Detector stack at IICHEP, Madurai Shri. S.D.Kalmani TIFR.
IBL Progress D. Ferrère for the IBL community LHCC Upgrade Session – June 14 th 2011 Detailed progress was reported at the IBL General meeting, June 8-10.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
Grid Pix Field Simulations and precision needed for a module Peter Kluit, Jan Timmermans Prepared 16 May 2016.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
T. Bowcock University of Liverpool
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Sector 002 Assembly status report
Grid Pix Field Simulations and precision needed for a module
Ladder Assembly All tools and jigs produced Glue dispensing works
Equipment for Assembly – UK Experiences
Hybrid Mechanical/Thermal Design ideas
ATLAS ITK WP3 WP3 Bi-weekly meeting
Module/Ladder Assembly
Presentation transcript:

P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary of the activities at UniGe: - Stavelet program for thermal interface investigation - Electrical insulation of module versus stave

Stavelet – Loading with glue/grease test program Purpose of the tests – glue versus grease: Selection of candidates according to past experiences, thermal performances, viscosity, … Evaluation of weight versus area Optimization of the glue/grease dispensing technique (no glue overlap between the 2 chips) Thickness uniformity and placement accuracy – XYZ metrology Robustness to thermal cycling – XYZ metrology Rework ability?  Removal and evaluation of time and risk for this operation  Inspection of neighboring module edges  Inspection of remaining surface  loading again Does the use of Parylene® coating make a change? Practical use Independent tests to the stavelet program: Radiation hardness of the glue and grease samples – Thermal performances, consistency… Glue and grease mechanical and thermal characterizations Others… 2

Gluing and grease test program on C-foams stavelets ~20 mm ~150 mm Glass pieces loaded with glue and or grease and various patterns Glass references: - Glued on the 2 sides - Height > glass thickness - Hole for XY metrology - Top surface for Z plane NB: Assembly of the 3 washers as much as possible in the same plane Glued holding bar Procurements: - Glass pieces (20x40 mm 2 )1 or 2 mm thick to be cut by a diamond tip  CERN stroe + cutting UniGe - C-foams to be coated with parylen. 1 or the 2 sides?  Samples to be cut at UniGe + Comelec (coating) – C- foam in 0.25 g/cm 3, 0.5g/cm 3 et 0.9g/cm 3 - Holding bars made of aluminum or plastic to be butt joined to the C-foam  UniGe - Mechanical washers to be made & glued  UniGe - Glue and grease candidates  To be discussed with Marseille and IBL stave WG - Jigs to handle and load the glass pieces on this stavelet  To be made by UniGe with the corresponding threads for the holding bars and placement accuracy - Tungsten wires for the rework with glue 3

Assembly jig allowing to glue the aluminum ends, but also the dummy glass modules Features to reference the dummy glass modules Area to glue gleass fiducial marks Stavelet Jig Designs 4

Stavelet Jigs Stavelet assembly jig Stavelet jigs for metrology, thermal cycling, storage Features for dummy module assembly references 5

Glass Pieces Under fabrication Dummy Glass Modules with Fiducial Marks Glass pieces for Jig References 6

Carbon Foam Electrical Insulation using Parylene® Coating – Investigation for IBL Stave Concerns: - Carbon foams are electrical conductive materials - IBL module require an electrical insulation for the FEI4 backplane but as well as for the detector HV - Depending of the detector technology the potential at a distance of 300µm from the foam can be as high as 1000V. - Bare foams can easily release carbon dust that could cumulate and be oriented into the electric field and therefore reduce the insulating distance ® Proposal is to use of a thin coating like Parylene® allowing: - To prevent electrical problems and limiting the thermal resistance - To contain and avoid releasing carbon dusts 7

Pictures of the Foams under a Microscope Carbon Foam 0.25g/cm3 – No Parylene POCOFoam 0.55g/cm3 – No Parylene POCOFoam 0.55g/cm3 – 5 µm Parylene POCOFoam 0.55g/cm3 – 20 µm Parylene NB: No coating was made for carbon foam 0.25 (No sample available) Magnification x µm 8

Set-up – 1 st Testing Step - Cupper foils were directly in contact with the foam samples - 3 samples tested for the resistivity (non coated, 5µm and 20µm) - 2 samples tested for HV insulation (5µm and 20µm) HV HV GND Foam sample insulator Clamp ® Tested samples: POCOFoam ® Test setup: Coated foam samples clamped between 2 cupper foils and connected to the 2 HV polarities Pressure to the coated surface: Unknown but not null 9

® Parylene® CoatingInsulation to contactBreakdown Voltages [V] No 0 5 µmYes550 (over 10 microns) 20 µmYes1100 (over 40 microns) Comments: The coated (5-20 microns) foams does not release any visible carbon dust. Set-up pictures and Results 10

Pictures after Electrical Breakdown NB: Breakdown possibly occurred where the clamps were applying the highest pressure 11

Second Testing Step with Shims Electrical insulation in a new test conditions: - With 400µm gap between the cupper and the foam - Various samples: non-coated, 5µm and 20µm HV HV GND Foam sampleInsulating shims (~400µm) Plastic stiffener Clamp 12

Set-up Pictures and Results with Shims ® Parylene® CoatingBreakdown Voltages [V]Equivalent insulation for 300µm air + coating No1100 (over 800µm air) 400 V 5 µm2400 (over 10 µm microns air) 1050 V 20 µm3300V (over 40 µm microns air) 1500 V NB: - Safety factor should be applied to the limit to get guaranty on long term QA ® - Considering a safety factor, the current design is acceptable with µm Parylene® 13

Pictures – Copper after Electrical Breakdown 5 µm Parylene 20 µm Parylene 14

Si-detector backplane Edge chipping and Si-debris often seen pointing in all directions Additional Comment Observed during SCT production and QA Stave coating is clearly an advantage in such a case even for backplane/edge voltage like 100V 15

Summary Stavelet Program - Goal is to test various thermal interfaces to evaluate the practicality for loading, the thermal stability, the weight, the rework-ability - Thermal evaluation of a selected grease interface will be done with dedicated thermal set-up - Time scale: ~3 months Module to stave electrical insulation - Parylene® coating have been made on POCOFoam samples: 5, 10 and 20 microns - Coating almost invisible under the microscope - No carbon dust release when touching the samples with the fingers - In IBL condition with ~300µm gap from the sensor edge to the stave it will be risky to operate it without an insulating coating. - The preliminary recommendations from this test is to coat the stave with 10 to 20µm Parylene®. - Remaining question: Is this 10 to 20µm enough when considering the aging, and the radiations Stave loading concept - Close connection between CPPM and UniGe - Common concept with a cradle and a manipulator - Progress to be made with a nominal stave design 16