Presented by Lynley Doyen, Water Program Liaison Field Operations Support Division Water Quality Advisory Work Group January 25, 2011 Austin, Texas.

Slides:



Advertisements
Similar presentations
WDEQ Sanitary Sewer Overflow Reporting Kevin M. Wells Natural Resource Program Manager WDEQ/WQD Herschler Building, 4 West 122 West 25 th Street Cheyenne,
Advertisements

CMOM CMOM Capacity, Management, Operation & Maintenance and Remote Wireless Monitoring of Collection Systems 5 th Annual FVOA Mini Conference August 18,
Bergen County Utilities Authority Bergen County Utilities Authority Little Ferry, New Jersey Rain Derived Infiltration/Inflow Reduction and Sanitary Sewer.
Steve White Urban Water Council US Conference of Mayors
Environmental Compliance FOG Program Basics & South San Francisco/San Bruno Program Presented for: Be Sewer Smart Summit 2012 Presented by: Rob Lecel Sr.
INFORMATION on RATE increase On May 6, 2008, the Clark County Water Reclamation District Board of Trustees approved a rate increase at a public hearing.
CMOM: Where are we since 2005? Ann McCready-Gliha Cuyahoga County Sanitary Engineering SPUG February 16, 2011.
Harris County Pollution Control Services Department Enforcement of Bacteria Requirements in Wastewater.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
1 Collection System And Wastewater Treatment Plant Sewer Update
Presented by: Agustin Socarras, P.E. Chief, W & WW – Conveyance Section Department of Environmental Resources Management DERM July 31, 2002 Pollution Prevention.
Storm Water Mitigation Program March 17, Purpose of the Program Connections to the public sewer system within private residences or on private property.
25th Annual U.S. EPA Region VI Pretreatment Association Workshop Liquid Waste Transporter Enforcement Stories August 5, 2009 Ms. Erin La Rue Pretreatment.
Fox Valley OperatorsAssociationCMOM Capacity Management Capacity ManagementOperationMaintenance January 2011 C apacity M anagement O peration & M aintenance.
FISCAL YEAR BUDGET MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
Collection System Regulatory Initiatives in California SCAP Collection System Committee August 26, 2009 Presented by: Eric Wessels, P.E.
Regulatory / WDR Update What’s Going On?. Waste Discharge Requirements Adapted by the State Water Resources Control Board on May 2, 2006 Adapted by the.
IHTAS Phase II Project status report- Kilifi 27 th May, 2014.
1 Statewide General Waste Discharge Requirements for Sanitary Sewer Systems BACWA.
Waste Discharge Requirements (WDR) Orange County Sanitation District WDR Awareness Training Revision September 30, 2005.
Surviving a TCEQ Authorized Agent Compliance Review
Printed by DEVELOPING A NON-PUBLIC WATER SUPPLY PROGRAM FOR THE STATE OF GEORGIA Scott A. Uhlich, MCP Georgia Department of Human.
1 Innovative Use of Administrative Order Authority Management, Operation and Maintenance (MOM) Program.
An Application in GIS for a Sanitary Sewer Overflow Emergency Response Program Mike Pritchard Penn State MGIS Capstone Project Advisor: Jan Oliver Wallgrun.
MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 FISCAL YEAR BUDGET Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
ANNUAL REPORT Monitoring Reports 2010 Monitoring Reports 2010  Every month SSD is required to send a monitoring data report to the State Water.
October Module 2: Regulations U.S. Environmental Protection Agency (EPA): Established accredited training and certification programs for workers,
SSES and GIS, A Great Partnership Cindy Fort, PE Technical Director Environmental Engineering and Jeff McCann GIS Coordinator.
Special Order by Consent Wastewater Collection Improvement Projects Mark Fisher and Dennis Asbury Final Report to City of Eden October 20, 2009.
Enforcement Overview Melissa Cordell, P.G. Enforcement Division Office of Compliance and Enforcement Texas Commission on Environmental Quality Environmental.
“Proactive Public Protection: A Risk Based Approach” Derek J. Jakovich, J.D., M.B.A., M.H.A., Manager, Patient Quality Care Unit, Texas Department of State.
OSHA Alliance Program. 2 n Facilitates voluntary collaboration with OSHA to address such things as: F Elimination or control of a particularly serious.
How to prepare for an Authorized Agent Compliance Review Ronald Hebert Water Section Manager Region 10/ Beaumont (409)
Sustaining Long Term Regional Coordinated Monitoring Programs Todd Running, H-GAC May 9, 2006.
Dominique Poulin Environmental Health First Nations and Inuit Health Branch Health Canada Health Canada’s Implementation of the Drinking Water Safety Program:
Infrastructure – Condition Assessment Overview & Purpose Infrastructure Condition Assessment – General Findings/Conditions –Streets/Sidewalks/Parking Lots.
Waste Water Facilities Plan Update November 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP Public Hearing Presentation.
OSHA Update Jim Shelton Houston North Oct 2009 Houston Oct (FY10) Fatalities SIC Employees splicing de-energized downed oil field line running.
Presented by: Lloyd Gosselink Rochelle & Townsend, P.C. | 816 Congress Ave. Suite 1900 Austin, Texas Environmental Audits: An often overlooked tool.
Office of Pipeline Safety Integrity Management Inspection Process Louisiana Pipeline Safety Seminar August 2003.
The Use of Environmental Management Systems in Permitting Decisions National Environmental Partnership Summit 2006 May 10, 2006 Christine Steagall SC Department.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Facilities Plan Update July 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP.
WATER QUALITY TOPICS ENFORCEMENT – ARE FINES BECOMING A WAY OF LIFE AT THE DEQ By:Donald D. Maisch Supervising Attorney, Water Quality Division Office.
WVSD SANITARY SEWER REHABILITATION PROGRAM 2006 Sewer Smart Summit Presented by Peter V. Sevcik, P.E. West Valley Sanitation District Campbell, California.
U. S. Coast Guard ANS Program Update September 10, 2003 ANSTF Western Regional Panel Mtg Presented by LCDR Kathy Moore Chief, Environmental Standards Division.
ETHICS AND LAW FOR SCHOOL PSYCHOLOGISTS Chapter 5.
Village of Almont WATER, SEWER, AND SSO RATES 2012 – 2013 FISCAL YEAR.
ANNUAL REPORT Monitoring Reports 2011 Monitoring Reports 2011  Every month SSD is required to send a monitoring data report to the State Water.
NC AWWA-WEA 95th Annual Conference
Enforcement Overview Melissa Cordell, P.G. Enforcement Division Office of Compliance and Enforcement Texas Commission on Environmental Quality Environmental.
FY 2010 Budget Slide 1 Public Works March 18, 2009 Wastewater User Fees Wastewater Collection Proposed RCO Fee Surcharge Recommendation: Regional Consent.
Selection Criteria and Invitational Priorities School Leadership Program U.S. Department of Education 2005.
TCEQ Helps Compliance and Assistance Programs
Care Worker Violence Prevention Focused Inspections
FY 2017/18 General Budget Workshop
Oro Loma SD Collection System Compliance Evaluation Inspection
EMWD 2016 Sanitary Sewer Management Plan
Item 8A Authorize staff to establish a new standard operating procedure (SOP) with the authority to waive the sewer tap fee for an incentive period of.
Planning Commission September 9, 2013
Completion Report Summary
TSAG Overview Mission Vision Core Values Operating Principles.
Annual Enforcement Report Overview
Regional Solid Waste Grants Program
THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217)
THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217)
Kasy Stinson Water Supply Division
TCEQ Sanitary Sewer Overflows & Initiative Program
Presentation transcript:

Presented by Lynley Doyen, Water Program Liaison Field Operations Support Division Water Quality Advisory Work Group January 25, 2011 Austin, Texas

What Is the SSO Initiative? Proactive approach initiated in late 2004 to: address an increase in SSOs due to aging systems; and encourage corrective action before human health, safety or the environment are impacted Participation is voluntary

What are the Benefits of Participating? Protection from TCEQ enforcement action for most continuing SSOs Compliance history rating is not affected No penalties associated with the SSO Agreement Corrective actions based on timeline to fit Participant’s needs

How Does it Work? Step 1 – Identification of facilities Step 2 – Meet with the regional office Step 3 – Confirmation of participation Step 4 – Evaluation of the SSO plan Step 5 – Finalizing the agreement

What Do I Have to Do? Conduct an evaluation of the collection system Develop a corrective action plan to address the SSOs Provide yearly progress reports to TCEQ

Elements of the SSO Plan Description of the cause(s) of the SSOs Length of plan (allowed up to 10 years) Interim measures that will be taken to mitigate the effects of continuing SSOs Description of the corrective measures (must be specific and measurable)

Elements of the SSO Plan Operations & Maintenance program Time line for completing each corrective measure Description of the source(s) for funding Statement or provision for evaluating the effectiveness of the SSO plan

Where to Find More Information TCEQ GI-389 – Sanitary Sewer Overflow Initiative: Information for Prospective Participants Contact TCEQ regional office or Small Business & Environmental Assistance Division

This chart depicts the number of reported SSOs by fiscal year from September 1, 2005 through July 31, The total number of effective Agreements are also given per fiscal year. The results are: FY06 – Reported SSOs: 2,357 and Effective Agreements: 6 FY07 – Reported SSOs: 3,489 and Effective Agreements: 23 FY08 – Reported SSOs: 3,045 and Effective Agreements: 69 FY09 – Reported SSOs: 2,671 and Effective Agreements: 106 FY10 – Reported SSOs: 2,691 and Effective Agreements: 131 Reported SSOs

Collection Line Smoke Tested per Fiscal Year This chart depicts the total number of linear feet that was smoke tested per fiscal year (2006 through 2010), as reported by the SSOI participants. FY06 - 5,157 FY ,113 FY08 482,228 FY09 - 2,478,974 FY10 - 1,217,682

Collection Line Cleaned per Fiscal Year This chart depicts the total number of linear feet that was cleaned per fiscal year, as reported by the SSOI participants. FY06 – 0 FY07 – 644,536 FY ,784,640 FY ,037,848 FY ,591,985

Collection Line Repaired/Replaced per Fiscal Year This chart depicts the total number of linear feet of collection that was repaired and/or replaced per Fiscal Year. It also shows the running total since fiscal year FY06 – Fiscal year: 0; Running total: 0 FY07 – Fiscal Year: 56,287; Running total: 56,287 FY08 – Fiscal Year: 628,245; Running total: 684,532 FY09 – Fiscal Year: 195,642; Running total: 880,174 FY10 – Fiscal Year: 502,911; Running total: 1,383,085

Manholes This chart depicts the total number of manholes that have been inspected and repaired/replaced per fiscal year since FY06 – Inspected: 0; Repaired/replaced: 0 FY07 – Inspected: 1,430; Repaired/replaced: 538 FY08 – Inspected: 19,431; Repaired/replaced: 2,897 FY09 – Inspected: 14,453; Repaired/replaced: 1,770 FY10 – Inspected: 11,556; Repaired/replaced: 1,889

Lift Stations This chart depicts the total number of lift stations that were inspected and the total number of lift stations that were rehabilitated per fiscal year since FY06 – Inspected: 0; Rehabilitated: 0 FY07 – Inspected: 0; Rehabilitated: 10 FY08 – Inspected: 150; Rehabilitated: 28 FY09 – Inspected: 1,378; Rehabilitated: 77 FY10 – Inspected: 3,775; Rehabilitated: 104

Grease Trap Inspections This chart depicts the total number of grease traps that have been inspected per fiscal year, as reported by the SSOI participants. FY06 – 0 FY07 – 0 FY08 – 353 FY09 - 2,335 FY10 - 2,943

Questions?? Contact Information: Lynley Doyen Water Program Liaison Field Operations Support Division