ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.

Slides:



Advertisements
Similar presentations
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Advertisements

ZTF Mechanical Walkthrough Matthew Hoff ZTF Technical Meeting 1.
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Manual Flo-tap Installation Instructions
Service Technician Training
Honda 450 Installation Manual.
Phil MottAMS-02 GSR Phase II1 AMS-02 Vacuum Case Overview Ground Safety Review – Phase II September 8-10, 2008 Phil Mott.
1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Model 12 Intek Horizontal OHV Crankcase Disassembly and Assembly Lab #7.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
SPECTRAP - GSI progress report and status overview.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Cryo Capture Cavity II Progress Mike McGee April 13, 2005.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
SQXF Shell & Yoke Assembly Procedure
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
Pneufit push-in fittings For general purpose pneumatic applications.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
Exhaust to atmosphere G1 V1 V2 V3 LN2 Storage Vessel 150 l Dewar Cryostat Exhaust to atmosphere Nitrogen or helium gas bottle LN2 Circuit for MIT Test,
HPU FILTERS LOW PRESSURE FILTER FROM APU UNIT. CLOSE APU HYDRAULIC FLUID VALVE. FILL FILTER WITH HYDRAULIC FLUID PRIO TO INSTALLATION. LUBRICATE GASKET.
Engine Reassembly Technicians need to take their time when reassembling an engine. This is not a race! Listen for instruction when to add the next piece.
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Model 12 Intek Horizontal OHV
1 Assembly and installation of TM0 in the Lab Assembly and installation of TM0 in the Lab F. Rossi September.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
Cold Magnetic Shield Assembly Nik Templeton 25/08/2015.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
4D-200, 4D-700 2½”- 10”. Modification Overview  Production began in 2003 and was discontinued in  The 4D-700 (RPDA) uses a Type-II bypass (single.
Phil MottAMS-02 Phase II Safety Review1 Vacuum Case Mechanical Design Alpha Magnetic Spectrometer (AMS) - 02 Phase II Flight Safety Review Vacuum Case.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Ferrari Testarossa 1987 OS Giken Clutch Replacement Document Version
DECAM LN2 PUMP REMOVAL - CHECKLIST
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
ENGINE MODE CODES.
X-Spot Lamp Socket Replacement Procedure
NA62 LAV Anti1 REMOVAL & TESTS
Endcap shielding senarios:
LARP Vertical Test Facility
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
iSHELL Design Review Cryostat & Optics Bench
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Measure Hose as 14”, 12.5”, 12.25”, 9” & cut it.
4D-100, 4D-600 2½”- 10”.
Instructions: Adding refrigerant fluid to system
Cryomodule Assembly Plan
Gattini Detector Installation
Valve stem “gag” mechanism
CRYOMODULE FINAL ASSEMBLY
Automotive Engines Theory and Servicing
SC1R Cold Box PDR Assembly Sequence
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

ATD Assembly

ATD Assembly #1

Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer shell of dewar assembly #1. Best pressure rise test was 0.1mT/hr Lowest vacuum pressure recorded Boil off rate averaged 5scfh. The tank was able to hold vacuum at ambient temperature, but now has a vacuum leak.

Dewar Assembly #2 Short Stack Status: – Ln2 tank cleaned in ultra sonic cleaner after removing fill tube and burst disk. – Assembled SST fill tube assembly. – Leak checked fill tube at weld. – Epoxied the bellows to the bellows flange. – Leak checked fill tube assembly mounted to dewar shell. – Leak checked Ln2 tank. Helium leak found at the burst disk. – Leak check both burst disks. Leak detected on 1 burst disk. – Tested pipe plug at Ln2 temperatures using different sealants. – Attached working burst disk to tank. – Leak checked dewar and Ln2 tank. No leak detected at room temperatures.

Dewar Assembly Fill Tube Assembly SST Bellows Bellows Flange LN2 Tank Bellows Enclosure Flange G-10 Fill Tube Dewar Shell

Dewar Assembly Zeolite Assembly

Dewar Assembly Dewar Assembly Procedure  Mount the inner structure to the dewar shell using (16) 5mm screws.  Short Stack Assembly only:  Clean O-ring groove on dewar shell.  Install O-ring in groove.  Fasten end cap to dewar shell.

Dewar Assembly Viton 211 Oring C-clip Spacer Bellows Compression Screw Assembly

Dewar Assembly  Install a Viton -211 O-ring in the bellows enclosure flange. The O- ring should fit in the second groove of the bellows.  Install spacer on top of the O-ring.  Compress the SST fill tube assembly.125” with the ¾”-16 x 3” socket set screw. Spacer O-ring Bellows

Dewar Assembly  Clean O-ring groove and O-ring.  Apply vacuum grease on O-ring and install onto bellows.  Insert (15) 5mm socket head set screws and disc bellevilles onto tank. 5mm socket head cap screws that mount the tank to the inner structure 211 Viton O-ring

Dewar Assembly  Lower the Ln2 tank onto the inner structure.  Fasten the tank to the inner structure.  Release the ¾”-16 x 3” socket set screw. Note: The O-ring and spacer will remain inside the bellows.  Align the bellows to the 8 screw holes on the dewar shell.  Fasten the bellows to the dewar shell.

Dewar Assembly  Clean O-ring groove.  Clean Viton -281 O-ring and apply vacuum grease to the O-ring, and install O-ring.  Install and fasten the front radiation shield to the inner structure with the 5mm captive screws.  Install the blank cap radiation shield and fasten with 5mm socket head cap screws.  Install and fasten end cap to dewar shell.  Install fill tube flange.

Dewar Assembly  Install KF-40 and KF25 Bulkhead clamp assemblies where required.  Install blank connector plate with O-ring where required.  Install KF-40 vacuum valve.  Install KF-40 chamber containing the zeolite  Short Stack Assembly complete. Continue on to next page to complete the Long Stack Assembly. Blank Connector Plate KF40 Bulkhead Clamp Assembly Short Stack Assembly

Dewar Assembly Long Stack Assembly  Rotate the dewar 180° to complete the long stack assembly.  Clean the O-ring groove on the dewar shell.  Install O-ring in groove.  Install and secure the rear radiation shield to the inner structure with 5mm captive screws.  Install and secure blank cap radiation shield with 5mm socket head cap screws.  Install and secure dewar extension to the dewar shell.  Clean the O-ring groove on the extension dewar shell.  Install O-ring in groove.  Install KF-40 and KF25 Bulkhead clamp assemblies where required.  Install blank connector plate with O-ring where required.  Long Stack Assembly Complete. Long Stack Assembly