Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 1 of 18 Asphalt.

Slides:



Advertisements
Similar presentations
Costs and Benefits.
Advertisements

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 1 of 16 Discounted Cash.
Hawawini & VialletChapter 7© 2007 Thomson South-Western Chapter 7 ALTERNATIVES TO THE NET PRESENT VALUE RULE.
Capital Investments Chapter 12. Capital Budgeting How managers plan significant outlays on projects that have long-term implications such as the purchase.
Perpetual Pavements Concept and History Iowa Open House
Controversies in Trade Policy
Last Study Topics What To Discount IM&C Project. Today’s Study Topics Project Analysis Project Interaction – Equivalent Annual Cost – Replacement – Project.
Richard de Neufville © Michael Benouaich Slide 1 of 16 Massachusetts Institute of Technology Engineering System Analysis for Design Valuation with Simulation.
Engineering Systems Analysis Richard de Neufville © Massachusetts Institute of Technology Economic Evaluation Slide 1 of 22 Economic Evaluation l Objective.
Capital Budgeting Evaluation Technique Pertemuan 7-10 Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Copyright © 2009 Pearson Addison-Wesley. All rights reserved. Chapter 12 The Government Budget, the Public Debt, and Social Security.
Capital Budgeting Investment Rules
P.V. VISWANATH FOR A FIRST COURSE IN FINANCE 1. 2 Corporations pay taxes on their profits after interest payments are deducted. Thus, interest expense.
2015 Municipal Budget Overview Borough of Montvale April 14, 2015.
Contemporary Engineering Economics, 4 th edition, © 2007 Generalized Cash Flow Approach – Lease versus Buy Lecture No. 42 Chapter 10 Contemporary Engineering.
Dealing With Uncertainty
IE 3265 Production & Operations Management Slide Series 2.
Slide 1 Policy Alternatives to Stimulate Private Sector Investment in Domestic Alternative Fuels Wally Tyner with assistance from Dileep Birur, Justin.
CHAPTER 8 SAVING Plan for Financial Security
Slides prepared by Thomas Bishop Chapter 11 Controversies in Trade Policy.
IE 3265 Production & Operations Management Slide Series 2.
Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Flaw of Averages Slide 1 of 29 Richard de Neufville.
Engineering Systems Analysis Richard de Neufville © Massachusetts Institute of Technology Economic Evaluation Slide 1 of 22 Economic Evaluation l Objective.
Time Value of Money by Binam Ghimire
Patrick DeCorla-Souza, P3 Program Manager, FHWA
Renting, Leasing, Financing and Buying. Renting Rental: A short term agreement or contract under which property is rented from one person to another on.
FOOD ENGINEERING DESIGN AND ECONOMICS
Naval Postgraduate School Time Value of Money Discounted Cash Flow Techniques Source: Raymond P. Lutz, “Discounted Cash Flow Techniques,” Handbook of Industrial.
Summer Time Value of Money Session 2 07/02/2015.
1 Key Personal Finance Issues for Bob Carlson Editor, Retirement Watch AAII-DC October
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 11 Capital Budgeting.
Preliminary Financial Analyses February 2011 Presented by: David C. Miller Managing Director The PFM Group I-95 (Rest Area) Access Project.
Hawawini & VialletChapter 71 ALTERNATIVES TO THE NPV RULE.
© Copyright 2012 Milady, a part of Cengage Learning. All Rights Reserved. Chapter 2 Financing the New Business.
Economic Analysis: Applications to Work Zones March 25, 2004.
No Money Down Financing Find out how to buy a house with 0.00% down payment.
Chapter 9: Leased Fee and Leasehold Valuation. Introduction  Leases affect typical investment returns by impacting:  Net operating income  Reversionary.
DEVELOPMENT OF U.S. BANKING
Phoenix Convention Center Phoenix, Arizona Using Private Financing to Maximize Energy and Cost Savings Track 5: Project Financing Session 7: Economics.
Why Unit Cost Problems ©Dr. B. C. Paul Unit Cost Problems to Simplify Analysis  Some problems can be awkward to solve  Example -  IDOT plans.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Capital Budgeting Chapter 11.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. The Capital Budgeting Decision 12.
1 課程 6:Refinancing * 再看一個資本預算的例題 * 再訪 Buy or Lease *Refinancing *How do we adjust discount rates to reflect risk?
Financial Markets and Institutions
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 13 Duration and Reinvestment Reinvestment Concepts Concepts.
Financial Project Metrics in Feasibility Study
Unit Cost Problems to Simplify Analysis Some problems can be awkward to solve Example - –IDOT plans to make 127 from Murphysboro to Interstate 64 into.
Dynamic Strategic Planning Richard de Neufville © Massachusetts Institute of Technology Choice of Discount RateSlide 1 of 25 Choice of Discount Rate Discussion.
Chapter 12 Inflation Effects.
Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Engineering Economy Slide 1 of 13 Present Value, Discounted.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Generalized Cash Flow Approach –
Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Capacity ExpansionSlide 1 of 29 Capacity Expansion.
Leasing vs Buying: Which Is Best for You? When it comes to acquiring equipment, buildings or cars for your business, answering these five questions will.
Chapter 8 Capital Asset Selection and Capital Budgeting.
Introduction To Transportation Economic Analysis Discounting.
Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Engineering Economy Slide 1 of 14 Present Value, Discounted.
Engineering Systems Analysis for Design Massachusetts Institute of Technology Richard de Neufville © Decision Analysis Basics Slide 1 of 21 Calculations.
20 CHAPTER Social Security PUBLIC SECTOR ECONOMICS: The Role of Government in the American Economy Randall Holcombe.
Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Capacity ExpansionSlide 1 of 28 Capacity Expansion.
Needles Powers Crosson Financial and Managerial Accounting 10e Capital Investment Analysis 24 C H A P T E R © human/iStockphoto ©2014 Cengage Learning.
Engineering Systems Analysis for Design Richard de Neufville  Massachusetts Institute of Technology Review for Mid-termSlide 1 of 14 Review of 1st half.
Richard de Neufville © Michael Benouaich Slide 1 of 16 Massachusetts Institute of Technology Engineering System Analysis for Design Valuation with Simulation.
Investment Decision-making Learning Outcomes To be able to perform investment appraisal calculations (E) To be able to analyse the investment appraisal.
Topic 3: Finance and Accounts
CONTROLLING COSTS Choosing the Right Insurance Program Kevin D. Smith, CPCU, ARM Vice President Workers’ Compensation.
FINANCIAL RESOURCES MANAGEMENT
Cash Flow Estimation Chapter 10 © 2003 South-Western/Thomson Learning.
Aggregate Demand Model
Chapter 11: Breakeven and Sensitivity Analysis
Dick Dietrich, Accounting & MIS Anil Makhija, Finance
Presentation transcript:

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 1 of 18 Asphalt compared to Concrete for Highways An Exploration of Discounted Cash Flow Analysis in Practice

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 2 of 18 Basic Practical Issue: Which Technology? l Technologies often differ in Pattern of Cash Flows l A typical situation: –One may cost more, but save money, last longer –Another may be cheaper immediately, but cost more to operate, fail earlier l Let’s look at a practical example

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 3 of 18 Choice of Highway Pavement: Asphalt or Concrete l Concrete lasts longer -- is more expensive l Asphalt less expensive to place, but fails earlier l Both pavements eventually have to be resurfaced - typically with an asphalt coat l Which technology is better?

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 4 of 18 What is Life of Technology? l What is the “life” of equipment? l At what point does it fail or “die”? l Consider ‘statistical’ Analysis of US Experience, s –Life of Asphalt ~ 17 years –Life of Concrete ~ 27 years l Can we believe this?

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 5 of 18 Examination of Data on Highway Life l 1920s -- Boom Period - –Concrete highways l 1930s -- Depression –Asphalt highways l 1940s -- War –“Nothing” built l 1950s -- Reconstruction –Average age of concrete: 27 = –Average age of asphalt: 17 =

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 6 of 18 How might we determine life of project? l Set up Objective Criteria? –Such as?…… l Technologies fail differently… Test for failure of one does not apply to other... –Asphalt deforms, ruts –Concrete cracks l Ultimately, this is very subjective...

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 7 of 18 Example Analysis l Assumed Numbers –Asphalt costs 1000/unit initially –Concrete costs 20% more, 1200/unit –Cost of Resurfacing is 400/unit for each l See Example

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 8 of 18 Excel Set up for Analysis

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 9 of 18 PV of Asphalt (left) vs. Concrete (right) Breakpoint ~ 3.5% (in this example)

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 10 of 18 Cost Advantage of Concrete (Chart)

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 11 of 18 Lesson from Comparison l Choice of Technology may depend on choice of discount rate l Those who determine Choice of Discount Rate may be true designers l Why was most of US Interstate Highway System originally built of concrete? l but privately financed toll roads (such as Mass Pike) were not?

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 12 of 18 Finance Policies Influence Design l Consider standard process in which the central manager subsidizes the construction cost, but not the maintenance costs –By direct payment or tax credits –Common in the United States –Also applies to private organizations (MIT, …) l What is the effect of such policies? l Favors technology that costs more at start

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 13 of 18 Effect of 50% Subsidy of Investment: breakeven point shifted from 3.5 to ~ 7%

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 14 of 18 Cost Advantage of Concrete (with 50% subsidy)

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 15 of 18 Lesson of Effect of Subsidy l Policies that affect only part of the cash flow, affect the relative merits of alternative technologies. l Subsidies on Construction costs favor more expensive investments l US Government pays States up to 90% of initial investment for Interstates l This is a major reason why Interstate System is built in concrete….

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 16 of 18 Importance of Life of Project (20 versus 40 highway life )

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 17 of 18 Lesson from alternative life of projects l Using higher discount rates makes events in distant future insignificant l Cut life of project in half (in example) changes Present value by a few percent –not significant in terms of accuracy of forecast estimates of costs, benefits l Exception: If Discount rates < 5% or so

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 18 of 18 Lessons from Example l Analyses simple, HOWEVER l Results depend highly on assumptions –About discount rate –About tax or subsidy incentives –Even about life of project l Designers of Tax, Economic Programs may be actual System Designers