European Asphalt Pavement Warranties Scan September 14-28, 2002.

Slides:



Advertisements
Similar presentations
HMA Warranties Seminar for CALTRANS Lee Gallivan FHWA Indiana Division April 3 rd, 2003.
Advertisements

Innovative Contracting
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Wyoming County Paved Roads Management and Monitoring Khaled Ksaibati, Ph.D., P.E. STIC June, 2014.
1 Preserving Municipality Roadways Federal = 3% State = 20% Local = 77% 94% of paved roads have an Asphalt surface FHWA Source: Stephen R. Mueller,
Selecting the Right Maintenance Treatment Sponsored by: Minnesota LTAP Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman,
Perpetual Pavements Concept and History Iowa Open House
EVOLVING DEMANDS Highway Usage Increased 29% in the 1990’s Truck Traffic Increased 40% in the 1990’s Truck Traffic Will Increase 3% per year in next 20.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
6 TH ANNUAL CONFERENCE. Footer Text Date PERFORMANCE-BASED MAINTENANCE APPROACH DB/P3 Edward P. Pensock, Jr. P.E. Strategic Project Division Director.
Why Pavement Maintenance and Preservation? Sponsored by: Minnesota T 2 Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman,
A Urban Highway Infrastructure: Design For Long, Long Life Michael I. Darter, Ph.D, PE Principle Engineer, ARA, Inc. Director, Pavement Research Institute,
Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU The Private Sector Perspective on PPP Projects/Concessions.
Factors to Consider in Innovative Contracting Doyt Bolling and Jared Holland Utah Technology Transfer Center.
PAVEMENT CONDITION SURVEYS Lecture 4. Instructional Objectives n Need for condition surveys n Collection methodologies n Four basic types of condition.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
Functional (Performance-based) Maintenance Contracting in Denmark By Susanne Baltzer Danish Road Directorate Denmark.
Optimal Highway Durability in Cold Regions Jia Yan Washington State University 18 June 2015.
1 Extended Duration Warranties, Performance Warranties, and Liquidated Damages in Construction Contracts – What are the Risks? Presented by: Gene Rash.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
Patrick DeCorla-Souza, P3 Program Manager, FHWA
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Using Value for Money Analysis to Evaluate Highway Public-Private Partnership Projects ARTBA P3 Conference Washington, DC, July 15-17, 2015 Patrick DeCorla-Souza,
Pavement Distresses Flexible Pavement
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
AASHTO SCOP Linking Planning to Programming P2P Link Rural Transportation Summit January 16, 2014 ADOT Vision and Long-Range Plan Planning to Programming.
ROAD PAVEMENT FORUM RECENT EXPERIENCES ON PPGS PROJECTS HISTORY 1993 RPF (BMLC) PPGS Task Group Formed 1994CAPSA Resolution to promote concept 1996Initial.
National Highway Institute Federal Highway Administration
1. Concession Agreements The Focus Georgia Conference Thomas W. Pelnik III, P.E. Director, Innovative Project Delivery Division April 26, 2007.
Pavement Preservation Preventive Maintenance
AASHTOWare Program Overview to the Safety Data Systems Task Group of the Safety Management Subcommittee Presented by Tony Bianchi, Project Manager AASHTO.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
How To Structure a P3.
Session 2 Introduction to Pavement Preventive Maintenance Concepts.
ITS Georgia | June What is the role of ITS in the emerging public/private partnership transportation market in Georgia? ITS Georgia Monso_Julia.
MICHIGAN EXPERIENCE WITH WARRANTY WORK. Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned.
PAVEMENT MAINTENANCE 1: Part 1: Pavement Preservation Idaho Roads Scholar Program.
HBP Warranties – The Cost Benefit Evaluation Begins By: Jay Goldbaum, P.E. Colorado Department of Transportation Pavement Management and Design Program.
1 APPLICATION ON THE SPANISH CONCESSIONAL MODEL TO CENTRAL AND ESTERN EUROPE WORLD BANK WORKSHOP ON PPP IN HIGHWAYS: INSTITUTIONAL, LEGAL, FINANCIAL AND.
Projects of National and Regional Significance Program.
National Cooperative Highway Research Program (NCHRP)
MnDOT Road Research Update Maureen Jensen Benjamin Worel TRB January 17, 2013.
MAKING IT HAPPEN. TRB 88 th Annual Meeting Risk Management in Public-Private Partnerships January 14, 2009 Statutory and Public Policy Approaches to PPP.
CONFIDENTIAL Virginia’s PPEA, NC SB 822, and Lessons Learned Institute for Emerging Issues North Carolina State University.
2003 Warranty Presentations Caltrans WARRANTED HMA PAVEMENTS PAVEMENTS.
Pekka Pakkala IRF PPP Presentation - Oct Public-Private-Partnerships (PPP) – “An International Perspective"
AGRÈMENT CERTIFICATION OF THIN LAYER ASPHALT Dennis Rossmann RPF - May 2005.
BLOCK 4 SELECTION OF THE PREFERRED ALTERNATIVE Pavement Data Collection Project evaluation Select feasible alternatives Reconstruction Restoration Recycling.
Insert picture(s) here Amy Simpson, Ph.D., P.E. Gonzalo Rada, Ph.D., P.E. Beth Visintine, Ph.D. Jonathan Groeger Rutting as a Performance Indicator.
A Strategic Plan for Pavement Engineering NCHRP 20-7(223) AASHTO Joint Technical Committee on Pavements Dan Dawood, P.E. Pennsylvania Department of Transportation.
Greece Public Sector Martin S Hirko, MIRCS: Regional Director, Faithful+Gould November 2015 Restructuring Greece: Project Managing the Challenge.
Rijkswaterstaat 1 Market approach. Rijkswaterstaat 2 Contents history types of functional contracts in the Netherlands –performance contracts –engineering.
Julia M. I. Holden Davis Innovative Project Delivery Methods for Infrastructure Authored by: Pekka Pakkala Presented January 24, 2012.
Economic Advisory – PPP Unit 1 Public-Private Partnerships and the FGP Isaac Averbuch Washington Oct, 2008.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
Overview of dTIMS Input, Analysis and Reporting HTC INFRASTRUCTURE MANAGEMENT LTD.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved. © 2014 HDR, all rights reserved.
Using Public-Private Partnerships to Move More People The Story of HOT Lanes in Northern Virginia January 30, 2017 Morteza Farajian, Ph.D.
European Asphalt Pavement Warranties Scan
Presenters: Sumon Roy1 and Badrul Ahsan1
Enterprise Content Management Owners Representative Contract Approval
CHANGING PROJECT DELIVERY SYSTEMS
Pavement Working Group
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
EXPERIENCES FROM LONG-TERM
Presentation transcript:

European Asphalt Pavement Warranties Scan September 14-28, 2002

FHWA International Technology Scanning Program Bringing Global Innovations to U.S. Highways

Sponsored 50 scans since 1990 Snowplow air and pavement temperature sensors Heavy-duty asphalt that resists rutting Safer bicycle and pedestrian lane design Innovative contracting FHWA International Technology Scanning Program

European Asphalt Warranty Scan Scan goals to determine: Practices to maintain prescribed levels of asphalt pavement smoothness and skid resistance Criteria used in successful asphalt pavement warranties Pavement performance prediction tools

Warranty Definitions Warranty Performance-based contract Guarantees the integrity of a product Contractor responsible for replacement of defects Warranty Period Pre-specified for repair defects in the product Provide assurance of performance, but not to unnecessarily inflate contract prices

Warranty Definitions Materials and Workmanship Method specifications Includes distresses resulting from defective materials and/or workmanship Performance Performance specification Contractor designs some level of structural pavement and/or mix decisions Includes full responsibility for pavement performance

Summary Observations Material and workmanship warranties common All have at least 1 to 4 year warranties Several have 5 year performance warranties Many countries trying 10 to 18 year performance warranties

Duration of Warranty (years) Materials and Workmanship PerformanceMaterials and Workmanship Pavement Performance Contracts Pavement Performance Contracts “Functional” Design-Build Finance Operate Method Specification End Result Specification Method Specification End Result Specification Spain UK 1-2 Germany 4 Denmark Sweden UK 5 Denmark Sweden Spain UK Germany 20 Summary Observations

Warranty Involvement DesignConstTrafficking Warranty Involvement Warranty/Performance Involvement DesignConstTraffickingDesignConstTrafficking Warranty/Performance Involvement Anticipated Maintenance Material & Workmanship DesignConstTrafficking Short-Term Performance Long-Term Performance Design-Build Finance Operate

Summary Observations Performance warranties typically cover ride, friction, rutting, cracking, and durability The contractor designs the materials and structure to meet performance criteria

Summary Observations No countries use low bid to award large project contracts Prequalification and Best-Value used by all countries Criteria include design, safety, innovation, environment, and extended warranties Panels evaluate the tenders based on set and transparent procedures

Summary Observations All host countries believe warranties have improved quality Performance warranties have allowed some innovation by the contractor over materials and workmanship

Project Scope Definition New, resurfacing, and reconstruction Dependent primarily on size of project Owner determined traffic loads and pavement condition data Prime contractor responsibility Some user delay costs

Pre-Contract Award Procurement Similar in all Countries Pre-qualification processes Best-value selection Noted as key to success in all countries

Bonding Construction and warranty bonds were used, but varied in length Examples Germany – 5% const. & 2% warranty Denmark – 15% const., 10% year 1 and 2% for remaining warranty Sweden – 10% construction

Design-Methods Both method and end results specifications are used Performance warranties involved more contractor design Concessions involved the most freedom of design

Operation and Maintenance Maintenance is “implicitly” included for material & workmanship and short-term performance contracts Maintenance is “explicitly” included for long-term performance and concession contracts

Corrective Action In all countries, prime contractor is responsible for corrective action In Denmark, corrective action is paid for in an prorated amount Conditions to void warranty exist (i.e. heavy traffic loads, owner error, etc.) In all countries, corrective action is noted in the next bid

Project Performance Warranty performance measurements varied, but are similar to US IRI Friction Rutting Longitudinal Cracking Transverse Cracking

Pavement Performance Contracts PPC are long-term resurfacing and maintenance contracts Length varied by country Sweden – 5-8 years Denmark – years Germany – 20 years Contractor is responsible for design, construction, maintenance, and some financing

Pavement Performance Contracts Maintenance Classification Filling of isolated potholes, minor pavement remarking Crack filling or micro surfacing of a significant area of paving Asphalt OverlaysMill and overlay of a significant section of pavement MaintenanceMajor Maintenance RehabilitationReconstruction Routine/ Normal Maintenance Remedial Action

DBFOs (Concessionaires) Design-build, operate, and finance contracts were seen in Spain and UK year contracts most common DBFO has life-cycle motivation Used as financing vehicle to increase private investment or reduce national debt Use of shadow tolls for repayment of debt Number of projects varies by country

Maintenance Agreements Spain and UK are outsourcing maintenance Similar performance measures to warranties Spain year contracts UK 5 year and longer contracts

Summary Observations Customer-focused partnership between government and industry Prequalification and best-value procurement enable warranties M&W warranties have long history in Europe Long-term performance warranties include design, construction, and maintenance

Recommendations Federal Require M&W warranties on all federally funded projects Promote/enable best-value and prequalification legislation Create an asphalt warranty resource center

Recommendations State Create model warranty documents (AASHTO) Implement M&W warranties Implement short-term performance warranties Enable best-value and prequalification procedures

Recommendations Industry Become educated on warranty issues and risks Participate in warranty policy discussions Propose on warranty projects Consider providing operation and maintenance services

Implementation Awareness Publications and presentations Understanding Implementation guides and models Commitment Federal, State, and Local endorsement Action Compilation and evaluation of implementation results