ADEC MG3/MG9/GP3 Public Workshop Asphalt Plants and Rock Crushers Matt Wilkinson and Moses Coss.

Slides:



Advertisements
Similar presentations
Cathy Beahm Technical Assistance Specialist NH DES, Air Resources
Advertisements

DRAFT IRON & STEEL FOUNDRY MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART EEEEE.
2013 Emissions Inventory Workshop EXAMPLE CALCULATIONS.
2014 Emissions Inventory Workshop How to Calculate Your Emissions CO VOC E = A × EF PM NOx 2000 lb/ton.
Air Permitting and Compliance Smithfield Foods Environmental Conference Chicago, IL July 2013.
APAI Environmental Workshop FESOP Recordkeeping/Plans James (Jim) Heim, C.T.C., E.P. Bruce Carter Associates, L.L.C February 9, 2012.
Welcome 2014 Triennial Emissions Inventory Workshop.
Emergency Engine Emissions Standards
1 Air Management Programs Legislative Audit Bureau May 2004.
Iowa Title V Operating Permits Lori Hanson, Title V Operating Permit Section Supervisor.
New Federal Regulations for Internal Combustion Engines Doug Parce.
Blue Skies Delaware; Clean Air for Life Small Boiler Permits State of Delaware DNREC - Air Quality Management William K. Harris.
Air Permitting Overview.
Compliance Update NCMA 2015.
Presentation to Board of Forestry November 29, 2011 Alice Edwards Division of Air Quality Alaska Department of Environmental Conservation
Air Quality Regulations and Academic Institutions Steve Hall Environmental Engineer II NC DENR – Division of Air Quality Raleigh Regional Office.
Proposed Revisions to Colorado Air Quality Control Commission Regulation No. 7 Garry Kaufman Air Pollution Control Division Air Pollution Control Division.
Managing Air Quality Data 101 Presented by: Chris Bellusci & Claire Lund, PE (Sanborn Head) International Conference for Environmental.
ONROAD AND NONROAD VEHICLES EMISSION STANDARDS February 9, 2010 By: Udomlug (Nok) Siriphonlai, P.E. Westchester County Department of Health.
Maricopa County Air Quality Department 1001 North Central Ave. Phoenix, Arizona Maricopa County Air Quality Department Protecting and improving our.
1 Improving Environmental Protection and Reducing Administrative Burden North Carolina Division of Air Quality Improving Environmental Protection and Reducing.
Delivering sustainable solutions in a more competitive world GHG Mandatory Reporting Rule – Implications for PSD Review for GHG September 2012 Ramesh Narasimhan.
A Proposal to Fund the Air Quality Bureau of the Iowa Department of Natural Resources Mick Durham.
1 Overview of Emissions Inventories Melinda Ronca-Battista, ITEP/TAMS Center.
Compliance Assistance and Ambient Air Monitoring Brian Hutchins Supervisor, Air Quality Bureau July 2014.
Our Vision – Healthy Kansans living in safe and sustainable environments.
Air Quality 101 Kansas Air Quality Program overview.
1 EPA’s Proposal for Nonroad Diesel Engines & Fuel May 2003 U.S. Environmental Protection Agency Office of Transportation and Air Quality Informal document.
CANDACE CARRAWAY OFFICE OF AIR QUALITY PLANNING AND STANDARDS US EPA JUNE 2013 General Permits and Permits by Rule 1.
Air Quality Regulations – What’s New? (for Ethanol Plants) Shelley Schneider Air Quality Division Administrator.
Notices to Comply (NTC) and Notices of Violation (NOV) March 22, 2006 Peter Moore Yorke Engineering, LLC x24
Navajo Nation Operating Permit Program
Welcome Revisions of Chapter WAC Sections -035 and -036 Rule advisory committee workshop #5 Lacey, WA October 28, 2009.
SCAQMD Air Quality Permitting for Emerging Technologies Jay Chen, P.E. South Coast Air Quality Management District November 4, 2009 Southern California.
Developing an In-House Air Quality Audit Program March 22, 2006 Judy B. Yorke Yorke Engineering, LLC x25
Emission Inventories and EI Data Sets Sarah Kelly, ITEP Les Benedict, St. Regis Mohawk Tribe.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
June 13, 2013 Joy Wiecks Fond du Lac Reservation 1.
Region 9 Title V Permit Review Guidelines Ray Vogel EPA/OAQPS.
Current and Future Air Quality Issues Facing the States Bart Sponseller Air Management Bureau Director Joseph Hoch Regional Pollutants Section Chief NASA.
Minor NSR Program and Highlights of the Proposed Tribal Major Nonattainment and Minor NSR Rules Jessica Montañez U.S. Environmental Protection Agency Office.
1 Modeling Under PSD Air quality models (screening and refined) are used in various ways under the PSD program. Step 1: Significant Impact Analysis –Use.
PM 2.5 Stakeholder Working Group Meeting #1 South Coast Air Quality Management District June 8, 2006.
Permitting and National Ambient Air Quality Standards Changes Rick Goertz, P.E. Air Permits Division Texas Commission on Environmental Quality Advanced.
Carrie Paige – EPA Region 6, Dallas David Cole – EPA OAQPS, RTP, NC Introduction to Air Permits Introduction to Air Permits.
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
Navajo Nation Air Quality Control Program Operating Permit Program Navajo Nation Environmental Protection Agency Route 112 North/Bldg Fort Defiance,
Tribal Permitting Conference 2013 Steve Dunn, P.E., Construction Permit Team Leader; Bureau of Air Management (608) ;
Public Workshop Proposed RACT/BARCT Determination for Stationary Spark-Ignited Internal Combustion Engines August 29, 2000 California Environmental Protection.
National Workshop on Urban Air Quality and Integrated Traffic Management Karachi, September 13-14, 2006.
Resource Management Planning Air Quality Brock LeBaron Department of Environmental Quality Division of Air Quality
WESTAR 2003 Fall Technical Conference Introduction to Class I Area Impact Analyses September 16, 2003 John Bunyak National Park Service.
TAS and TIP Swinomish Tribe and the Incremental Approach.
PROPOSED AMENDMENTS TO THE STATEWIDE PORTABLE EQUIPMENT REGISTRATION PROGRAM California Environmental Protection Agency Air Resources Board June 22, 2006.
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
1 Nez Perce Reservation Presented by Mary Fauci Tribal NSR Training Temecula, CA 11/1/11.
2012 Emissions Inventory Workshop 1. 2  The owner or operator of any facility that is a source of air contaminants shall submit a complete emission.
1 Public Workshop to Discuss Amendments to the AB 2588 “Hot Spots” Emission Inventory Criteria and Guidelines Regulation California Air Resources Board.
Tailoring Rule - Title V Scenarios July 20, 2010 Katherine N. Blue Principal Consultant, Climate Change Services trinityconsultants.com Troutman Sanders/Trinity.
NAAQS Status in GA & PSD Inventory Update James W. Boylan Georgia EPD – Air Protection Branch Manager, Planning & Support Program AWMA Regulatory Update.
Iowa Waste Reduction Center Jennifer Wittenburg - Program Manager
Developing a Tribal Implementation Plan
Complying with Periodic Emissions Monitoring Requirements
ONROAD AND NONROAD VEHICLES EMISSION STANDARDS
NEW General Permit-005A Emergency Generators
Simple but Complicated Air Quality Permitting for Generators
Air Permitting General Permit Updates
Boiler Sheltered Initiative
Kansas Air Quality Seminar March 5, 2008
Presentation transcript:

ADEC MG3/MG9/GP3 Public Workshop Asphalt Plants and Rock Crushers Matt Wilkinson and Moses Coss

Who? & When Owners and Operators: –Asphalt plants –Rock Crushers Must have air quality permit before: –Constructing –Operating –Relocating

Where? Anywhere in Alaska! Relocation notices when you move Special requirements for Alaska Coastal Management Program (ACMP) – alldistEPS.htmlhttp://alaskacoast.state.ak.us/Explore/ alldistEPS.html

Why? It’s State and Federal law!! Protect human health & environment Helps us track emissions inventory Cheaper than source-specific permit Level playing field; all w/same permit Easier to address public complaints

How? Asphalt Plants need an MG3 or GP3 –MG3, “minors,” never expire –GP3, “majors,” expire in 5 yrs (in 2014) Rock Crushers need an MG9 See Section 1 qualifying criteria nperm.htmhttp:// nperm.htm

Old GP3 vs. New MG3 Less cost (minor), no expiration date, simpler MR&R, less EPA oversight Need separate (but similar) permits for asphalt plants and rock crushers Annual compliance certification gone Most key requirements unchanged Format updated to keep up w/change

Cost? Shelly Betlej, (907) See 18 AAC 50, Article 4 –MG3 = $ (one-time fee) –MG9 = $ (one-time fee) –GP3 = about $2,500? (permit not finished yet) Annual compliance review fees = –$530/yr (MG3/MG9); $530/yr (GP3) Annual emission fees Time & materials for technical assistance

What? Read your permit carefully! –Ignorance is not bliss—unknown can hurt Biggest challenge might be Section 2 –Visible Emissions (“smoke school”)—all –Particulate Matter—asphalt plants –Sulfur emissions—remember paperwork –Distances away and fugitive dust plan

Smoke School? Visible emissions measured in opacity –0%, nothing; 100%, can’t see; 20%, limit Two tests to get certified: –One-time, half-day class training/test –Semiannual field test to calibrate eyes From a stack or fugitive emissions Get staff certified (or contract it)

How to stay out of trouble? Read and comply with your permit Pay all your invoices from ADEC Cooperate with inspectors w/smile:<) Monitor as required, Record what you monitor, Report on time (MR&R) Be a good neighbor, avoid complaints Squeaky clean operation and records

Reports Semiannual operating reports Annual compliance certification—GP3 Excess emission/permit deviation Source test reports—MG3 and GP3 Location Change and ACMP Annual emission calculations / fees

Emissions Calculations, what and why? Two purposes: –Potential to emit for classification Major (>= 100 tpy) or Minor (< 100 tpy) Tpy = tons per year for each air pollutant –Actual emissions for fees (Section 12) Asphalt plant or rock crusher Diesel engines (excluding nonroad engines) 5 air pollutants—CO, NOx, PM, SO2, & VOC

Actual Emissions Calculations plants and crushers, how? Emissions = (EF x (Hours of operation * RC)) / lbs per ton –EF = emission factor from a table (look up by air pollutant and source type) –Hours of operation from your logbook –RC = rated capacity of your source in tons per hour (don’t confuse with tpy) –Lbs per ton = 2,000 (conversion factor)

Actual Emissions Calculations, how—diesel engines? Emissions = ((EF x Hp) * Hours of operation) / lbs per ton (preferable) –EF = emission factor from a table (look up by air pollutant and fuel type) –Hp = horsepower (engine rating) –Hours of operation from your logbook –Lbs per ton = 2,000 (conversion factor)

Actual Emissions Calculations, how—diesel engines? Emissions = ((EF x MMBtu) x Hours of operation) / lbs per ton –EF = emission factor from a table (look up by air pollutant and fuel type) –MMBtu = fuel heat (not process heat) MMBtu = #gal x about 0.14 MMBtu/gal MMBtu = #MMscf x about 1,000 MMBtu/MMscf –Hours of operation from your logbook –Lbs per ton = 2,000 (conversion factor)

Assessable Emission Calculations, how? Add to get 5 totals from all units –E.g., 7 tpy CO from asphalt plant + 5 tpy CO from one generator + 3 tpy CO from another generator = 15 tpy CO –Ditto for NOx, PM, SO2, & VOC Any total < 10 tpy is zero assessable for that air pollutant Multiply each total >= 10 tpy times the $/ton (18 AAC ); add these costs –E.g., 15 tpy CO costs $300/year if $20/ton

U.S. EPA? Environmental Protection Agency (EPA) = ADEC’s federal equivalent Oversees ADEC’s Air Quality Program Can delegate to States, tribes, and cities NSPS 40 CFR 60 reports go to EPA –E.g., Subpart I—MG3, Subpart OOO—MG9, and Subparts IIII and JJJJ—diesel engines Can inspect you after showing credentials

Thanks for attending! Questions??! Please don’t leave until you feel comfortable with these new permits You can attend other public workshops this week in person or by phone for free without registration Compliance staff will facilitate last workshop in Fairbanks on April 30 th